(F) Reprint permit | | | 8/8/2000 | | DONE |
|
|
|
|
BLD-Energy code compliance | 7/28/2000 | 8/1/2000 | 8/1/2000 | P | FAIL |
Tony Young
|
|
|
###-#### ray energy code not ready at 3:30
8/1/2000 3:35:24 PM
|
BLD-Framing/Rough-in | 7/28/2000 | 7/31/2000 | 7/31/2000 | P | FAIL |
|
|
|
###-####-roy fr called ok to insulate un affected areas 7/31/2000 2:02:51 PM
|
BLD-Framing/Rough-in | 7/21/2000 | 7/21/2000 | 7/21/2000 | P | FAIL |
|
|
|
Rick, ###-#### - early afternoon is best need fulllength framing members at the holddown straps 7/21/2000 11:43:47 AM
|
BLD-Footing | 4/21/2000 | 4/24/2000 | 4/24/2000 | A | PASS |
|
|
|
rory ###-#### madeok to pour 4/24/00 3:37:49 PM
|
BLD-Concrete | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | PASS |
|
|
|
Added by Inspector: 338 On 4/24/00 made ok to covere r-bar placed
|
Plan assigned to (DJO) | 4/21/2000 | 4/21/2000 | 4/21/2000 | | PASS |
Dan Overy
|
|
|
4/21/2000 10:06:21 DJO - activity updated through activity BLDA022 from case BLD00-01095.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/21/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/21/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/21/2000 | | DONE |
|
|
|
talked to ray gave dollar amount
|
Issue PAID IN FULL permit | | | 4/21/2000 | | DONE |
|
|
|
|
Application received | | | 4/21/2000 | | |
|
|
|
|
Plan Review Report | | | 4/21/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/21/2000 | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|