Code Occupancy Approval | | | 5/9/2001 | | FAIL |
|
|
|
Inspected for final - still to finish landscape area at the McMillan Frontage and add one more handicapped space.
|
Code Occupancy Approval | | | 5/8/2001 | | FAIL |
|
|
|
Still need to finish some landscaping at the front of propery at drainage area - need one more H/C parking space. Orginal plans required 2 - two later modifications showed 4 - the actual number required by code is 3 - so told them to put in one more.
|
Fee Review-notes | 3/30/2000 | 3/30/2000 | 4/11/2001 | | DONE |
|
|
|
|
DOC - Permit Finaled | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 2/9/2001 2:34:19 PM
|
BLD-Final | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/27/2000 at 11:31:33. Contact: ###-####.
|
FIRE-Final Inspection | 12/27/2000 | 12/27/2000 | 12/27/2000 | P | PASS |
Joe Tawney
|
|
|
###-####. Reinsp OK for permanant occupancy 12/29/2000 2:27:49 PM
|
BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 07:57:06. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/22/2000 at 05:56:13.
|
FIRE-Final Inspection | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | FAIL |
Joe Tawney
|
|
|
###-####.Reinsp Fail Curb lettering 12/29/2000 2:10:00 PM
|
FIRE-Final Inspection | 12/8/2000 | 12/8/2000 | 12/8/2000 | P | PART |
Joe Tawney
|
|
|
###-####. 12/8/2000 1:35:49 PM Reinsp OK for temporary occupancy. Curb striping 12/11/2000 8:05:25 AM
|
BLD-Final | 12/8/2000 | 12/8/2000 | 12/8/2000 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/08/2000 at 08:37:11. Contact: ###-####. sighed off for temp occ. 12/8/2000 3:21:45 PM
|
FIRE-Final Inspection | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | FAIL |
Joe Tawney
|
|
|
fire fn per david hannah Final Fail C/N issued 12/7/2000 4:49:46 PM
|
BLD-Other | 12/5/2000 | 12/6/2000 | 12/6/2000 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 11:34:05. Contact: ###-####.
|
BLD-Final | 12/1/2000 | 12/1/2000 | 12/1/2000 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/01/2000 at 08:33:49. Contact: ###-####.NEEDS FINAL INSPECTION 12/1/2000 3:37:07 PM
|
Code Occupancy Approval | | | 11/28/2000 | | FAIL |
|
|
|
Need to Bond $3,025 for remaining plants, sod and bark to meet compliance with CUP00-00015/00077.
Bond posted on 11/29/00 - Temporary signed.
|
Code Occupancy Approval | | | 11/20/2000 | | FAIL |
|
|
|
Inspection - Will need to Bond for temporary as part of this will not be able to be completed until thaw (spring). Still need bark in planters, small amount of sod, plants up at the structure and along McMillan frontage, trash enclosure. Told Kay Guthmiller to contact me when ready to bond (they will be posting cashier's check)...try to get as much done as possible then bond. She will call Monday or Tuesday next week - want occupancy by 12/01/00.
|
BLD-Framing/Rough-in | 10/27/2000 | 10/27/2000 | 10/27/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/27/2000 at 06:11:54. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/23/2000 | 10/24/2000 | 10/24/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 14:09:35. Contact: ###-####. wip needs a few 10/24/2000 10:23:24 AM light boxes need boxed in 10/24/2000 10:23:54 AM
|
BLD-Framing/Rough-in | 10/18/2000 | 10/19/2000 | 10/19/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/18/2000 at 17:48:01. Contact: ###-####. wip 10/19/2000 9:47:50 AM
|
BLD-Framing/Rough-in | 10/13/2000 | 10/16/2000 | 10/16/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 09:59:44. Contact: ###-####. wip 1 hr 10/17/2000 8:38:32 AM
|
BLD-Framing/Rough-in | 10/12/2000 | 10/13/2000 | 10/13/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/12/2000 at 16:14:44. Contact: ###-####. Dbl top plate (blocks), fireblocks, some light gyp boxes, OK. 10/13/2000 9:48:52 AM
|
BLD-Conference | 10/11/2000 | 10/11/2000 | 10/11/2000 | A | PART |
Tom Arcoraci
|
|
|
Sheetrock to be continueos at ceiling in duct chases', all partion walls need additional blocking at top plate.
|
BLD-Framing/Rough-in | 10/9/2000 | 10/10/2000 | 10/10/2000 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/09/2000 at 14:14:30. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/10/2000 at 07:29:45.
|
BLD-Framing/Rough-in | 10/5/2000 | 10/6/2000 | 10/6/2000 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/05/2000 at 11:13:26. Contact: ###-####. arch to make field insp 10/6/2000 10:10:36 AM
|
BLD-Framing/Rough-in | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/11/2000 at 09:39:57. Contact: ###-####. Need all trade R/I insp and approvals prior to calling for OK to cover. 9/12/2000 9:39:31 AM
|
BLD-Framing/Rough-in | 9/7/2000 | 9/8/2000 | 9/8/2000 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 12:00:48. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/08/2000 at 07:54:40.
