Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD00-01051
StatusFinaled
Name HEWLETT-PACKARD CO
Site Address 11311 W CHINDEN BLVD
Project NameHP #5 - PLAZA LEVEL
Customer Number 
ePlanReviewNo
Description
HEWLETT PACKARD BUILDING 5-UPGRADE (PHASE IV) * TENANT IMPROVMENT IN BASEMENT (PLAZA) LEVEL OF BUILDING #5 TO ACCOMMODATE TRAINING CENTER. TO CONSTRUCT INTERIOR NON-BEARING, NON-COMBUSTIBLE FRAME WALLS WITHIN OPEN ROOMS TO CREATE INDIVIDUAL CLASSROOMS; INSTALL SHEETROCK COVER; SUSPENDED CEILING SYSTEM; ELECTRICAL, MECHANICAL, SPECIAL SYSTEMS, ALARM & SPRINKLER SYSTEMS, RAISED FLOOR SYSTEM IN PART OF AREA AND UPGRADE EXITING AND ACCESSIBILITY REQUIREMENTS BASED ON NEW ASSEMBLY OCCUPANCY USES. ALL PER APPROVED PLANS, NOTES & ATTACHMENTS. NOTE: THIS BUILDING IS FULLY SPRINKLED. PC#OO-282 / drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/29/2009 DONE
Case Summary (BLD)  9/22/2008 DONE
Case Summary (BLD)  9/22/2008 DONE
Fee Review-notes6/25/20036/25/20036/25/2003 DONE
Additional values from subcontractors.
Permanent Occupancy 9/20/20019/20/2001 DONE
Details
Permanent occupancy  9/20/2001 DONE
Perm. Occ. Cert. #8833 issued 9-20-01 to Hewlett-Packard, Bldg. #5 for the plaza level training center.
BLD-Final9/6/20019/6/20019/6/2001APASS
DetailsJoe Tawney
Added by Inspector: 406 On 9/6/2001 8:30:20 AM Reinsp OK for permanant occupancy
Telephone call  6/25/2001 DONE
Left msg. for Tim Bashford re: status of temp. occ.
Telephone call  5/21/2001 DONE
Talked w/Tim Bashford @###-#### re: status of temp. occ. & he will follow up.
Fee Review-notes4/18/20004/18/20004/19/2001 DONE
total value is for bld00-01050 & bld00-01051
Case Summary (BLD)  4/16/2001 DONE
BLD-Final3/28/20013/28/20013/28/2001APART
DetailsTom Arcoraci
Added by Inspector: 408 On 3/28/2001 10:56:44 AM need smoke door approval
Temporary occupancy  3/28/2001 PART
Temp. Occ. Cert. #4528 issued 3-28-01 to Hewlett Packard Bldg. #5.
BLD-Final3/23/20013/22/20013/22/2001PPART
DetailsJoe Tawney
Added by Inspector: 406 On 3/23/2001 8:21:56 AM Reinsp OK for temporary occupancy
FIRE-Final Inspection3/14/20013/15/20013/15/2001AFAIL
DetailsJoe Tawney
Reinsp Fail C/N not completed 3/15/2001 1:12:45 PM
BLD-Conference1/23/20011/22/20011/22/2001PPART
DetailsJoe Tawney
Added by Inspector: 406 On 1/23/2001 8:19:06 AM Conf w/Kevin reg spklr protection under plastic obstructions. Bill Alexander also attended.
Additional plans submitted  1/12/2001 DONE
Received small documents from Lombard Conrad Architects, Sam Burrows, forwarded same to Dan Stuart. 1/12/01 DAR
FIRE-Final Inspection12/1/200012/4/200012/4/2000AFAIL
DetailsJoe Tawney
###-####. 12/4/2000 8:14:41 AM Final Fail C/N issued 12/4/2000 12:57:20 PM
BLD-Final12/1/200012/4/200012/4/2000AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/01/2000 at 11:20:10. Contact: ###-####. cn issued on bld00-00238 12/4/2000 12:16:09 PM
Plan resubmittals received  11/30/2000  
Resubmittals received from Sam Burrows and routed to Dan Stuart.
Print Occupancy Form  11/16/2000 DONE
Issue PAID IN FULL permit  7/10/2000 DONE
Print Occupancy Form  7/5/2000 DONE
Inspection Record Card- Bld  7/5/2000 DONE
Telephone call  7/5/2000 DONE
called Sam Burrows at ###-#### permit ready for pickup
PLANS/APPL TAKEN TO FRONT DESK  7/3/2000 PASS
To permit desk for issuance of permit.
Plan assigned to (DRS)4/20/2000 7/3/2000 PASS
DetailsDan Stuart
7/3/2000 16:59:40 DRS - activity updated through activity BLDA022 from case BLD00-01051.
Routing - PLAN CHECK5/8/2000 7/3/2000 PASS
Approved as noted and attached. Received new submittal on 6/30/00. Some items incomplete but of such consequence as to allow clarification note on plan and plan review comments for contractor & inspector to verify in field.
Routing - FIRE5/5/20005/8/20005/8/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  5/8/2000 FAIL
DetailsBill Alexander
Plan resubmittals requested  5/5/2000 FAIL
Faxed & mailed copy of plan review to architect requesting resubmittal clarification details.
Routing - PLAN CHECK4/24/2000 5/5/2000 FAIL
Preliminary plan review completed. Resubmittals required. Copy of review FAXED & amiled to architect Sam Burrows. Routing to Fire Code Analysts for review.
Routing - PLUMBING4/21/2000 4/24/2000 DONE
Plan resubmittals received  4/24/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEET A2.2A. ROUTED TO DAN S. KMM
Routing - PUBLIC WORKS4/20/2000 4/21/2000 DONE
Received Certificate of Value  4/21/2000 DONE
RECEIVED REVISED CERT. OF VALUE WITH PLUMB. VALUE. PUT ONE IN FILE AND ROUTED TWO TO DAN S. KMM
Plan routing begun/TENANTS  4/20/2000  
Plans ACCEPTED BY PLAN TECH  4/20/2000 PEND
CERT. OF VALUE REQUIRES PLUMB. VALUE, AS PLUMB. PLANS WERE SUBMITTED.
MN1.7 SHEET NOT SIGNED
PLANS NEED TO BE FULLY DIMENSIONED EITHER OVER-ALL OR A TYPICAL AS WELL AS DIMENSIONS ON THE NEW ROOM. (DIMENSION SHEET)
HAVE ASKED IF FFIRE PROTECTION FIRE ALARM SYSTEM AND SMOKE CONTROL SYSTEM PAR OF DESIGN AND TO PUT ON COVER SHEET.
FAXED ALL OF ABOVE ITEM TO SAM BURROWS. KMM
4-24-2000 RECEIVED CERT. OF VALUE WITH PLUMB. VALUE. ALSO RECEIVED TWO COPIES OF DIMENSIONS. STILL WAITING FOR MN1.7 STAMPED AND SIGNED SHEET. KMM
Received Certificate of Value  4/20/2000 PEND
REQUIRES PLUMB. VALUE. KMM
PLUMBING VALUE $10,000.00 DAR 4/20/00
Application received  4/18/2000  
Pending Assignment by MYS4/18/2000    
DetailsMarlene Southard