BLD-Final | 7/11/2000 | 7/11/2000 | 7/11/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ED L/C issued. 7/11/00 4:39:06 PM
|
BLD-Final | 7/7/2000 | 7/7/2000 | 7/7/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/07/2000 at 10:57:56. Contact: ###-####. C/N posted 7/10/00 10:21:21 AM
|
BLD-Framing/Rough-in | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### computers were down
|
BLD-Conference | 5/10/2000 | 5/10/2000 | 5/10/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### Conf. on roof material ok ice shield under comp. 5/11/00 11:42:00 AM
|
BLD-Framing/Rough-in | 5/5/2000 | 5/5/2000 | 5/5/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### Reinsp. ok- has low (1:12) slope roof, advised to check w/manuf. or use membrane 5/9/00 11:26:02 AM
|
BLD-Framing/Rough-in | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | CANC |
|
|
|
###-#### mark done by 316 5/4/00 7:12:07 PM
|
BLD-Framing/Rough-in | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | FAIL |
Jim Sly
|
|
|
C/N straps, max 44" on egress windows, verify shear insp.
|
BLD-Framing/Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 | A | PASS |
Carl Dependahl
|
|
|
mark ###-#### stem wall
|
BLD-Footing | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | PASS |
Alan Hauser
|
|
|
Mark Bailey ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/13/2000 | | DONE |
|
|
|
|
Application received | | | 4/13/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/13/2000 | | |
|
|
|
|
Plan assigned to (SAM) | 4/13/2000 | | 4/13/2000 | | PASS |
Steve Munroe
|
|
|
4/13/2000 15:31:15 SAM - activity updated through activity BLDA022 from case BLD00-00988.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|