BLD-Final | 7/12/2001 | 7/12/2001 | 7/12/2001 | P | PASS |
Steven Webb
|
|
|
nick ###-#### code for garage door opener is 0474 enter C. of C #20455 issued. 7/12/2001 2:10:41 PM
|
DOC - Permit Finaled | 7/12/2001 | 7/12/2001 | 7/12/2001 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 7/12/2001 2:10:45 PM
|
CHANGE STATUS TO (ISS) | | | 7/12/2001 | | DONE |
|
|
|
as per Bob Archibald change status to issue... batch file expired.
|
BLD-Framing/Rough-in | 6/12/2000 | 6/13/2000 | 6/13/2000 | A | FAIL |
Russ Owen
|
|
|
nick ###-####
|
BLD-Framing/Rough-in | 6/12/2000 | 6/12/2000 | 6/12/2000 | P | PART |
Russ Owen
|
|
|
Nick ###-#### Complete prior c/n. 6/13/00 10:14:11 AM
|
BLD-Energy code compliance | 6/12/2000 | 6/12/2000 | 6/12/2000 | P | PASS |
Russ Owen
|
|
|
Nick ###-####
|
BLD-Framing/Rough-in | 6/7/2000 | 6/7/2000 | 6/7/2000 | A | FAIL |
Russ Owen
|
|
|
C/N posted
|
BLD-Framing/Rough-in | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### See C/notice 5/30/00 9:50:53 AM
|
BLD-Foundation | 4/24/2000 | 4/25/2000 | 4/25/2000 | A | PASS |
Russ Owen
|
|
|
Brent ###-#### suggested to contractor to check placement of hold-downs. 4/26/00 11:51:36 AM
|
BLD-Footing | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | PART |
Jim Sly
|
|
|
###-#### Footing appears ok. 4/21/00 2:01:32 PM
|
Issue PAID IN FULL permit | | | 4/14/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 4/3/2000 | 4/3/2000 | 4/13/2000 | | PASS |
Dan Overy
|
|
|
4/13/2000 10:16:04 DJO - activity updated through activity BLDA022 from case BLD00-00744.
|
Plan Reviewer's activity | | | 4/13/2000 | | DONE |
|
|
|
4-12-2000 Dakota design brought in plan change out sheets and new engineering from Michael K. Brown, professional engineer.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/13/2000 | | DONE |
|
|
|
|
Plan Review Report | | | 4/13/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/13/2000 | | DONE |
|
|
|
talked to linda to verify plans are ready
|
Plan Reviewer's activity | | | 4/3/2000 | | DONE |
|
|
|
have called both jay jobes of dakota design and nick of nemec about lateral analysis of structure plus beam identification on plans to match calculation sheets.
|
Plans ACCEPTED BY PLAN CHECK | | | 4/3/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/22/2000 | 3/22/2000 | 3/24/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 3/22/2000 | 3/22/2000 | 3/24/2000 | | DONE |
|
|
|
|
Application received | | | 3/22/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 3/24/2000 | 3/24/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 3/22/2000 | | | | PEND |
Dan Overy
|
|
|
|
Plan Reviewer's activity | | | | | |
|
|
|
4/6/2000 yesterday dakota design faxed shear calcs from doug unger which do not match structure being constructed. today after conversation with jay jobe of dakota design, it was decided that building will need to be addressed by seperate engineering firm for lateral analysis and beam sizes which will be identified on plans. plans that are submitted indicate partial wall brace design out of boise city green book, two different sets of engineering and additional calcs which don't apply. also called nick (nemecs foreman) to let him know current status of project. plans were being looked at by engineer, as we spoke, according to him. will bring in new sets as soon as done.
|