Fee Review-notes | 4/5/2000 | 4/5/2000 | 6/27/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/15/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8718 issued 6-14-01 to TMC, Inc.
|
Permanent Occupancy | | 6/14/2001 | 6/14/2001 | | DONE |
|
|
|
|
BLD-Final | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | PASS |
Jim Storey
|
|
|
fn rolaine ###-#### pending fire insp also final ok for c/o card on site, 6/14/2001 9:25:02 AM
|
FIRE-Final Inspection | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | PASS |
Rick Jackson
|
|
|
fire fn rolaine ###-#### pending fn occ insp
|
FIRE-Final Inspection | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### with jim Storey to identify corrections again to owner; to be ready by 6/5/01 per owner 5/31/2001 3:22:46 PM
|
BLD-Final | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | FAIL |
Jim Storey
|
|
|
###-#### fire stopping and smoke seals as well as gaurd raillinsgs and handrail extetions. work to be completed wk form today. 5/31/2001 3:26:51 PM
|
FIRE-Final Inspection | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 9/27/2000 met with Jim Storey and architect; exit door hardware; penetrations; 9/28/2000 4:10:02 PM
|
FIRE-Final Inspection | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | FAIL |
Rick Jackson
|
|
|
Susan ###-#### no plans 9/27/2000 4:10:25 PM
|
Code Occupancy Approval | | | 9/22/2000 | | FAIL |
|
|
|
Need to permanently anchor bike rack. All else is o.k. (DRH00-00023). CAM
|
BLD-Final | 9/21/2000 | 9/22/2000 | 9/21/2000 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 12:13:04. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/21/2000 at 12:18:58.
|
BLD-Final | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | NR |
Tony Young
|
|
|
###-#### tim
will call for new inspection 8/14/2000 11:15:26 AM
|
FIRE-Final Inspection | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | FAIL |
Rick Jackson
|
|
|
###-#### tim fail - no plans; address; exit signs; rated doors with seals; extinguishers; emergency lights; 8/14/2000 1:08:59 PM
|
Print Occupancy Form | | | 8/14/2000 | | DONE |
|
|
|
|
BLD-Final | 8/10/2000 | 8/11/2000 | 8/11/2000 | P | CANC |
|
|
|
TIM--CELL ###-#### FN ctr wants to wait for 301 8/14/2000 8:03:23 AM
|
FIRE-Final Inspection | 8/10/2000 | 8/11/2000 | 8/11/2000 | P | NR |
Rick Jackson
|
|
|
TIM CELL ###-#### FN FIRE contractor will reschedule 8/14/2000 8:07:23 AM
|
BLD-Wall cover | 7/5/2000 | 7/6/2000 | 7/6/2000 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/05/2000 at 16:52:31. Contact: ###-####.
|
BLD-Wall cover | 7/5/2000 | 7/7/2000 | 7/5/2000 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/05/2000 at 16:29:51. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/05/2000 at 16:49:10.
|
BLD-Framing/Rough-in | 6/22/2000 | 6/23/2000 | 6/23/2000 | P | PART |
Jim Storey
|
|
|
John ###-#### John ###-####need plans on site fire stopping isues in basement. 6/23/00 3:42:16 PM
|
BLD-Framing/Rough-in | 6/12/2000 | 6/13/2000 | 6/13/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/12/2000 at 17:23:19. Contact: ###-####.
|
BLD-Footing | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | PART |
Jim Storey
|
|
|
###-#### covered w/special insp.pending report. 5/16/00 9:15:55 AM
|
Override - Parcel Holds | | | 5/15/2000 | | |
|
|
|
|
BLD-Footing | 5/5/2000 | 5/8/2000 | 5/8/2000 | A | PASS |
Jim Storey
|
|
|
Tim McGourty ###-#### pendig report rebar ok 5/8/00 9:24:50 AM
|
(F) Reprint permit | | | 5/8/2000 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 4/6/2000 | 4/6/2000 | 5/5/2000 | | PASS |
John Menard
|
|
|
5/5/00 09:04:03 JCM - activity updated through activity BLDA022 from case BLD00-00884.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2000 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 5/5/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/5/2000 | | DONE |
|
|
|
|
Telephone call | | | 5/5/2000 | | DONE |
|
|
|
called Timothy McGourty at ###-#### from TMC
|
Override - Parcel Holds | | | 5/5/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/5/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/5/2000 | | |
|
|
|
|
Routing - PLUMBING | 4/26/2000 | | 5/3/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/3/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS GRD, DTL, A1.1, A2.0, A2.1, A2.2, A2.4, A4.0, A5.0, A6.0, A6.1, A7.0, A8.0, A8.1, S1, S2, S3, S4, S5, S6, S7, M1.0, M2.0, M3.0, E1.0, E2.0, E2.1, E2.2, E3.0. TWO COPIES OF RESPONSE LETTER. ROUTED TO JOHN M. KMM
|
Routing - FIRE | 4/24/2000 | 4/26/2000 | 4/26/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 4/26/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals requested | | | 4/24/2000 | | PEND |
|
|
|
MAILED SCOTT WENDELL A COPY OF THE PLAN REVIEW COMMENT LIST, AS WELL AS, A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS.
|
Plan resubmittals received | | | 4/21/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEET GRD, TWO LETTERS FROM UNITED WATER. ROUTED TO JOHN M. KMM
|
Routing Off Site - STRUCTURAL | 4/6/2000 | | 4/21/2000 | | PASS |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM CONSULTING ENGINEER REQUESTED REVISION, BUT ARE THE NATURE THAT THEY CAN BE REVIEWED BY THE PLAN REVIEWER. JCM
|
Routing - PLANNING | 4/10/2000 | | 4/17/2000 | | DONE |
|
|
|
DAVE DO NOT SEND TO PLUMBING UNTIL PLUMB. AND MECH PLANS ARE RECEIVED. THANKS. KMM
approved per DRH00-23 and as noted on plans (also see April 7, 2000 letter in D.R. file).
|
Telephone call | | | 4/14/2000 | | DONE |
|
|
|
CONTACTED SCOTT WENDEL REGARDING PLUMB. AND MECH. PLANS. SCOTT STATED THE OWNERS ARE WORKING ON THEM. KMM
|
Routing - PUBLIC WORKS | 4/7/2000 | | 4/10/2000 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/7/2000 | | |
|
|
|
WILL ROUTE TO PW ON 4-7-00. APPLICANT IS TO BRING IN MECH. PLUMB PLANS. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 4/6/2000 | | PEND |
|
|
|
REQUIRES STAMPED AND SIGNED MECH. AND PLUMB. PLANS. CONTACTED SCOTT WENDELL, AS WELL AS ROLAINE OF TMC. KMM
|
Application received | | | 4/5/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/5/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/17/2000 | | | | |
|
|
|
|
Routing - PLAN CHECK | 5/3/2000 | | | | PEND |
|
|
|
|