Permit Information
Permit NumberBLD00-00775
StatusFinaled
Name LYNN BROWN
Site Address 12274 W OVERLAND RD
Project NameCAR WASH FACILITY
Customer Number 
ePlanReviewNo
Description
BELVEAL CAR WASH FACILITY * TO CONSTRUCT A 3,313 SQUARE FOOT SINGLE STORY CMU BUILDING. PERMIT INCLUDES GRADING AND DRAINAGE AS APPROVED BY PUBLIC WORKS. DRH00-00035 PC#211-00
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/24/2011 DONE
Case Summary (BLD)  2/27/2008  
Permanent occupancy UNPAID FEE  1/10/2001 DONE
Perm. Occ. Cert. #8536 issued 1-10-01 to Rocky Mountain Car Wash.
BLD-Final1/9/20011/9/20011/9/2001PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/09/2001 at 08:35:30. Contact: ###-####.
Code Occupancy Approval  1/8/2001 PASS
Compliance met - DRH00-00035/Deviaion from plans - drainage issue at Overland frontage - large swale provided - sod layed.
BLD-Final11/24/200011/24/200011/24/2000PNR
DetailsCarl Dependahl
Added by Inspector: 340 On 11/24/2000 4:18:35 PM need code enf
BLD-Final11/22/200011/22/200011/22/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/22/2000 at 11:29:59. Contact: ###-####. ok for t/o, need p&z & mount extinguisher 11/22/2000 5:39:11 PM
FIRE-Final Inspection11/20/200011/21/200011/21/2000APASS
DetailsRick Jackson
###-####
BLD-Conference11/21/200011/21/200011/21/2000APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/21/2000 9:22:37 AM letter from arch ok for struct masonry
PubWorks Occupancy Approval11/21/200011/21/200011/21/2000 DONE
Signed Permanent Occupancy 11/21/00. D.Hagen
BLD-Framing/Rough-in10/24/200010/25/200010/25/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/24/2000 at 14:36:25. Contact: ###-####.roof ,dragstruts ok, rec'd arch's letter re beam deletion and masonry insps 10/25/2000 11:01:54 AM east 10/25/2000 11:02:00 AM 10/25/2000 11:02:58 AM
BLD-Framing/Rough-in10/19/200010/20/200010/20/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/19/2000 at 15:16:43. Contact: ###-####. keep c/n...also have original c/n asking for insps of masonry...need eng's letter for lack of insps of masonry 10/20/2000 11:56:07 AM
BLD-Framing/Rough-in10/18/200010/18/200010/18/2000PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/18/2000 at 09:59:09. Contact: ###-####. see cn 10/18/2000 5:07:04 PM
BLD-Framing/Rough-in10/16/200010/17/200010/17/2000AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/16/2000 at 13:05:54. Contact: ###-####. needs to resolve masonary inspections 10/17/2000 9:48:50 AM
BLD-Foundation7/19/20007/19/20007/19/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 07/19/2000 at 04:51:02. Contact: ###-####. Steel ok @ 7/20/00 1:59:05 PM
BLD-Footing7/17/20007/18/20007/18/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 07/17/2000 at 13:39:07. Contact: ###-####. Ftg's. ok (pend. suveyors report). 7/18/00 2:48:01 PM
BLD-Conference7/17/20007/17/20007/17/2000APASS
DetailsCarl Dependahl
W/Al. H. refound. Req's; need eng's letter (per previous C/N re: compaction.
BLD-Conference7/17/20007/17/20007/17/2000APASS
DetailsCarl Dependahl
w/alan H. ....need eng's reports prior to pour....keep C/N.
BLD-Footing7/17/20007/17/20007/17/2000AFAIL
DetailsAlan Hauser
Scheduled by a contractor via Hello! on 07/17/2000 at 04:50:23. Contact: ###-####. No one on site 7/18/00 2:05:33 PM
BLD-Footing7/14/20007/14/20007/14/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 07/14/2000 at 05:27:58. Contact: ###-####. C/N: soils report & "ok to pour" by engr. 7/18/00 1:31:46 PM
BLD-Footing7/13/20007/13/20007/13/2000PFAIL
DetailsCarl Dependahl
Dane, ###-#### Send compaction reports 7/14/00 9:28:04 AM
BLD-Conference7/5/20007/5/20007/5/2000PPART
Details
Scheduled by Inspector: 338 On 7/5/00 site visit to confirm soils problems concrete ctr called with concerns; site visit it appears that this area has for some time been used for a fill area and a soils expert should give blessing prior to pouring concrete 7/5/00 4:31:29 PM
(F) Reprint permit  6/23/2000 DONE
Routing Off Site - A.C.H.D6/22/20006/22/20006/22/2000 DONE
PAID 2137.00 00-10314
Issue PAID IN FULL permit  6/22/2000 DONE
Plan assigned to (MLO)3/27/20003/27/20006/21/2000 PASS
DetailsMike Otto
6/21/2000 13:54:48 MLO - activity updated through activity BLDA022 from case BLD00-00775.
