BLD-Final | 1/18/2001 | 1/18/2001 | 1/18/2001 | P | PASS |
Dave Hannah
|
|
|
Darin ###-#### 1/18/2001 1:30:07 PM
|
DOC - Permit Finaled | 1/18/2001 | 1/18/2001 | 1/18/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/18/2001 1:38:54 PM
|
BLD-Final | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | FAIL |
Russ Owen
|
|
|
###-####c/n posted. 1/17/2001 2:36:36 PM
|
BLD-Framing/Rough-in | 10/2/2000 | 10/3/2000 | 10/3/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### will need verify add'l plan ck comments 10/3/2000 5:22:59 PM
|
BLD-Framing/Rough-in | 9/25/2000 | 9/25/2000 | 9/25/2000 | P | FAIL |
Tom Arcoraci
|
|
|
fr darrin ###-#### new cn issued one item left to correct on old cn 9/26/2000 8:12:08 AM
|
BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 | A | CANC |
Tony Young
|
|
|
Darin ###-####
# 407 did 9/11/2000 3:01:26 PM
|
BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 | A | FAIL |
Russ Owen
|
|
|
Added by Inspector: 407 On 9/11/2000 Left C/N posted.
|
BLD-Framing/Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PART |
Tom Arcoraci
|
|
|
SHEAR WALL --DARRIN ###-#### ok to side 8/14/2000 1:13:09 PM
|
BLD-Framing/Rough-in | 8/10/2000 | 8/10/2000 | 8/10/2000 | P | CANC |
Tom Arcoraci
|
|
|
shear \\ ###-####
|
BLD-Framing/Rough-in | 7/31/2000 | 7/31/2000 | 7/31/2000 | P | FAIL |
Russ Owen
|
|
|
siding\\###-####
|
BLD-Conference | 6/20/2000 | 6/20/2000 | 6/20/2000 | P | PASS |
Carl Dependahl
|
|
|
W/Bldr.-owner; Need beam design or alt. @ 2nd fl. verbal C/N.
|
Plan Reviewer's activity | | | 6/20/2000 | | PASS |
Carl Dependahl
|
|
|
w/bldr-owner: need beam design or alt. @ 22nd fl verbal c/n
|
BLD-Footing | 5/8/2000 | 5/9/2000 | 5/9/2000 | A | PART |
Carl Dependahl
|
|
|
tim --###-#### ft Ftg.; steel ok @ gar front. 5/11/00 10:55:25 AM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/28/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/28/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/28/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 4/27/2000 | | 4/28/2000 | | PASS |
Steve Munroe
|
|
|
4/28/2000 13:06:59 SAM - activity updated through activity BLDA022 from case BLD00-00990.
|
Pending Assignment by DJO | 4/13/2000 | | 4/27/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 4/13/2000 | 4/13/2000 | 4/14/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 4/13/2000 | 4/13/2000 | 4/14/2000 | | DONE |
|
|
|
|
Application received | | | 4/13/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 4/14/2000 | 4/14/2000 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
4/27/00 11:22 I called and left a message for Mark Waldorf to call me regarding this plan. I have question on the ceiling ties, rafter spans and roof construction.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | DONE |
|
|
|
9/29/00 Builder brought in plans wanting to add a bathroom and a closet above the garage in the bonus room. He also wanted a open stairway. I approved the bathroom and closet in the bonus room. We added a fire door to separate the garage from the stair landing creating a "mud room". Fire door between the utility and "mud room" can now be removed.
|