Plan resubmittals received | | | 9/23/2002 | | DONE |
|
|
|
6/12/00 Trey Hoff designs resubmitted engineering and design changes.
|
BLD-Final | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | PASS |
Tony Young
|
|
|
###-####
concrete is done, 7/20/2001 2:54:34 PM
|
DOC - Permit Finaled | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 7/20/2001 2:54:41 PM
|
BLD-Final | 6/28/2001 | 6/29/2001 | 6/29/2001 | A | PART |
Steven Webb
|
|
|
Scott ###-#### please call Temporary C. of C. #20446 issued--good for 30 days--expires 7-29-01. Contractor to re-schedule final -- inspector to verify hard driveway at this time and re-issue new c. of c. 6/29/2001 10:08:01 AM
|
Letter of compliance | | | 6/29/2001 | | DONE |
|
|
|
Letter of Compliance #21552 issued 6-29-01.
|
CHANGE STATUS TO (ISS) | | | 6/20/2001 | | DONE |
|
|
|
slow progress large home.
|
BLD-Wall cover | 11/17/2000 | 11/20/2000 | 11/20/2000 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 18:24:00. Contact: . ok to cover. 11/20/2000 10:11:45 AM
|
BLD-Framing/Rough-in | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 07:10:30. Contact: .left c/n to remove foam insulation from vent pipe of gas log unit. 11/17/2000 3:19:48 PMalso called framer. 11/17/2000 3:23:04 PM
|
BLD-Framing/Rough-in | 11/15/2000 | 11/16/2000 | 11/16/2000 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 14:04:58. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/13/2000 | 11/14/2000 | 11/14/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 11:49:35. Contact: ###-####.c/n posted. 11/14/2000 12:31:23 PM
|
BLD-Framing/Rough-in | 11/9/2000 | 11/13/2000 | 11/13/2000 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 16:34:38. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | FAIL |
Russ Owen
|
|
|
FR INSP-- DAN ###-#### CELL SHEAR WALL allready done. 11/8/2000 9:05:13 AM
|
BLD-Framing/Rough-in | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | FAIL |
Russ Owen
|
|
|
fr insp dan ###-####c/n posted. 11/7/2000 12:38:50 PM
|
BLD-Framing/Rough-in | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | FAIL |
Steven Webb
|
|
|
fr & shear wall - dan ###-####--call 1st before insp: mechanical failed. 11/3/2000 12:18:37 PM 11/3/2000 12:30:27 PM: c/n issued, on shear items. 11/3/2000 3:06:45 PM
|
BLD-Framing/Rough-in | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | FAIL |
Russ Owen
|
|
|
SHEAR NAILING\\###-#### Need to have a hold down and nailing schwedual. left c/n posted ,note have started with paper and wire for stucco with out approval. 11/3/2000 10:44:22 AM
|
BLD-Framing/Rough-in | 9/28/2000 | 9/29/2000 | 9/29/2000 | A | PART |
Russ Owen
|
|
|
nailing diaphram for roof --dan ###-####roof ok to cover. 9/29/2000 12:34:25 PM
|
BLD-Foundation | 8/7/2000 | 8/8/2000 | 8/8/2000 | P | CANC |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 8/7/2000 | 8/8/2000 | 8/8/2000 | P | PART |
Tony Young
|
|
|
###-####
WIP Gate code is *8889 8/8/2000 2:00:07 PM
|
BLD-Footing | 8/4/2000 | 8/7/2000 | 8/7/2000 | A | PART |
Russ Owen
|
|
|
###-####Appears ok no approved plans. 8/7/2000 1:11:07 PM
|
Issue PAID IN FULL permit | | | 7/20/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/15/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/15/2000 | | DONE |
|
|
|
###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 5/9/2000 | | 6/14/2000 | | PASS |
Steve Munroe
|
|
|
6/14/2000 14:20:08 SAM - activity updated through activity BLDA022 from case BLD00-01063.
|
Pending Assignment by DJO | 4/19/2000 | | 5/9/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 4/19/2000 | 4/19/2000 | 4/20/2000 | | DONE |
|
|
|
|
Application received | | | 4/19/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 4/20/2000 | 4/20/2000 | | | PEND |
|
|
|
|
Routing - PLANNING | 4/19/2000 | 4/19/2000 | | | PASS |
|
|
|
2' maximun encroachment into building rear setback line with eave. no other encroachment allowed.
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
5/10/00 8:30 Called and talked to Darin with Pinnacle. He said he would call me back regarding this job.
5/12/00 11:25 Darin with Pinnacle called me back and we went over the lateral engineering. He also said that he did gravity engineering and will fax me a revised sheet 9 of the lateral engineering. I then called and left a message on Brett Spangenberg, with Trey Hoff Designs, phone to call me.
|
Telephone call | | | | | PEND |
|
|
|
5/15/00 9:54 Called and talked to Trey with Trey Hoff Designs and let him know that I have made some red-lines on his plans. He said that was okay and if I want to approved them that way is fine with him. He will get me the gravity engineering soon.
|
Telephone call | | | | | PEND |
|
|
|
5/16/00 10:48 Called and left a message for Trey to call me about the beam engineering and the location on the plans. He is out of town today.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|