Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01050
StatusFinaled
Name HEWLETT-PACKARD ATT: OLGA
Site Address 11311 W CHINDEN BLVD
Project NameHP #5 - UPGRADE(PHASE III)
Customer Number 
ePlanReviewNo
Description
HEWLETT PACKARD BUILDING 5-UPGRADE (PHASE III) * THE COMPLETE UPGRADE OF FIRST FLOOR; ADD A SERVER EQUIPMENT ROOM ON THE WEST MECHANICAL MEZZANINE; FOUR NEW VERTICAL MECHANICAL SHAFTS FROM THE MEZZANINES UP THROUGH THE ROOF; CONSTRUCT MECHANICAL EQUIPMENT SCREEN WALL'S ON THE ROOF ADJACENT TO THE NEW SHAFTS & NEW ACCESS DOORS TO SHAFT & MECHANICAL WELL; TO ADD TO EXISTING STAIRWELL STRUCTURE AT ROOF ACCESS; INSTALL NEW STRUCTURAL SUPPORTS, MECHANICAL EQUIPMENT; RAISED NON-COMBUSTIBLE FLOOR SYSTEM, RAMPS, OFFICE CUBICLE'S, INTERIOR FINISH & UPGRADES, ELECTRICAL, MECHANICAL, PLUMBING, SPRINKLER & ALARM SYSTEMS UPGRADES AND EXIT SYSTEM UPGRADES. ALL PER THE APPROVED PLANS, NOTES & ATTACHMENTS THERE TO. DR#00-00002; CUP99-00134; PC#00-283 / drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  9/20/2001 DONE
Letter of Compliance #20888 issued 9-20-01. 10/18 Fee are on other permits for this project...this was a phased permit
BLD-Final9/6/20019/6/20019/6/2001APASS
DetailsJoe Tawney
Added by Inspector: 406 On 9/6/2001 8:32:34 AM Reinsp OK for permanant occupancy
Telephone call  6/25/2001 DONE
Left msg. for Tim Bashford re: status of temp. occ.
Telephone call  5/21/2001 DONE
Talked w/Tim Bashford @ ###-#### re: status of temp. occ. & he will follow up.
Fee Review-notes4/18/20004/18/20004/19/2001 DONE
values are way off...
Case Summary (BLD)  4/16/2001 DONE
Temporary occupancy  4/2/2001 PART
Temp. Occ. Cert. #4531 issued 4-2-01 to Hewlett-Packard.
BLD-Final3/28/20013/28/20013/28/2001APART
DetailsTom Arcoraci
Added by Inspector: 408 On 3/28/2001 10:54:21 AM ok for temp occ need final eng letter of app and smoke door app 3/28/2001 10:55:46 AM
FIRE-Final Inspection3/21/20013/22/20013/22/2001PPART
DetailsJoe Tawney
Reinsp OK for temporary occupancy 3/23/2001 8:19:44 AM
FIRE-Final Inspection3/14/20013/15/20013/15/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued 3/15/2001 1:10:52 PM
FIRE-Final Inspection3/13/20013/14/20013/14/2001APART
DetailsJoe Tawney
Conf with contr reg Bldg #5 temp occ 3/14/2001 12:31:48 PM
BLD-Final3/13/20013/14/20013/14/2001ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 03/13/2001 at 10:38:38. Contact: ###-####.
