DOC - Permit Finaled | 2/6/2001 | 2/6/2001 | 2/6/2001 | A | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 2/6/2001 11:40:00 AM
|
BLD-Final | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PASS |
Tom Arcoraci
|
|
|
JAY -###-#### FN OCC
|
BLD-Energy code compliance | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Energy code compliance | 7/21/2000 | 7/21/2000 | 7/21/2000 | A | PART |
Russ Owen
|
|
|
Meet with insullation contractor had him repair some missed areas. Note: requires 2 attic access.
|
BLD-Conference | 7/21/2000 | 7/21/2000 | 7/21/2000 | P | PART |
Russ Owen
|
|
|
Posted C/N to drop a soffit to catch blow-in insulation at upper chase (right side of south kitchen wall, notified sheetrocker, owner, builder, insulator said he could take off from above if needed, also need (1) lower attic access and (1) upper attic access.
|
BLD-Framing/Rough-in | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | PASS |
Russ Owen
|
|
|
Jay ###-####
|
BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | PART |
Russ Owen
|
|
|
Jay ###-#### Truss company needs to ok 3 ply. girder center location. 7/18/00 2:12:58 PM
|
BLD-Energy code compliance | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | PASS |
Russ Owen
|
|
|
Jay ###-####
|
BLD-Framing/Rough-in | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | FAIL |
Russ Owen
|
|
|
jay ###-#### fr or ###-#### for darrin C/N posted 7/13/00 11:37:24 AM
|
BLD-Framing/Rough-in | 7/5/2000 | 7/5/2000 | 7/5/2000 | P | PASS |
Russ Owen
|
|
|
shear wall Jay ###-####
|
BLD-Foundation | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PASS |
Russ Owen
|
|
|
pump will be schedule at 2:30\\###-####
|
BLD-Footing | 5/1/2000 | 5/1/2000 | 5/1/2000 | A | PART |
Russ Owen
|
|
|
OK except steel not in place.
|
Issue PAID IN FULL permit | | | 4/28/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 4/18/2000 | 4/18/2000 | 4/24/2000 | | PASS |
Dan Overy
|
|
|
4/24/2000 13:59:30 DJO - activity updated through activity BLDA022 from case BLD00-00995.
|
Plan Reviewer's activity | | | 4/24/2000 | | DONE |
|
|
|
red lined plans with engineering submitted. can issue
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/24/2000 | | DONE |
|
|
|
talked to jay gave dollar amount w/temp pole
|
Print Pending Permit.LaserJet4 | | | 4/18/2000 | | DONE |
|
|
|
|
Plan Review Report | | | 4/18/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/18/2000 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/18/2000 | | DONE |
|
|
|
CALLED JAY CLOW & LEFT MESSAGE. NEED ADDITIONAL INFORMATION AND ENGINEERING.
|
Routing - PUBLIC WORKS | 4/14/2000 | 4/14/2000 | 4/14/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 4/14/2000 | 4/14/2000 | 4/14/2000 | | DONE |
|
|
|
|
Application received | | | 4/14/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 4/14/2000 | 4/14/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 4/14/2000 | | | | PEND |
Dan Overy
|
|
|
|