(F) Reprint permit | | | 7/12/2001 | | DONE |
|
|
|
|
DOC - Permit Finaled | 1/25/2001 | 1/25/2001 | 1/25/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 1/25/2001 12:41:52 PM
|
BLD-Final | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/15/2000 at 16:05:29. Contact: ###-####. C. of O issued. 11/16/2000 11:40:29 AM
|
BLD-Final | 11/14/2000 | 11/15/2000 | 11/15/2000 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 15:20:36. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/3/2000 | 10/4/2000 | 10/4/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/03/2000 at 14:26:21. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/28/2000 | 9/28/2000 | 9/28/2000 | A | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 9/28/2000 Fire place approved by Heatilator distric manager for damage at the top.ok to sheetrock except for garage 6x6 post support re-insp required.
|
BLD-Framing/Rough-in | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | FAIL |
Russ Owen
|
|
|
Added by Inspector: 407 On 9/27/2000 Stop work order posted.
|
BLD-Energy code compliance | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/25/2000 at 10:54:11. Contact: ###-####.c/n posted. 9/26/2000 1:38:12 PM
|
BLD-Framing/Rough-in | 9/20/2000 | 9/21/2000 | 9/21/2000 | A | PART |
Russ Owen
|
|
|
KURT ###-#### FR-RE-INSPok to insulate,need post support in garage. 9/21/2000 10:01:10 AM
|
BLD-Framing/Rough-in | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | FAIL |
Russ Owen
|
|
|
FR INSP KURT LOVE--###-#### RE-INSP
|
BLD-Framing/Rough-in | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 15:00:56. Contact: ###-####. ele do not cover posted no insp. performed. no sticker no stop. 9/14/2000 9:24:27 AM
|
BLD-Framing/Rough-in | 9/12/2000 | 9/13/2000 | 9/13/2000 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/12/2000 at 13:04:10. Contact: ###-####.needs electrical.
9/13/2000 5:59:33 PM
|
BLD-Framing/Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 09:23:29. Contact: ###-####. Engineering ok,d can now side. 8/14/2000 12:39:31 PM
|
BLD-Framing/Rough-in | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/08/2000 at 15:56:23. Contact: ###-####. C/N posted. 8/10/2000 9:19:16 AM
|
BLD-Framing/Rough-in | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/28/2000 at 13:46:31. Contact: ###-####.
|
BLD-Foundation | 5/23/2000 | 5/23/2000 | 5/23/2000 | P | PART |
Russ Owen
|
|
|
###-#### ext 19181 Poured appears ok 5/24/00 11:10:01 AM
|
Inspection Record Card- Bld | | | 5/15/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/15/2000 | | DONE |
|
|
|
|
Telephone call | | | 5/12/2000 | | DONE |
|
|
|
left mess that permit is ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 5/11/2000 | | 5/12/2000 | | PASS |
Steve Munroe
|
|
|
5/12/2000 10:22:14 SAM - activity updated through activity BLDA022 from case BLD00-01076.
|
Pending Assignment by DJO | 4/20/2000 | | 5/11/2000 | | DONE |
Dan Overy
|
|
|
|
BLD-Footing | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | PASS |
|
|
|
###-#### late pm footing forms set and r-bar placed 5/9/00 11:10:04 AM
|
Early Start Permit | | | 5/2/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/20/2000 | 4/20/2000 | 4/21/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 4/20/2000 | 4/20/2000 | 4/20/2000 | | DONE |
|
|
|
|
Application received | | | 4/20/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 4/21/2000 | 4/21/2000 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
5/11/00 10:25 Called and talked to the designer to find out what is going on with the engineering that was submitted. He will sort out. Talked about bearing issues and many other problems in plans.
ONLY ONE SET OF PLANS IS BEING APPROVED BECAUSE OF EXCESSIVE RED-LINING. (SAM)
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Inspection Record Card- Bld | | | | | |
|
|
|
|