BLD-Footing | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Carl Dependahl
|
|
|
ft insp mark= ###-#### ok per plan 5/9/2001 4:47:53 PM
|
BLD-Final | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | FAIL |
Tony Young
|
|
|
###-#### call first
need trades done, guardrail to code, temp. windows 4/19/2001 12:28:34 PM
|
BLD-Energy code compliance | 9/20/2000 | 9/21/2000 | 9/21/2000 | P | PASS |
Tom Arcoraci
|
|
|
MARK-- ###-#### ENERGY CODE framing ok to cover 9/21/2000 4:25:04 PM
|
BLD-Framing/Rough-in | 9/19/2000 | 9/20/2000 | 9/20/2000 | A | PART |
Tony Young
|
|
|
Mark ###-####
c/n posted on inspection sheet,, truss repair, hanger, ok to insulate,, verify energy seal package and c/n
9/20/2000 11:54:05 AM
|
BLD-Final | 9/14/2000 | 9/15/2000 | 9/15/2000 | P | CANC |
|
|
|
FN-- MARK- SEILER-- ###-#### CELL by the contr other agencies not approved 9/15/2000 3:34:39 PM
|
BLD-Framing/Rough-in | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### dry wall; lid ok, add fireblox at furred lid. ok to continue. need elec r/i upstairs 8/31/2000 10:19:57 AM
|
BLD-Framing/Rough-in | 8/16/2000 | 8/16/2000 | 8/16/2000 | P | PART |
|
|
|
###-#### ok to insulate structure and to drywall lower section 8/17/2000 9:38:55 AM
|
BLD-Framing/Rough-in | 8/11/2000 | 8/11/2000 | 8/11/2000 | P | PART |
|
|
|
Mark ###-#### with rory and super on a prelim frame insp stair run too long, need draft stopping and should have draft stops in the attic. 8/14/2000 8:05:30 AM
|
BLD-Framing/Rough-in | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | PART |
Tony Young
|
|
|
###-#### Shear ok 7/28/00 1:23:27 PM
|
BLD-Framing/Rough-in | 7/21/2000 | 7/24/2000 | 7/24/2000 | A | FAIL |
Tony Young
|
|
|
###-#### mark C/N not done all the way/conference with builder. 7/24/00 1:27:18 PM
|
BLD-Framing/Rough-in | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | FAIL |
Tony Young
|
|
|
###-#### c/N left 7/21/00 9:11:31 AM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/11/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/11/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 3/24/2000 | | 5/11/2000 | | PASS |
Steve Munroe
|
|
|
5/11/2000 14:30:57 SAM - activity updated through activity BLDA022 from case BLD00-00794.
|
BLD-Foundation | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | PART |
|
|
|
###-#### r-bar not placed holddowns not in place pump truck sitting there concrete truck here 2nd truck on the way per memo gt to trust em' 5/8/00 2:51:01 PM
|
BLD-Footing | 5/4/2000 | 5/5/2000 | 5/5/2000 | P | PART |
Jim Storey
|
|
|
###-#### rebar appears to be ok early start permit set back appear to be ok 5/5/00 2:18:42 PM
|
Application received | | | 3/24/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/24/2000 | | |
|
|
|
|
Plan resubmittals received | | | 3/3/2000 | | PEND |
|
|
|
|
Telephone call | | | | | PEND |
|
|
|
4/19/00 16:41 Called and talked with Rober Erstad with Erstad Thornton Architects, and informed them that I am still waiting for the record of servey for the lot.
|
Early Start Permit | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
Need more information on plans. Need a foundation plan, all hold-downs shown on foundation plan and over height wall engineering. Framing plans needs to be addressed for bearing points from above. Sending plans back to architect to fix. 03/27/00
|
Telephone call | | | | | PEND |
|
|
|
Called and left a message for Rob Thorton to call me. I have issues to discuss on this plan.
|