DOC - Permit Finaled | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 3/12/2001 2:57:55 PM
|
BLD-Final | 8/17/2000 | 8/18/2000 | 8/18/2000 | P | PASS |
Tom Arcoraci
|
|
|
Bill ###-#### LC ISSUED 8/21/2000 8:00:04 AM
|
BLD-Final | 8/16/2000 | 8/17/2000 | 8/17/2000 | P | FAIL |
Russ Owen
|
|
|
###-####
complete rear step and garage threshold. 8/18/2000 9:01:18 AM
|
BLD-Framing/Rough-in | 6/22/2000 | 6/22/2000 | 6/22/2000 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 6/20/2000 | 6/21/2000 | 6/21/2000 | P | PART |
Russ Owen
|
|
|
###-#### One correction 6/22/00 9:35:07 AM
|
BLD-Energy code compliance | 6/20/2000 | 6/21/2000 | 6/21/2000 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 6/16/2000 | 6/19/2000 | 6/19/2000 | P | FAIL |
Russ Owen
|
|
|
###-####\\ C/N posted 6/21/00 11:22:39 AM
|
BLD-Framing/Rough-in | 6/5/2000 | 6/5/2000 | 6/5/2000 | P | PASS |
Russ Owen
|
|
|
bill--- ###-#### shear panel insp
|
BLD-Framing/Rough-in | 6/5/2000 | 6/5/2000 | 6/5/2000 | A | PASS |
Russ Owen
|
|
|
Ok to side.
|
BLD-Framing/Rough-in | 6/2/2000 | 6/2/2000 | 6/2/2000 | P | FAIL |
Russ Owen
|
|
|
shear wall bill ###-#### (nailing). 6/5/00 10:47:01 AM
|
BLD-Footing | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | PASS |
Russ Owen
|
|
|
Jerad ###-#### Footing at interior will have another wall built beside it as over-excaved. 4/28/00 12:05:44 PM
|
Override - Parcel Holds | | | 4/26/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 4/24/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/24/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/21/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/21/2000 | | DONE |
|
|
|
talked to Amy gave dollar amount she will tell bruce
|
Plan assigned to (SAM) | 4/5/2000 | | 4/21/2000 | | PASS |
Steve Munroe
|
|
|
4/21/2000 07:34:44 SAM - activity updated through activity BLDA022 from case BLD00-00772.
|
Pending Assignment by DJO | 3/24/2000 | | 4/5/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 3/24/2000 | 3/24/2000 | 3/28/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 3/24/2000 | 3/24/2000 | 3/27/2000 | | DONE |
|
|
|
|
Application received | | | 3/24/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 3/28/2000 | 3/28/2000 | | | PEND |
|
|
|
|
Telephone call | | | | | PEND |
|
|
|
4/5/00 8:30 Called and talked to Bill with Brighton. I informed him that he needs to talk to the developer to resolve the floodplain requirements. I also asked him to have his truss company fax over a truss profile.
4/12/00 10:00 Called and talked to Bill and let him know I still havent recieved anything from Quadrant yet.
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
4/5/00 9:04 Plans review is done. I am waiting for fax from truss company and Jim Wyllie to release the lot.
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|