Permit Information
Permit NumberBLD00-01070
StatusFinaled
Name JIM JENSEN CONSTRUCTION
Site Address 4181 S STARGAZER PL
Project Name 
Customer Number463-4357
ePlanReviewNo
Description
To construct a 3096 sq. ft. two story single family dwelling (2000 sq. ft. first floor/1096 sq. ft. second floor) with a 783 sq. ft. finished basement, a attached 1124 sq. ft. three car garage and 264 sq. ft. of red-wood deck and a 84 sq. ft. covered front porch. NATURAL LIGHT REQUIREMENT NEEDS TO BE MET IN THE BASEMENT. Per approved plans, engineering and requirement list. This is a solar protected lot. PC#345 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/6/200011/7/200011/7/2000APASS
DetailsAlan Hauser
c/c#19842 11/7/2000 12:11:49 PM
BLD-Final11/7/200011/6/200011/6/2000PFAIL
DetailsRuss Owen
Added by Inspector: 407 On 11/7/2000 failed exterior deck guardrail height spacings again.
BLD-Final11/3/200011/6/200011/6/2000AFAIL
DetailsRuss Owen
###-#### call first
BLD-Final11/2/200011/3/200011/3/2000PFAIL
DetailsSteven Webb
jim ###-#### fn: Ext. deck railings & nails in hangers. 11/3/2000 2:04:49 PM
BLD-Final11/2/200011/2/200011/2/2000PCANC
DetailsSteven Webb
fn occ jim ###-#### --cancel
BLD-Final10/31/200011/1/200011/1/2000PFAIL
DetailsRuss Owen
FN INSP- JIM ###-#### -RE-INSP C/n posted. 11/3/2000 10:42:57 AM
BLD-Final10/30/200010/31/200010/31/2000PFAIL
DetailsRuss Owen
###-####c/n posted. 11/1/2000 8:44:46 AM
BLD-Framing/Rough-in9/13/20009/14/20009/14/2000AFAIL
DetailsRuss Owen
JIm ###-#### reinspection
BLD-Framing/Rough-in9/13/20009/14/20009/14/2000AFAIL
DetailsRuss Owen
JIm ###-#### reinspection
BLD-Framing/Rough-in9/11/20009/12/20009/12/2000APART
DetailsRuss Owen
rein jim ###-#### call first please ok to rock allof house upper flor rear wall needs more staples nails. 9/12/2000 12:29:04 PM
BLD-Energy code compliance9/5/20009/6/20009/6/2000AFAIL
DetailsRuss Owen
jim Jensen ###-#### please call first
BLD-Energy code compliance9/1/20009/5/20009/5/2000PCANC
DetailsRuss Owen
###-####
BLD-Framing/Rough-in8/30/20008/30/20008/30/2000AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/30/2000 at 07:08:04. Contact: .C/N posted, 8/30/2000 6:54:10 PM
BLD-Framing/Rough-in8/28/20008/29/20008/29/2000PCANC
DetailsRuss Owen
call first please\\###-#### jim or ###-#### unable to do. 8/30/2000 9:06:00 AM
BLD-Framing/Rough-in8/24/20008/25/20008/25/2000PFAIL
Details
jim-- ###-#### re-insp fr c/n and 42$ reinspection fee due 8/25/2000 6:24:23 PM
BLD-Framing/Rough-in8/23/20008/23/20008/23/2000PNR
DetailsRuss Owen
###-#### Need to complete all engineering .left c/n no insp done. 8/24/2000 8:02:30 AM
Issue PAID IN FULL permit  6/14/2000 DONE
(F) Reprint permit  6/1/2000 DONE
BLD-Foundation5/15/20005/15/20005/15/2000APART
DetailsRuss Owen
Early start, no approved plans, no property pins located on right side due to the dirt mountain.
PLANS/APPL TAKEN TO FRONT DESK  5/15/2000 DONE
Inspection Record Card- Bld  5/15/2000 DONE
Telephone call  5/15/2000 DONE
left a mess that permit is ready
Plan assigned to (SAM)5/10/2000 5/15/2000 PASS
DetailsSteve Munroe
5/15/2000 12:00:08 SAM - activity updated through activity BLDA022 from case BLD00-01070.
BLD-Footing5/10/20005/10/20005/10/2000PCANC
DetailsRuss Owen
###-#### Unable to make this today. 5/12/00 9:03:43 AM
Pending Assignment by DJO4/19/2000 5/10/2000 DONE
DetailsDan Overy
BLD-Footing5/1/20005/2/20005/3/2000PFAIL
DetailsRuss Owen
###-#### No plans, not ready, setbacks unable to determine hill of dirt. 5/4/00 11:30:03 AM
Early Start Permit  4/28/2000 DONE
Routing - PUBLIC WORKS4/19/20004/19/20004/21/2000 DONE
Routing - PLANNING4/19/20004/19/20004/20/2000 DONE
Application received  4/19/2000  
Routing - PLAN CHECK4/21/20004/21/2000  PEND
Plan Reviewer's activity    PEND
5/10/00 3:50 Called and talked to the designer about the plan. I then called and left a message for the engineering to call me regarding the back wall.
5/15/00 11:00 The engineer and I finally talked about the concerns I had.
Print Pending Permit.LaserJet4     
Plan Review Report