Case Summary (BLD) | | | 9/5/2002 | | |
|
|
|
|
DOC - Permit Expired | 1/24/2001 | 1/24/2001 | 1/24/2001 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 1/24/2001 3:07:16 PM
|
BLD-Framing/Rough-in | 9/21/2000 | 9/21/2000 | 9/21/2000 | P | PASS |
Russ Owen
|
|
|
###-####done by 301. 9/21/2000 1:37:00 PM
|
BLD-Framing/Rough-in | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | NH |
Jim Storey
|
|
|
no access 9/21/2000 12:13:20 PM
|
BLD-Framing/Rough-in | 6/20/2000 | 6/21/2000 | 6/21/2000 | A | PART |
|
|
|
###-#### ok to install siding on all but the west most garage wing wall where the holddown nailing must e verified. 6/21/00 10:11:07 PM
|
BLD-Foundation | 4/7/2000 | 4/10/2000 | 4/10/2000 | A | PART |
|
|
|
###-#### Willie Jones ok to pour only the ext footers center footing must be min of 5 square feet 04/10/2000
|
Plan assigned to (DJO) | 3/24/2000 | 3/24/2000 | 3/27/2000 | | PASS |
Dan Overy
|
|
|
3/27/2000 09:12:09 DJO - activity updated through activity BLDA022 from case BLD00-00777.
|
Plan Reviewer's activity | | | 3/27/2000 | | DONE |
|
|
|
received calculations from BMC West on floor joist carrying roof load between brg. points.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/27/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/27/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/24/2000 | | DONE |
|
|
|
CALLED BMC WEST ABOUT TJ EXPERT LAYOUT SHEET. NEED ADDITIONAL INFORMATION. TJ EXPERT PERSON WONT BE BACK UNTIL MONDAY THE 27TH.
|
Application received | | | 3/24/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/24/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | | | |
|
|
|
|