Letter of compliance | | | 9/20/2001 | | DONE |
|
|
|
Letter of Compliance #20888 issued 9-20-01. 10/18 Fee are on other permits for this project...this was a phased permit
|
BLD-Final | 9/6/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/6/2001 8:32:34 AM Reinsp OK for permanant occupancy
|
Telephone call | | | 6/25/2001 | | DONE |
|
|
|
Left msg. for Tim Bashford re: status of temp. occ.
|
Telephone call | | | 5/21/2001 | | DONE |
|
|
|
Talked w/Tim Bashford @ ###-#### re: status of temp. occ. & he will follow up.
|
Fee Review-notes | 4/18/2000 | 4/18/2000 | 4/19/2001 | | DONE |
|
|
|
values are way off...
|
Case Summary (BLD) | | | 4/16/2001 | | DONE |
|
|
|
|
Temporary occupancy | | | 4/2/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4531 issued 4-2-01 to Hewlett-Packard.
|
BLD-Final | 3/28/2001 | 3/28/2001 | 3/28/2001 | A | PART |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 3/28/2001 10:54:21 AM ok for temp occ need final eng letter of app and smoke door app 3/28/2001 10:55:46 AM
|
FIRE-Final Inspection | 3/21/2001 | 3/22/2001 | 3/22/2001 | P | PART |
Joe Tawney
|
|
|
Reinsp OK for temporary occupancy 3/23/2001 8:19:44 AM
|
FIRE-Final Inspection | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 3/15/2001 1:10:52 PM
|
FIRE-Final Inspection | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | PART |
Joe Tawney
|
|
|
Conf with contr reg Bldg #5 temp occ 3/14/2001 12:31:48 PM
|
BLD-Final | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/13/2001 at 10:38:38. Contact: ###-####.
|
Additional plans submitted | | | 2/20/2001 | | DONE |
|
|
|
Reeceived additional plans from Lombard Conrad Architects, forwarded same to Dan Stuart. 2/19/01 DAR
|
Additional plans submitted | | | 2/20/2001 | | DONE |
|
|
|
Received additional information from Lombard Conrad Architects. Forwarded same to Dan Stuart. 2/20/01 DAR
|
BLD-Other | 1/22/2001 | 1/22/2001 | 1/22/2001 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 1/22/2001 10:46:40 AM wip for muti permits 1/22/2001 10:47:51 AM
|
BLD-Conference | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 408 On 1/8/2001 9:26:22 AM , cancel per 408 1/9/2001 11:10:49 AM
|
BLD-Framing/Rough-in | 9/12/2000 | 12/26/2000 | 12/26/2000 | A | NR |
Jim Storey
|
|
|
David ###-#### walked job dave did not know who called in for insp. and had no work to be insp. shaft not complet. 12/26/2000 9:18:58 AM
|
BLD-Framing/Rough-in | 9/12/2000 | 12/19/2000 | 12/19/2000 | A | PART |
Tom Arcoraci
|
|
|
David ###-#### wip 12/20/2000 5:29:19 PM
|
BLD-Framing/Rough-in | 9/12/2000 | 12/19/2000 | 12/19/2000 | A | PART |
Tom Arcoraci
|
|
|
David ###-#### wip 12/20/2000 5:29:19 PM
|
BLD-Framing/Rough-in | 9/12/2000 | 12/12/2000 | 12/12/2000 | A | CANC |
Tom Arcoraci
|
|
|
David ###-####
|
BLD-Framing/Rough-in | 9/12/2000 | 12/5/2000 | 12/5/2000 | A | PASS |
Tom Arcoraci
|
|
|
David ###-#### wip 12/5/2000 8:40:41 AM
|
BLD-Conference | 12/1/2000 | 12/4/2000 | 12/4/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 12/1/2000 8:31:10 AM
|
BLD-Framing/Rough-in | 9/12/2000 | 11/28/2000 | 11/28/2000 | A | PART |
Tom Arcoraci
|
|
|
David ###-####
|
BLD-Framing/Rough-in | 9/12/2000 | 11/21/2000 | 11/21/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### David wip grid in base ok 11/21/2000 2:58:18 PM
