BLD-Final | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PASS |
Tony Young
|
|
|
John ###-####
c of c issued 5/24/2001 1:03:17 PM
|
DOC - Permit Finaled | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 5/24/2001 1:02:49 PM
|
BLD-Grading Inspection | 3/22/2001 | 3/22/2001 | 3/22/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Energy code compliance | 8/7/2000 | 8/7/2000 | 8/7/2000 | P | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/2/2000 | 8/2/2000 | 8/2/2000 | P | PART |
Tony Young
|
|
|
###-####
ok to insulate 8/2/2000 4:40:04 PM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | FAIL |
Tony Young
|
|
|
john ryan ###-#### C/N left- outside shear insp. only ok to side part. 7/18/00 2:14:22 PM
|
BLD-Footing | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PART |
Jim Storey
|
|
|
Brian ###-#### stil need 3500 psi concrete justifacation 4/13/00
|
BLD-Footing | 4/10/2000 | 4/11/2000 | 4/11/2000 | P | PART |
Jim Storey
|
|
|
ryan ###-#### recieved engineer approval of footing site grade. 3500 psi concrete spec. on engineering. contractor to get special insp. or have engineer change design submit to bldg. dept... 4/11/00
|
BLD-Footing | 4/10/2000 | 4/11/2000 | 4/11/2000 | P | PART |
Jim Storey
|
|
|
ryan ###-#### recieved engineer approval of footing site grade. 3500 psi concrete spec. on engineering. contractor to get special insp. or have engineer change design submit to bldg. dept... 4/11/00
|
Plan assigned to (DJO) | 4/10/2000 | 4/10/2000 | 4/10/2000 | | PASS |
Dan Overy
|
|
|
4/10/2000 08:13:33 DJO - activity updated through activity BLDA022 from case BLD00-00683.
|
Print Pending Permit.LaserJet4 | | | 4/10/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/10/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/10/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/10/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/10/2000 | | DONE |
|
|
|
left message gave dollar amount
|
Issue PAID IN FULL permit | | | 4/10/2000 | | DONE |
|
|
|
|
Plan Review Report | | | 4/10/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/10/2000 | | |
|
|
|
|
Routing - PLANNING | 3/27/2000 | 3/27/2000 | 3/28/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 3/16/2000 | 3/16/2000 | 3/27/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 3/16/2000 | 3/16/2000 | 3/27/2000 | | PASS |
Rita DeYoung
|
|
|
took to terry records
Approved as category 3.
|
Application received | | | 3/16/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 3/28/2000 | 3/28/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 3/16/2000 | | | | PEND |
Dan Overy
|
|
|
|