BLD-Final | 8/21/2000 | 8/22/2000 | 8/22/2000 | A | PASS |
Russ Owen
|
|
|
dixie passed the mec on 7-26-00\\###-####
|
BLD-Final | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | FAIL |
|
|
|
Terry ###-#### c/n issued mech insp not done 8/21/00 3:07:12 PM
|
BLD-Final | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Terry, ###-#### cn posted 7/27/2000 12:17:52 PM
|
BLD-Wall cover | 6/5/2000 | 6/5/2000 | 6/5/2000 | P | PASS |
Russ Owen
|
|
|
Eric, ###-#### - shear wall
|
BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 | A | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 17:45:25. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | FAIL |
Tom Arcoraci
|
|
|
eric ###-#### r/i See C/N R-15 requried in floor & walls. 5/30/00 9:51:16 AM
|
BLD-Wall cover | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | PART |
Tom Arcoraci
|
|
|
Eric, ###-#### - shear wall Ok to side 5/26/00 12:09:48 PM
|
BLD-Wall cover | 5/18/2000 | 5/19/2000 | 5/19/2000 | P | FAIL |
Russ Owen
|
|
|
Shear reinspect - Eric, ###-#### C/N posted 5/22/00 10:44:14 AM
|
BLD-Wall cover | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | CANC |
|
|
|
Eric, ###-#### shear wall done by 407 5/17/00 7:22:20 AM
|
BLD-Wall cover | 5/16/2000 | 5/16/2000 | 5/16/2000 | A | PART |
Russ Owen
|
|
|
All ok except front wall upper and lower C/N posted.
|
BLD-Wall cover | 5/9/2000 | 5/10/2000 | 5/10/2000 | P | FAIL |
Russ Owen
|
|
|
Eric, ###-#### - shear wall C/N posted 5/12/00 9:03:48 AM
|
BLD-Wall cover | 5/8/2000 | 5/9/2000 | 5/9/2000 | P | CANC |
Russ Owen
|
|
|
Eric, ###-#### - shear wall - as late as possible, please By contractor. 5/11/00 10:58:35 AM
|
BLD-Foundation | 4/12/2000 | 4/12/2000 | 4/12/2000 | P | PART |
Russ Owen
|
|
|
###-#### Not complete, but wants to pour later today 4/13/00 8:59:21 AM
|
BLD-Footing | 4/10/2000 | 4/11/2000 | 4/11/2000 | A | PASS |
Russ Owen
|
|
|
jack ###-####
|
BLD-Footing | 4/10/2000 | 4/10/2000 | 4/10/2000 | P | NR |
Russ Owen
|
|
|
###-#### Nothing at site 4/11/00 10:46:07 AM
|
Plan assigned to (SAM) | 3/29/2000 | | 4/4/2000 | | PASS |
Steve Munroe
|
|
|
4/4/2000 07:37:31 SAM - activity updated through activity BLDA022 from case BLD00-00699.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/4/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/4/2000 | | DONE |
|
|
|
talked to toby gave dollar amount
|
Issue PAID IN FULL permit | | | 4/4/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/31/2000 | | PEND |
|
|
|
Chris Roth brought in new plans at 15:25 on 3/31/00.
|
Pending Assignment by DJO | 3/17/2000 | | 3/29/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 3/17/2000 | 3/17/2000 | 3/22/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 3/17/2000 | 3/17/2000 | 3/22/2000 | | DONE |
|
|
|
|
Application received | | | 3/17/2000 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | DONE |
|
|
|
Only ONE complete set of plans submitted, so only ONE set approved.
|
Telephone call | | | | | FAIL |
|
|
|
03/29/00 16:20 Called and talked to Toby with Roth Homes. I told him they need to come pick the plans up, they are being rejected. The plans need a lot of information to make them exceptable.
|