Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01112
StatusFinaled
Name STATEWIDE CONSTRUCTION
Site Address 5388 E QUARTERSAWN CT
Project Name 
Customer Number362-5575
ePlanReviewNo
Description
To construct a 4267 sq. ft. two story single family dwelling (2835 sq. ft. first floor/1432 sq. ft. second floor) with a attached 1347 sq. ft. four car garage. Per approved plans, engineering and requirement list. This is a solar protected lot. CU98-116 per Angie Brosious. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A ELEVATION CERTIFICATE IS REQUIRED BEFORE CALLING FOR A ROUGH FRAMING INSPECTION. JIM WYLLIE HAS RELEASED THE NON-BUILD IF CONSTRUCTED IN ACCORDANCE TO THE INFORMATION SUPPLIED BY QUADRANT. PC#363 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/23/20011/23/20011/23/2001PPASS
DetailsSteven Webb
###-#### Cert. of Compliance issued. 1/23/2001 12:51:46 PM
DOC - Permit Finaled1/23/20011/23/20011/23/2001PPASS
DetailsSteven Webb
Added by Inspector: 420 On 1/23/2001 12:52:15 PM
BLD-Final1/17/20011/18/20011/18/2001PFAIL
DetailsSteven Webb
cn issued; 1) Stairs & guardrails exceeds 4" spacing, 2) Address needed on building;3)Door to garage needs self-closing hinges. 1/18/2001 4:24:49 PM
BLD-Framing/Rough-in8/28/20008/29/20008/29/2000APASS
DetailsRuss Owen
stairs ###-####
Override - Parcel Holds  8/28/2000  
BLD-Framing/Rough-in8/18/20008/21/20008/21/2000AFAIL
DetailsRuss Owen
Dwayne ###-#### c/n posted. 8/21/2000 3:00:14 PM
Override - Parcel Holds  8/18/2000  
BLD-Framing/Rough-in7/18/20007/19/20007/19/2000APASS
DetailsJim Storey
shear framing ###-#### exterior and interior sheer ok 7/19/2000 10:33:26 AM
BLD-Framing/Rough-in7/18/20007/18/20007/18/2000PNR
DetailsRuss Owen
dwayne ###-#### shear wall No plans 7/19/00 10:05:22 AM
Override - Parcel Holds  7/18/2000  
Override - Parcel Holds  7/18/2000  
BLD-Foundation5/22/20005/22/20005/22/2000PFAIL
DetailsRuss Owen
###-#### WALL Not per approved plans C/N given to contractor 5/23/00 2:36:46 PM
Override - Parcel Holds  5/22/2000  
PLANS/APPL TAKEN TO FRONT DESK  5/19/2000 DONE
Inspection Record Card- Bld  5/19/2000 DONE
Override - Parcel Holds  5/19/2000  
Issue PAID IN FULL permit  5/19/2000 DONE
Plan assigned to (SAM)5/12/2000 5/19/2000 PASS
DetailsSteve Munroe
5/19/2000 14:29:22 SAM - activity updated through activity BLDA022 from case BLD00-01112.
Pending Assignment by DJO4/21/2000 5/12/2000 DONE
DetailsDan Overy
Routing - PUBLIC WORKS4/21/20004/21/20004/25/2000 DONE
Routing - PLANNING4/21/20004/21/20004/24/2000 DONE
Application received  4/21/2000  
Routing - PLAN CHECK4/25/20004/25/2000  PEND
Plan Reviewer's activity    PEND
5/16/00 14:20 Called and left a message for Mike Brown, the engineer, to call me and answer a couple of questions.
5/17/00 8:36 Mike Brown called me back and answered my questions.
Case Summary (BLD)     
Plan Review Report     
Plan Reviewer's activity    PEND
Plan review is mostly done. I am waiting for Jim Wyllie to release the lot.