Additional plans submitted  2/20/2001 DONE
Reeceived additional plans from Lombard Conrad Architects, forwarded same to Dan Stuart. 2/19/01 DAR
Additional plans submitted  2/20/2001 DONE
Received additional information from Lombard Conrad Architects. Forwarded same to Dan Stuart. 2/20/01 DAR
BLD-Other1/22/20011/22/20011/22/2001APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 1/22/2001 10:46:40 AM wip for muti permits 1/22/2001 10:47:51 AM
BLD-Conference1/8/20011/9/20011/9/2001ACANC
DetailsCarl Dependahl
Scheduled by Inspector: 408 On 1/8/2001 9:26:22 AM , cancel per 408 1/9/2001 11:10:49 AM
BLD-Framing/Rough-in9/12/200012/26/200012/26/2000ANR
DetailsJim Storey
David ###-#### walked job dave did not know who called in for insp. and had no work to be insp. shaft not complet. 12/26/2000 9:18:58 AM
BLD-Framing/Rough-in9/12/200012/19/200012/19/2000APART
DetailsTom Arcoraci
David ###-#### wip 12/20/2000 5:29:19 PM
BLD-Framing/Rough-in9/12/200012/19/200012/19/2000APART
DetailsTom Arcoraci
David ###-#### wip 12/20/2000 5:29:19 PM
BLD-Framing/Rough-in9/12/200012/12/200012/12/2000ACANC
DetailsTom Arcoraci
David ###-####
BLD-Framing/Rough-in9/12/200012/5/200012/5/2000APASS
DetailsTom Arcoraci
David ###-#### wip 12/5/2000 8:40:41 AM
BLD-Conference12/1/200012/4/200012/4/2000APASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 12/1/2000 8:31:10 AM
BLD-Framing/Rough-in9/12/200011/28/200011/28/2000APART
DetailsTom Arcoraci
David ###-####
BLD-Framing/Rough-in9/12/200011/21/200011/21/2000APART
DetailsTom Arcoraci
###-#### David wip grid in base ok 11/21/2000 2:58:18 PM
BLD-Framing/Rough-in9/12/200011/14/200011/14/2000ACANC
DetailsTom Arcoraci
###-#### David
BLD-Framing/Rough-in9/12/200011/7/200011/7/2000APART
DetailsTom Arcoraci
David ###-#### wip 11/7/2000 2:59:22 PM
BLD-Framing/Rough-in9/12/200010/31/200010/31/2000APART
DetailsTom Arcoraci
###-#### David wip conf 10/31/2000 11:15:14 AM
BLD-Framing/Rough-in9/12/200010/24/200010/24/2000ACANC
DetailsTom Arcoraci
David ###-#### 10/25/2000 10:44:23 AM will recall 10/26/2000 8:11:38 AM
BLD-Framing/Rough-in9/12/200010/17/200010/17/2000APART
DetailsTom Arcoraci
David ###-#### wip 10/17/2000 4:40:46 PM
BLD-Framing/Rough-in9/12/200010/10/200010/10/2000ACANC
DetailsTom Arcoraci
###-####
BLD-Framing/Rough-in9/12/200010/3/200010/3/2000APART
DetailsTom Arcoraci
David ###-#### wip ok 10/3/2000 11:47:41 AM
BLD-Framing/Rough-in9/12/20009/26/20009/26/2000APART
DetailsTom Arcoraci
David ###-#### cn posted for 2 hr floor pents 9/26/2000 12:29:06 PM
BLD-Framing/Rough-in9/12/20009/19/20009/19/2000APART
DetailsTom Arcoraci
David ###-#### model room in basesment 9/19/2000 12:18:58 PM
BLD-Conference9/14/20009/15/20009/15/2000APASS
DetailsTom Arcoraci
Dan Haze ###-#### or ###-#### before 11:00 am conf on temp occ for model room 9/15/2000 10:47:34 AM
FIRE-Conference9/14/20009/15/20009/15/2000APART
DetailsJoe Tawney
Dan Haze ###-#### or ###-#### Conf on temp occ of part of bldg #5 basement 9/15/2000 12:14:25 PM
BLD-Framing/Rough-in9/11/20009/11/20009/11/2000PPART
DetailsTom Arcoraci
###-#### david 9/11/2000 2:47:04 PM ok to cover corridor walls and ac shafts 9/11/2000 2:48:09 PM
BLD-Framing/Rough-in8/15/20008/16/20008/16/2000AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/15/2000 at 11:52:45. Contact: ###-####. cn posted on shfts 8/16/2000 1:29:18 PM
Issue PAID IN FULL permit  7/10/2000 DONE
Routing - PLAN CHECK5/8/20005/8/20006/29/2000 PASS
Received re-submittals on 6/28/00. Reviewed and inserted into plans. Approved as noted and attached. Routing for issuance of permit.
PLANS/APPL TAKEN TO FRONT DESK  6/29/2000 PASS
To permit desk for issuance of permit.
Print Occupancy Form  6/29/2000 DONE
Inspection Record Card- Bld  6/29/2000 DONE
Telephone call  6/29/2000 DONE
called Sam Burrows at ###-#### gave fees and permit is ready for pickup
Plan assigned to (DRS)4/19/2000 6/29/2000 PASS
DetailsDan Stuart
6/29/2000 10:00:55 DRS - activity updated through activity BLDA022 from case BLD00-01050.