|
BLD-Framing/Rough-in | 8/21/2000 | 8/22/2000 | 8/22/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 10:24:17. Contact: ###-####. roof nailing ok 8/23/2000 8:15:17 AM
|
BLD-Foundation | 6/23/2000 | 6/23/2000 | 6/23/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 08:19:39. Contact: ###-####.
|
BLD-Foundation | 6/21/2000 | 6/22/2000 | 6/22/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 13:03:35. Contact: ###-####. all but drive thru area 6/23/00 11:22:38 AM
|
BLD-Footing | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 08:14:04. Contact: ###-####. Need new detail for step down 6/21/00 11:44:25 AM
|
BLD-Foundation | 6/16/2000 | 6/20/2000 | 6/19/2000 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/16/2000 at 10:43:58. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/19/2000 at 08:12:03.
|
BLD-Footing | 6/16/2000 | 6/19/2000 | 6/19/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/16/2000 at 10:42:50. Contact: ###-####. Not ready 6/21/00 11:18:58 AM
|
Plan resubmittals received | | | 6/9/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED P1.1 SHEET ROUTED ONE COPY TO TOM AND ONE TO RECORDS. KMM
|
(F) Reprint permit | | | 6/6/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/5/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/5/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/5/2000 | | DONE |
|
|
|
george ###-####
|
Issue PAID IN FULL permit | | | 6/5/2000 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 3/30/2000 | | 6/2/2000 | | DONE |
Mike Otto
|
|
|
|
Routing - PLUMBING | 6/1/2000 | | 6/2/2000 | | PASS |
|
|
|
interior waste to drain north to match sewer service, size thermol expantion per manufactures sizing instructions
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2000 | | DONE |
|
|
|
|
Routing - FIRE | 5/26/2000 | 5/26/2000 | 6/1/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing Off Site - STRUCTURAL | 5/24/2000 | | 5/31/2000 | | PASS |
|
|
|
SENT CACULATIONS TO HOWIE HENRIKSON VIA FAX AND SNAIL MAIL. 5/24/00 DAR
|
Plan resubmittals received | | | 5/26/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM OLSEN AND ASSOCIATES, TWO SHEETS OF A8.4, FORWARDED SAME TO MIKE OTTO. 5/26/00 DAR
|
Routing - PLAN CHECK | 5/26/2000 | | 5/26/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/19/2000 | | 5/23/2000 | | FAIL |
|
|
|
ARCHITECT CONTACTED BY PHONE. MLO
|
Plan resubmittals requested | | | 5/23/2000 | | FAIL |
|
|
|
UBC CORRECTIONS
|
Plan resubmittals received | | | 5/19/2000 | | PASS |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A1.1,A1.2, A2.1, A3.1, A5.1, A5.2, A7.2, A8.0, A8.2, A8.3, A8.4, E1.0. TWO COPIES OF STRUCTURAL PLAN REVIEW COMMENT RESPONSES. ONE COPY OF RESPONSE LETTER. ROUTED TO MIKE OTTO. KMM
|
Plan Review Completed(1st rev) | | | 5/4/2000 | | FAIL |
Sam Rogers
|
|
|
plans returned to plan check
|
Plan resubmittals requested | | | 5/4/2000 | | FAIL |
|
|
|
STRUCTURAL CORRECTIONS.
|
Routing - FIRE | 4/27/2000 | 5/3/2000 | 5/3/2000 | | FAIL |
Sam Rogers
|
|
|
Hydrant flow and FD access issues
|
Routing Off Site - STRUCTURAL | 3/30/2000 | | 5/3/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Routing - PLAN CHECK | 4/18/2000 | | 4/27/2000 | | FAIL |
|
|
|
CORRECTIONS MAILED AND FAXED TO ARCHITECT. MLO
|
Plan resubmittals requested | | | 4/27/2000 | | FAIL |
|
|
|
UBC CORRECTIONS.
|
Routing - PUBLIC WORKS | 4/17/2000 | | 4/18/2000 | | DONE |
|
|
|
|
Routing - PLUMBING | 4/12/2000 | | 4/14/2000 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 4/11/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM LOVELESS ENGINEERING TWO OF SHEET C-1 FORWARDED SAME TO MIKE OTTO. 4/11/00 DAR
|
Routing - PLANNING | 4/4/2000 | | 4/11/2000 | | PASS |
|
|
|
Approved per conditions of CUP00-15
|
Routing - PUBLIC WORKS | 3/30/2000 | | 4/4/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY.. REQUIRES SEWER PLAN AND CIVIL PLAN PER JOHN JOHNSON.. 4/4/00 DAR
|
Application received | | | 3/30/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/30/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 3/30/2000 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/30/2000 | | DONE |
|
|
|
|
Pending Assignment by MYS | 3/30/2000 | | | | |
Marlene Southard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|