Routing - PUBLIC WORKS6/14/2000 6/21/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/21/2000 DONE
Inspection Record Card- Bld  6/21/2000 DONE
Print Occupancy Form  6/21/2000 DONE
Telephone call  6/21/2000 DONE
called permit ready and fees due and need ACHD cert upon pick up left message
Routing - PUBLIC WORKS6/5/2000 6/13/2000 FAIL
Routing - PLUMBING6/13/2000 6/13/2000 PASS
Plan resubmittals received  6/13/2000 DONE
RECEIVED TWO COPIES OF REVISED C-1 SHEET. ROUTED TO MIKE O. KMM
Plan resubmittals received  6/5/2000 DONE
RECEIVED TWO COPIES OF REVISED PLUMBING SHEETS P1 AND P2. ROUTED TO MIKE O. KMM
Routing - PUBLIC WORKS5/30/2000 5/31/2000 FAIL
PLUMBING SHEETS MISSING, INTERIOR AND EXTERIOR TRENCH DRAINS GO TO WHERE? 1/6/00 DAR
Routing - PLUMBING5/24/2000 5/25/2000 FAIL
Routing - PUBLIC WORKS5/24/2000 5/24/2000 FAIL
OUTSIDE DRAIN TO SEWER MUST BE EITHER REMOVED OR COVERED PER WALT BAUMGARTNER. 5/25/00 DAR
Routing - PUBLIC WORKS5/23/2000 5/23/2000 FAIL
REQUIRES PLUMING PLANS PER BRIAN MURPHY. 5/23/00 DAR
Telephone call  5/23/2000 PEND
CONTACTED ARCHITECT ABOUT PROBLEMS WITH PUBLIC WORKS AND PLUMBING. MLO
Routing - PLUMBING5/17/2000 5/23/2000 FAIL
PLANS MUST BE REVIEWED BY P.W. BEFORE FURTHER CORRECTIONS CAN BE COMPLETED.
Plan resubmittals received  5/17/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM LYNN BROWN TWO SETS OF A-4 AND A-5, FORWARDED SAME TO MIKE OTTO. 5/17/00 DAR
Routing - PLAN CHECK5/17/2000 5/17/2000 PASS
Routing - PUBLIC WORKS4/24/2000 4/27/2000 FAIL
REVISED PLANS ARE BEING SUBMITTED AND WILL NEED TO BE REVIEWED PRIOR TO APPROVAL PER BRAIN MURPHY. MLO PLANS WILL NEED TO BE RE-ROUTED BACK TO P.W.
Routing - FIRE4/19/20004/21/20004/21/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  4/21/2000 FAIL
DetailsBill Alexander
PLANS RETURNED TO PLAN CHECK
Plan resubmittals requested  4/19/2000 FAIL
UBC CORRECTIONS
Routing - PLAN CHECK4/13/2000 4/19/2000 FAIL
CORRECTIONS MAILED AND FAXED TO ARCHITECT.
Plan resubmittals received  4/14/2000 PASS
RECEIVED ONE COPY OF REVISED SHEETS P1 AND P2. SPOKE WITH MUSGROVE ENG. ABOUT AN ADDITIONAL COPY. THEY WILL TRY TO HAVE IT HERE BY 11:00. ROUTED THE ONE COPY TO MIKE OTTO. KMM
RECEIVED ADDITIONAL COPY OF STAMPED AND SIGNED P1 AND P2 SHEETS. ROUTED TO MIKE OTTO. KMM
Routing - PLUMBING4/6/2000 4/13/2000 FAIL
Routing - PLANNING3/31/2000 4/6/2000 PASS
Information regarding vacuum islands must be submitted per DRH00-35, condition of approval #1g.

DAVE, ROUTE BACK TO PW WHEN PLANS ARE BACK FROM P&Z. THANKS, KMM
Routing - PUBLIC WORKS3/27/2000 3/30/2000 FAIL
EXTERIOR AND INTERIOR DRAINS GO WHERE ? NO PLUMBING PLANS .
Additional plans submitted  3/30/2000 DONE
RECEIVED THREE COPIES OF ELECT. SHEETS E-1, E-2 AND E-3 FROM LYNN BROWN. ROUTED TO MIKE O. KMM
Plans ACCEPTED BY PLAN TECH  3/27/2000 PEND
WILL BE SUBMITTING ELEC. , MECH. AND PLUMB. KMM
Plan routing begun/NEW & ADDTN  3/27/2000 DONE
Application received  3/24/2000  
Received Certificate of Value  3/24/2000 DONE