Plan resubmittals received  6/28/2000 DONE
Resubmittal letter, plan sheets A2.6, A2.9, A2.10, A6.2, A6.4, S5.1, S5.2, S5.3 and supporting documents received and forwarded to Dan Stuart.
Routing Off Site - STRUCTURAL5/4/2000 5/19/2000 PASS
SENT PLANS TO CONSULTING STRUCTURAL ENGINEER VIA PDQ. 5/4/00 DAR
5/19/00 PLANS AND COMENTS RETURNED FROM OUTSIDE ENG. ROUTED TO DAN S. KMM
5/19/00 - structural plan review approved with comments. No response required to outside engineer review.
6/28/00 - Received new structural sheets S5.1 thru S5.3 covering comments made.Inserted into plans.
Routing - FIRE5/5/20005/8/20005/8/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  5/8/2000 FAIL
DetailsBill Alexander
Routing - PLANNING5/2/2000 5/5/2000 PASS
CUP99-00134 - approved by BGN
DRH00-00002 - approved by TKW
Additional plans submitted  5/3/2000 DONE
RECEIVED A SEPARATE COPY OF STRUCTURAL SHEETS & ENGINEERING CALCULATIONS FOR ROUTING TO OUTSIDE STRUCTURAL ENGINEERING PEER REVIEW. TAKEN TO FRONT DESK OF PLAN REVIEW FOR ROUTING OUT TO STRUCTURAL ENGINEER.
Pending Assignment by MYS4/18/2000 5/1/2000 DONE
DetailsMarlene Southard
Routing - PLAN CHECK4/24/2000 5/1/2000 FAIL
RESUBMITTALS REQUIRED. STILL NEED STRUCTURAL ENGINEERS EVALUATION PLAN REVIEW REPORT BEFORE THOSE COMMENTS CAN BE FORWARDED FOR RESPONSE IF REQUIRED. ROUTING TO FIRE CODE ANALYST FOR REVIEW AND COMMENT WHILE WAITING FOR ARCHITECTS RESPONSE.
Plan resubmittals requested  5/1/2000 FAIL
FAXED AND MAILED COPY OF PLAN REVIEW COMMENTS TO ARCHITECT, SAM BURROWS OF LOMBARD-CONRAD ARCHITECTS.
Telephone call  5/1/2000 DONE
CALLED SAM TO REQUEST A THIRD COMPLETE SET OF PLANS AND ENGINEERING CALCULATIONS FOR ROUTING TO THIRD PART CONTRACT STRUCTURAL ENGINEER FOR REVIEW OF STRUCTURAL MODIFICATIONS FOR NEW LOADING & MODIFICATIONS FOR NEW SHAFT ENCLOSURE AND MECHANICAL SCREENING AT ROOF TOP MECHANICAL WELL. I TOLD SAM I HAD COMPLETED MY PRELIMINARY REVIEW AND WOULDFAX AND MAIL HIM A COPY OF THE REVIEW AND FORWARD THE PLANS FOR FIRE CODE REVIEW WHILE AWATING HIS RE-SUBMITTALS.
Routing - PLUMBING4/21/2000 4/24/2000 DONE
Plan resubmittals received  4/24/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEET A2.6 AND TWO COPIES OF STRUCTURAL CALCS. ROUTED TO DAN S. KMM
Routing - PUBLIC WORKS4/19/2000 4/21/2000 DONE
Plan routing begun/TENANTS  4/19/2000 DONE
Plans ACCEPTED BY PLAN TECH  4/19/2000 PEND
LEFT MESSAGE WITH SAM BURROWS. PLANS NEED TO BE FULLY DIMENSIONED. RECOMENDED A DIMENSION SHEET CALLING OUT WAR ROOMS, CONFERENCE ROOM, DOCK AREAS, AVAILABLE SPACE AREAS SERVER EQUIP. ROOM AREAS AND SO ON. DANNY S. ALSO WOULD LIKE A TYPICAL OR OVERALL DIMENSION. STRUCTURAL PLANS NOT STAMPED OR SIGNED. REQUIRES STRUCT. CALCS. WILL START ROUTING BECAUSE THIS IS A GREEN TAG ITEM. KMM
4/24/2000 RECEIVED DIMENSIONS AND STRUCT. CALCS. STRUCT. PLANS SILL NEED TO BE STAMPED AND SIGNED. KMM
Received Certificate of Value  4/18/2000 DONE
Application received  4/18/2000