To perform interior remodel and minor exterior remodel to an existing 9,214 sq.ft. restaurant per approved plans on file. Work to include remodel of dinning area, construction of one-hour fire rated interior partitions, remodel mens and womens restrooms by repairing or replace bath tile and fixtures and partitions, construct a 150 sq ft raised floor area, change light fixtures, paint exterior, and install new exterior ramp and sidewalk adjacent to accessible parking spaces. NOTE: This building is fully fire sprinklered. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. (P.C.#202-00)*RMH*
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes3/22/20003/22/200010/24/2000 DONE
additional value from ele
(F) Reprint permit  10/24/2000 DONE
Letter of compliance  8/21/2000 DONE
Letter of Compliance #18540 issued 8-21-00.
BLD-Final8/17/20008/18/20008/18/2000APASS
DetailsJim Sly
Ty ###-#### OK for perm occ. 8/18/2000 10:33:45 AM
FIRE-Final Inspection8/17/20008/17/20008/17/2000PPASS
DetailsJoe Tawney
Ty ###-#### Reinsp OK for Certificate of Completion 8/18/2000 7:46:01 AM
BLD-Final8/15/20008/17/20008/17/2000AFAIL
DetailsCarl Dependahl
###-#### nr 8/17/2000 8:49:41 AM
FIRE-Final Inspection8/15/20008/16/20008/16/2000ACANC
DetailsJoe Tawney
Scheduled by Inspector: 406 On 8/15/2000 Ty ###-####
FIRE-Final Inspection8/15/20008/16/20008/16/2000AFAIL
DetailsJoe Tawney
Scheduled by Inspector: 406 On 8/15/2000 fail c/n issued 8/16/2000 12:31:35 PM
FIRE-Final Inspection8/15/20008/16/20008/16/2000ACANC
DetailsJoe Tawney
###-####
FIRE-Final Inspection8/15/20008/15/20008/15/2000ACANC
DetailsJoe Tawney
Ty ###-####
BLD-Final8/15/20008/15/20008/15/2000AFAIL
DetailsCarl Dependahl
###-#### TY; complete work & obtain fire insp. recall 8/15/2000 10:14:55 AM
BLD-Framing/Rough-in7/27/20007/28/20007/28/2000APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 07/27/2000 at 10:35:11. Contact: ###-####.
BLD-Other7/26/20007/27/20007/27/2000ACANC
Details
Scheduled by a contractor via Hello! on 07/26/2000 at 07:49:26. Contact: ###-####. no answer contact # 7/27/2000 12:40:44 PM
Issue PAID IN FULL permit  7/24/2000 DONE
Print Occupancy Form  5/30/2000 DONE
Inspection Record Card- Bld  5/30/2000 DONE
Telephone call  5/30/2000 DONE
talked to steve hale to verify plans are ready
Case Summary (BLD)  5/26/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/26/2000 PASS
DetailsRon Hill
Plan assigned to (R_H)3/23/2000 5/26/2000 PASS
Details
5/26/2000 16:32:49 RMH - activity updated through activity BLDA022 from case BLD00-00748.
Plan Reviewer's activity  5/25/2000 PEND
DetailsRon Hill
Called and toalk with Keneth Hall who is now the architect for this project, prior architect was Mike Gallejo who is no longer with the firm. I discussed the item that was required before I could issue a permit for this project, he indicated that he would fax me the required testing information. rmh
Plan Reviewer's activity  5/15/2000 FAIL
DetailsRon Hill
I called and spoke with Dick Sun at 3:10 pm he indicated that he still did not have the information of the testing requirements for the smoke development flame spread of the columns. He said he would have the manufacture call me.
Telephone call  5/4/2000 FAIL
DetailsRon Hill
Spoke to architect and materials provider, Dick Sun & James Barrey, explained that more flame spread information was required for the proposed use of FRP withinn the restruant tenant space, and to provide with the testing and listing information.
Plan resubmittals received  5/2/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS C, A1, A2, A3, A6, A9. ONE COPY OF CUT SHEETS (FLAME SPREAD CHARACTERISTICS-INTERIOR FINISHES)
ONE RESPONSE TO CITY COMMENTS AND ONE COPY STAMPED STRUCTURAL DESIGN DOCUMENT (RARA)
ROUTED TO RON HILL. BILL A. RECEIVED THE SAME INFORMATION MINUS STAMPED STRUCTURAL DESIGN DOCUMENT (RARA). KMM
Telephone call  4/20/2000 FAIL
DetailsRon Hill
Spoke with the Engineer for project, Ahmad, went over requirements
Routing - FIRE4/6/20004/11/20004/11/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  4/11/2000 FAIL
DetailsBill Alexander
Routing - PLAN CHECK3/29/2000 4/6/2000 FAIL
DetailsRon Hill
Faxed and Mailed requirements to Architect. Route to fire department.
Plan Reviewer's activity  4/6/2000 FAIL
DetailsRon Hill
Routing - PLUMBING3/27/2000 3/29/2000 DONE
Routing - PLANNING3/23/2000 3/27/2000 PASS
Routing - PUBLIC WORKS3/27/2000 3/27/2000 PASS
Pending Assignment by MYS3/22/2000 3/23/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  3/23/2000 DONE
Route to PLANNING, PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  3/23/2000 PEND
Application received  3/22/2000  
Recd Pcfee & Taken To Pln CK     
Routing - PLAN CHECK4/12/2000   PEND