|
BLD-Framing/Rough-in | 9/12/2000 | 11/14/2000 | 11/14/2000 | A | CANC |
Tom Arcoraci
|
|
|
###-#### David
|
BLD-Framing/Rough-in | 9/12/2000 | 11/7/2000 | 11/7/2000 | A | PART |
Tom Arcoraci
|
|
|
David ###-#### wip 11/7/2000 2:59:22 PM
|
BLD-Framing/Rough-in | 9/12/2000 | 10/31/2000 | 10/31/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### David wip conf 10/31/2000 11:15:14 AM
|
BLD-Framing/Rough-in | 9/12/2000 | 10/24/2000 | 10/24/2000 | A | CANC |
Tom Arcoraci
|
|
|
David ###-#### 10/25/2000 10:44:23 AM will recall 10/26/2000 8:11:38 AM
|
BLD-Framing/Rough-in | 9/12/2000 | 10/17/2000 | 10/17/2000 | A | PART |
Tom Arcoraci
|
|
|
David ###-#### wip 10/17/2000 4:40:46 PM
|
BLD-Framing/Rough-in | 9/12/2000 | 10/10/2000 | 10/10/2000 | A | CANC |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/12/2000 | 10/3/2000 | 10/3/2000 | A | PART |
Tom Arcoraci
|
|
|
David ###-#### wip ok 10/3/2000 11:47:41 AM
|
BLD-Framing/Rough-in | 9/12/2000 | 9/26/2000 | 9/26/2000 | A | PART |
Tom Arcoraci
|
|
|
David ###-#### cn posted for 2 hr floor pents 9/26/2000 12:29:06 PM
|
BLD-Framing/Rough-in | 9/12/2000 | 9/19/2000 | 9/19/2000 | A | PART |
Tom Arcoraci
|
|
|
David ###-#### model room in basesment 9/19/2000 12:18:58 PM
|
BLD-Conference | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PASS |
Tom Arcoraci
|
|
|
Dan Haze ###-#### or ###-#### before 11:00 am conf on temp occ for model room 9/15/2000 10:47:34 AM
|
FIRE-Conference | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PART |
Joe Tawney
|
|
|
Dan Haze ###-#### or ###-#### Conf on temp occ of part of bldg #5 basement 9/15/2000 12:14:25 PM
|
BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### david 9/11/2000 2:47:04 PM ok to cover corridor walls and ac shafts 9/11/2000 2:48:09 PM
|
BLD-Framing/Rough-in | 8/15/2000 | 8/16/2000 | 8/16/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/15/2000 at 11:52:45. Contact: ###-####. cn posted on shfts 8/16/2000 1:29:18 PM
|
Issue PAID IN FULL permit | | | 7/10/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/8/2000 | 5/8/2000 | 6/29/2000 | | PASS |
|
|
|
Received re-submittals on 6/28/00. Reviewed and inserted into plans. Approved as noted and attached. Routing for issuance of permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2000 | | PASS |
|
|
|
To permit desk for issuance of permit.
|
Print Occupancy Form | | | 6/29/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/29/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/29/2000 | | DONE |
|
|
|
called Sam Burrows at ###-#### gave fees and permit is ready for pickup
|
Plan assigned to (DRS) | 4/19/2000 | | 6/29/2000 | | PASS |
Dan Stuart
|
|
|
6/29/2000 10:00:55 DRS - activity updated through activity BLDA022 from case BLD00-01050.
|
Plan resubmittals received | | | 6/28/2000 | | DONE |
|
|
|
Resubmittal letter, plan sheets A2.6, A2.9, A2.10, A6.2, A6.4, S5.1, S5.2, S5.3 and supporting documents received and forwarded to Dan Stuart.
|
Routing Off Site - STRUCTURAL | 5/4/2000 | | 5/19/2000 | | PASS |
|
|
|
SENT PLANS TO CONSULTING STRUCTURAL ENGINEER VIA PDQ. 5/4/00 DAR
5/19/00 PLANS AND COMENTS RETURNED FROM OUTSIDE ENG. ROUTED TO DAN S. KMM
5/19/00 - structural plan review approved with comments. No response required to outside engineer review.
