Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00936
StatusFinaled
Name CORNERSTONE COUNSELING
Site Address 1329 S BRADY LN
Project Name 
Customer Number 
ePlanReviewNo
Description
(CORNERSTONE COUNSELING - BOB LAWTON) This building is not fire sprinklered. To convert the first floor of a 768 square foot dwelling into a counseling office. Work is to include selective demolition, a restroom accessible to the disabled, interior non-bearing walls, and an exterior ramp accessible to the disabled all per approved drawings and plan review conditions on file. The existing fireplace is NOT approved to be used as a fireplace. The basement is NOT approved for occupancy. Storage is not allowed in the basement. It shall be used exclusively for the service of the building (i.e. furnace and water heater only). All other furniture and equipment shall be removed. A durable sign shall be posted at the access to the basement stating: "BY ORDER OF THE BUILDING OFFICIAL, THIS BASEMENT SHALL NOT BE USED FOR STORAGE OR OTHERWISE OCCUPIED". PC-244-00, CZC99-00171, CUP99-00148, CVA99-00031 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes4/10/20004/10/20001/28/2004 DONE
BLD-Final4/9/20024/10/20024/10/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/09/2002 at 12:39:15. Contact: ###-####. pending plm/ hand rail to basement needs returns. 4/10/2002 2:15:21 PM
PubWorks Occupancy Approval4/2/20024/2/20024/3/2002 DONE
Project complete, no occupancy card to sign, 04/03/02. M.Strasser
FIRE-Final Inspection3/6/20023/6/20023/6/2002PPASS
DetailsRick Jackson
###-#### STEVE will have key lock on front door for structural, has thumb turn now 3/6/2002 1:26:20 PM
Code Occupancy Approval3/6/20023/6/20023/6/2002PFAIL
DetailsWm. Michael Meloy
Scheduled by Inspector: WMM On 3/6/2002 1:13:28 PM Inspection noted that the landscaping had been removed and not replaced, therefore, it had not been maintained in a healthy manner. 3/6/2002 2:42:44 PM
BLD-Framing/Rough-in2/20/20012/22/20012/22/2001AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/20/2001 at 12:33:11. Contact: ###-####. needs mech insp left cn to fire stop supply lines at ceiling 2/22/2001 11:18:49 AM
BLD-Concrete8/17/20008/18/20008/18/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/17/2000 at 13:22:03. Contact: ###-####. rebar ok on ramp. 8/18/2000 2:33:44 PM
BLD-Footing8/1/20008/2/20008/2/2000APASS
DetailsJim Storey
STEVE BARRY-- ###-#### FT --FOR HANDICAP
Telephone call  5/12/2000 DONE
left mess for clint green that permit is ready
Issue PAID IN FULL permit  5/12/2000 DONE
Routing - PUBLIC WORKS5/9/2000 5/11/2000 DONE
Routing - PLAN CHECK5/11/2000 5/11/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/11/2000 PASS
Inspector's copy Bld permit  5/11/2000 DONE
Print Occupancy Form  5/11/2000 DONE
Inspection Record Card- Bld  5/11/2000 DONE
Plan assigned to (CJW)4/21/2000 5/11/2000 PASS
DetailsCarl Westfall
5/11/00 13:09:48 CJW - activity updated through activity BLDA022 from case BLD00-00936.
Routing - PLAN CHECK5/9/2000 5/9/2000  
Routing - PLANNING5/5/2000 5/8/2000 DONE
approved, pending Tom Curren's review. OK, Tom Curren, 5/09/00. Applicant must build 5-6' high sight-obscuring fence on south property line.
Routing - PLAN CHECK4/28/2000 5/5/2000  
Plan resubmittals received  5/4/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM LKV ARCHITECTS TWO SETS OF SHEETS A-1-0 AND A-2.0, FORWARDED SAME TO CARL WESTFALL. 5/4/00 DAR
Plan Reviewer's activity  5/4/2000 PASS
Drawings approved, with conditions, after resubmittal review. See conditions list.
Routing - FIRE4/26/20004/28/20004/28/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  4/28/2000  
DetailsBill Alexander
Routing - PLAN CHECK4/21/2000 4/26/2000  
Plan Reviewer's activity  4/25/2000  
UBC plan review started April 25, 2000 and finished the next day. A response is required from the architect. See the conditions list.
Application received  4/21/2000 DONE
Routing - PLUMBING4/20/2000 4/21/2000 DONE
Routing - PLANNING4/12/2000 4/20/2000 DONE
DetailsTom Curren
approved.
Routing - PUBLIC WORKS4/11/2000 4/12/2000 FAIL
REQUIRES DRAINAGE PLAN. PER BRIAN MURPHY KMM
Pending Assignment by MYS4/10/2000    
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK