BLD-Final | 9/12/2000 | 9/13/2000 | 9/13/2000 | A | PASS |
Russ Owen
|
|
|
dwayne ###-#### Note 2 handrails at stairs and plywood guard rails at upper floor spindles on back order. 9/13/2000 2:09:52 PM
|
BLD-Final | 9/13/2000 | 9/13/2000 | 9/13/2000 | P | CANC |
Tony Young
|
|
|
dwayne ###-####
russ did 9/13/2000 2:15:31 PM
|
BLD-Final | 9/12/2000 | 9/12/2000 | 9/12/2000 | P | CANC |
Russ Owen
|
|
|
FN OCC DWAYNE ###-#### . 9/13/2000 8:22:08 AM
|
BLD-Framing/Rough-in | 5/23/2000 | 5/23/2000 | 5/23/2000 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/22/2000 | 5/22/2000 | 5/22/2000 | P | FAIL |
Russ Owen
|
|
|
framing inspection C/N posted (1) correction left. Truss repair. 5/23/00 2:37:04 PM
|
BLD-Framing/Rough-in | 5/22/2000 | 5/22/2000 | 5/22/2000 | P | PASS |
Russ Owen
|
|
|
sheer inspection ###-####
|
BLD-Framing/Rough-in | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | FAIL |
Russ Owen
|
|
|
###-#### C/N posted 5/22/00 10:07:07 AM
|
BLD-Framing/Rough-in | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | FAIL |
Russ Owen
|
|
|
shear wall C/N posted 5/22/00 10:52:51 AM
|
BLD-Framing/Rough-in | 5/12/2000 | 5/12/2000 | 5/12/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### C/N posted 5/15/00 11:04:18 AM
|
BLD-Framing/Rough-in | 5/10/2000 | 5/11/2000 | 5/11/2000 | A | CANC |
Tom Arcoraci
|
|
|
Duane ###-#### Unable to get to in am 5/12/00 8:48:59 AM
|
BLD-Framing/Rough-in | 5/12/2000 | 5/11/2000 | 5/11/2000 | P | FAIL |
|
|
|
Added by Inspector: 338 On 05/12/2000 not all straps in place siders covering walls without approvals phone conversations with 407 not documented
|
BLD-Framing/Rough-in | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### shear nail. No approved plans/also engineering may not match. Left C/N posted.
|
BLD-Foundation | 4/4/2000 | 4/4/2000 | 4/4/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/04/2000 at 06:58:22. Contact: ###-####.
|
BLD-Footing | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PASS |
Russ Owen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/3/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/3/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 3/28/2000 | | 4/3/2000 | | PASS |
Steve Munroe
|
|
|
4/3/2000 11:44:26 SAM - activity updated through activity BLDA022 from case BLD00-00664.
|
Pending Assignment by DJO | 3/16/2000 | | 3/28/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 3/16/2000 | 3/16/2000 | 3/17/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 3/16/2000 | 3/16/2000 | 3/16/2000 | | DONE |
|
|
|
|
Application received | | | 3/16/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 3/17/2000 | 3/17/2000 | | | PEND |
|
|
|
|
Telephone call | | | | | PEND |
|
|
|
03/28/00 10:10 Called and left a message for Tim Johnson, Briggs Engineering, to call me regarding this project. John Morton did the engineering, but, he is not in this week. I have questions regarding post size in garage and shear wall line 4.
|
Meeting | | | | | PEND |
|
|
|
4/3/00 10:15 Builder came in to find out what the hold up is on the plan. I informed him that I am waiting for conformation from the engineer on bracing. The builder took a set of plans to the engineering firm to get the okay from them.
4/3/00 11:10 Builder brought in letter from engineer.
|