Permit Information
Permit NumberBLD00-00923
StatusFinaled
Name DAN WOOLSTON
Site Address 244 N AL FRESCO PL
Project NameHILLSIDE
Customer Number398-7347
ePlanReviewNo
Description
To construct a 5340 sq. ft. two story single family dwelling with a 973 sq. ft. attached three car garage, a 260 sq. ft. covered entry porch and a 316 sq. ft. concrete patio per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 3675 sq. ft.)(2nd floor 1665 sq. ft.) This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system is to be installed. PC #340 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/19/200110/22/200110/22/2001APASS
DetailsTony Young
###-#### SCOTT STRATA SENT A LETTER TERRY RECORDS.
BLD-Grading Inspection10/22/200110/22/200110/22/2001 PASS
DetailsRita DeYoung
Final grading and drainage isa approved.
DOC - Permit Finaled10/22/200110/22/200110/22/2001PPASS
DetailsTony Young
Finaled by inspector at 10/22/2001 11:50:56 AM
BLD-Final10/11/200110/12/200110/12/2001PNR
DetailsRuss Owen
###-####. No inspection can be done untill Hillside requirements have been satisfied,left c/n to contact Terry Records. NO INSPECTION DONE THIS DAY. NOT READY. 10/12/2001 2:11:36 PM
Ready Permit EXTENDED  10/11/2001 DONE
extend permit per tony young/work still in progress per builder/mls
Reopen Permit (ISS)  10/11/2001 DONE
per tony young-work still in progress/mls
BLD-Framing/Rough-in8/23/20008/24/20008/24/2000APART
DetailsTony Young
###-#### late pm
still need energy report 8/24/2000 4:42:23 PM
BLD-Framing/Rough-in8/14/20008/15/20008/15/2000APART
Details
Scheduled by a contractor via Hello! on 08/14/2000 at 14:59:26. Contact: . made ok to insulate only, met with 325 and 415 on project with ctr rep, john the framer and Keith Jones, the eng of record. questions were raised about the hold down straps nailed and hidden under the sheathing without inspection of same, also waiting for resonnse from the truss eng on the use of 21/2 " nails vs 3" nails called out on the eng specifically. 8/15/00 11:00:33 AM
BLD-Framing/Rough-in8/15/20008/15/20008/15/2000APART
DetailsTony Young
Scheduled by Inspector: 415 On 8/15/2000
ok to insulate, waiting for shear wall engineering fix from Keith ,,, do not side. 8/15/2000 10:19:15 AM
BLD-Framing/Rough-in8/11/20008/14/20008/14/2000AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 08/11/2000 at 13:37:22. Contact: .
C/N left to have engineer verify all engineering and to recall frame inspection when engineer will be on site to go over other matters 8/14/2000 12:34:01 PM
BLD-Framing/Rough-in6/13/20006/13/20006/13/2000PPASS
DetailsRuss Owen
wall insp Rick ###-#### Garage walls ok 6/14/00 8:50:01 AM
BLD-Foundation6/8/20006/8/20006/8/2000PPASS
DetailsRuss Owen
rick ###-#### foundation wall Garage walls left 6/13/00 10:07:42 AM
BLD-Footing5/31/20006/1/20006/1/2000PFAIL
DetailsRuss Owen
rick ###-#### Not ready, ok by Terry Records for soils recall footing insp. 6/5/00 10:20:30 AM
Issue PAID IN FULL permit  5/18/2000 DONE
Plan assigned to (DJO)5/11/20005/11/20005/16/2000 PASS
DetailsDan Overy
5/16/2000 09:26:47 AJC - activity updated through activity BLDA022 from case BLD00-00923.
Plan assigned to (DJO)5/10/20005/10/20005/16/2000 PASS
DetailsDan Overy
5/16/2000 09:26:47 AJC - activity updated through activity BLDA022 from case BLD00-00923.
PLANS/APPL TAKEN TO FRONT DESK  5/16/2000 DONE
as per Dan Overy he forgot to put this action in so I am for him....
Inspection Record Card- Bld  5/16/2000 DONE
Telephone call  5/16/2000 DONE
called ###-#### Woolston Const permit ready for pickup
Print Pending Permit.LaserJet4  5/11/2000 DONE
Plan Review Report  5/11/2000 DONE
Plans ACCEPTED BY PLAN CHECK  5/11/2000  
Plans ACCEPTED BY PLAN CHECK  5/10/2000  
Routing - PLANNING4/19/20004/19/20004/19/2000 DONE
Routing - PUBLIC WORKS4/7/20004/7/20004/18/2000 DONE
Routing - PUBLIC WORKS GRADING4/7/20004/7/20004/18/2000 PASS
DetailsRita DeYoung
took to terry records 4/7/00. Approved as Category 3. Comply with requirements of soils report by Strata Geotechnical Engineers and conditions of approval contained in letter from Public Works attached to the plans.
Application received  4/7/2000  
Routing - PLAN CHECK4/19/20004/19/2000  PEND
Plan Reviewer's activity     
have called designer and engineer about lack of engineered foundation plans. being taken care of. 5-10-2000
Pending Assignment by DJO4/7/2000   PEND
DetailsDan Overy
Plan Reviewer's activity     
engineered foundation plans, along with sections, calculations, holdown locations by licensed Idaho engineer req.