6/28/00 - Received new structural sheets S5.1 thru S5.3 covering comments made.Inserted into plans.
|
Routing - FIRE | 5/5/2000 | 5/8/2000 | 5/8/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 5/8/2000 | | FAIL |
Bill Alexander
|
|
|
|
Routing - PLANNING | 5/2/2000 | | 5/5/2000 | | PASS |
|
|
|
CUP99-00134 - approved by BGN
DRH00-00002 - approved by TKW
|
Additional plans submitted | | | 5/3/2000 | | DONE |
|
|
|
RECEIVED A SEPARATE COPY OF STRUCTURAL SHEETS & ENGINEERING CALCULATIONS FOR ROUTING TO OUTSIDE STRUCTURAL ENGINEERING PEER REVIEW. TAKEN TO FRONT DESK OF PLAN REVIEW FOR ROUTING OUT TO STRUCTURAL ENGINEER.
|
Pending Assignment by MYS | 4/18/2000 | | 5/1/2000 | | DONE |
Marlene Southard
|
|
|
|
Routing - PLAN CHECK | 4/24/2000 | | 5/1/2000 | | FAIL |
|
|
|
RESUBMITTALS REQUIRED. STILL NEED STRUCTURAL ENGINEERS EVALUATION PLAN REVIEW REPORT BEFORE THOSE COMMENTS CAN BE FORWARDED FOR RESPONSE IF REQUIRED. ROUTING TO FIRE CODE ANALYST FOR REVIEW AND COMMENT WHILE WAITING FOR ARCHITECTS RESPONSE.
|
Plan resubmittals requested | | | 5/1/2000 | | FAIL |
|
|
|
FAXED AND MAILED COPY OF PLAN REVIEW COMMENTS TO ARCHITECT, SAM BURROWS OF LOMBARD-CONRAD ARCHITECTS.
|
Telephone call | | | 5/1/2000 | | DONE |
|
|
|
CALLED SAM TO REQUEST A THIRD COMPLETE SET OF PLANS AND ENGINEERING CALCULATIONS FOR ROUTING TO THIRD PART CONTRACT STRUCTURAL ENGINEER FOR REVIEW OF STRUCTURAL MODIFICATIONS FOR NEW LOADING & MODIFICATIONS FOR NEW SHAFT ENCLOSURE AND MECHANICAL SCREENING AT ROOF TOP MECHANICAL WELL. I TOLD SAM I HAD COMPLETED MY PRELIMINARY REVIEW AND WOULDFAX AND MAIL HIM A COPY OF THE REVIEW AND FORWARD THE PLANS FOR FIRE CODE REVIEW WHILE AWATING HIS RE-SUBMITTALS.
|
Routing - PLUMBING | 4/21/2000 | | 4/24/2000 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/24/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEET A2.6 AND TWO COPIES OF STRUCTURAL CALCS. ROUTED TO DAN S. KMM
|
Routing - PUBLIC WORKS | 4/19/2000 | | 4/21/2000 | | DONE |
|
|
|
|
Plan routing begun/TENANTS | | | 4/19/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/19/2000 | | PEND |
|
|
|
LEFT MESSAGE WITH SAM BURROWS. PLANS NEED TO BE FULLY DIMENSIONED. RECOMENDED A DIMENSION SHEET CALLING OUT WAR ROOMS, CONFERENCE ROOM, DOCK AREAS, AVAILABLE SPACE AREAS SERVER EQUIP. ROOM AREAS AND SO ON. DANNY S. ALSO WOULD LIKE A TYPICAL OR OVERALL DIMENSION. STRUCTURAL PLANS NOT STAMPED OR SIGNED. REQUIRES STRUCT. CALCS. WILL START ROUTING BECAUSE THIS IS A GREEN TAG ITEM. KMM
4/24/2000 RECEIVED DIMENSIONS AND STRUCT. CALCS. STRUCT. PLANS SILL NEED TO BE STAMPED AND SIGNED. KMM
|
Received Certificate of Value | | | 4/18/2000 | | DONE |
|
|
|
|
Application received | | | 4/18/2000 | | |
|
|
|
|