Fee Review-notes | 4/24/2000 | 4/24/2000 | 4/11/2001 | | DONE |
|
|
|
|
BLD-Final | 11/13/2000 | 11/14/2000 | 11/14/2000 | P | PASS |
Tom Arcoraci
|
|
|
brian ###-#### ok for perm occ if achd signs perm 11/14/2000 1:35:04 PM
|
Permanent Occupancy | | 11/14/2000 | 11/14/2000 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 11/14/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8465 issued 11-14-00 to the Ustick Elementary School kitchen addn.
|
PubWorks Occupancy Approval | 11/13/2000 | 11/13/2000 | 11/13/2000 | | DONE |
|
|
|
Signed Permanent Occupancy 11/13/00. R.Rokovitz
|
FIRE-Final Inspection | 11/10/2000 | 11/13/2000 | 11/13/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 14:53:57. Contact: ###-####.
|
Code Occupancy Approval | | | 11/13/2000 | | PASS |
|
|
|
ALL CONDITIONS HAVE BEEN MET UNDER DRH00-00024, FINAL OCCUPANCY SIGNED OFF.
|
FIRE-Final Inspection | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | FAIL |
Joe Tawney
|
|
|
###-####. Final Fail C/N issued 11/14/2000 7:55:06 AM
|
FIRE-Final Inspection | 11/7/2000 | 11/8/2000 | 11/8/2000 | A | CANC |
Joe Tawney
|
|
|
###-####. Cancel Not ready 11/8/2000 12:28:05 PM
|
BLD-Final | 11/7/2000 | 11/8/2000 | 11/8/2000 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/07/2000 at 12:35:37. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/08/2000 at 07:59:54.
|
BLD-Framing/Rough-in | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 10/26/2000 ceiling grid
air disffusers not in and ties @ 8" around perimeter still not in 10/26/2000 3:06:03 PM
|
BLD-Other | 10/24/2000 | 10/25/2000 | 10/25/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/24/2000 at 10:04:48. Contact: ###-####.
need to tie ceiling grid around perimeter at 8 " 10/25/2000 4:12:56 PM
|
BLD-Framing/Rough-in | 9/29/2000 | 9/29/2000 | 9/29/2000 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/29/2000
|
BLD-Energy code compliance | 9/29/2000 | 9/29/2000 | 9/29/2000 | P | PASS |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/29/2000
|
BLD-Framing/Rough-in | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | FAIL |
Tony Young
|
|
|
BRIAN ###-#### FR
c/n posted, holddowns, firewall sealing, and blocking 9/27/2000 3:17:22 PM
|
BLD-Framing/Rough-in | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 07:59:47. Contact: ###-####.
east nailing on front ok 9/20/2000 3:33:29 PM
|
BLD-Other | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 08:01:28. Contact: ###-####.
masonary bond beam,, top layer 9/20/2000 3:34:22 PM
|
BLD-Framing/Rough-in | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 10:36:17. Contact: ###-####.
C/N POSTED 9/19/2000 11:11:04 AM
|
BLD-Framing/Rough-in | 9/19/2000 | 9/19/2000 | 9/19/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/19/2000 SHEAR WALL NAILING
NAILING PATTERN ON EXTERIOR WALLS OK,, AND ROOF NAILING OK,,, STILL WORKING ON HOLD DOWNS, TO BE VERIFIED AT FRAMING. 9/19/2000 3:16:42 PM
|
BLD-Concrete | 9/19/2000 | 9/19/2000 | 9/19/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/19/2000 MASONARY WALLS
OK ,,, REBAR OK ,,, GROUT IS 7 BAG MIX,, OK TO GROUT FIRST 4 FT. IN COOLER AND TRASH ENCLOSER 9/19/2000 3:14:00 PM
|
BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 | P | PART |
Tony Young
|
|
|
BRIAN-- ###-#### SHEAR WALL
ok to put 5/8" on shear wall on west side 9/11/2000 5:14:56 PM
|
BLD-Foundation | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 13:28:59. Contact: ###-####.
wip on interior footing , and engineer fix on outside bearing wall and outside colums (part change in plans back to original plan) 8/25/2000 11:49:23 AM
|
BLD-Conference | 8/15/2000 | 8/15/2000 | 8/15/2000 | A | PASS |
Tony Young
|
|
|
Reviewed and approved structural modificactions to roof assembly provided by Pinnacle Engineering. CN issued for changes to be attached to approved plans.
done by Bob A. 8/18/2000 2:49:26 PM
|
BLD-Conference | 8/11/2000 | 8/11/2000 | 8/11/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/11/2000 at 07:04:57. Contact: ###-####.
conference on roof change, will submit changes to plan review. 8/11/2000 11:04:54 AM
|
BLD-Foundation | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 16:09:49. Contact: ###-####.
wip 8/4/2000 11:31:40 AM
|
BLD-Footing | 8/2/2000 | 8/3/2000 | 8/3/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/02/2000 at 16:28:47. Contact: ###-####.
|
BLD-Footing | 8/1/2000 | 8/2/2000 | 8/2/2000 | P | PART |
Tony Young
|
|
|
BRIAN--###-#### CELL FT
w.i.p. appears ok, will call back in 8/2/2000 3:44:57 PM
|
(F) Reprint permit | | | 6/16/2000 | | DONE |
|
|
|
|
Routing Off Site - A.C.H.D | 6/15/2000 | 6/15/2000 | 6/15/2000 | | DONE |
|
|
|
per letter from Jeff Lowe a credit of 7,497.00 exist on this project june 9, 2000 letter dated
|
Issue PAID IN FULL permit | | | 6/15/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/15/2000 | | DONE |
|
|
|
talked to john cartwright to verify plans are ready-also need something from a.c.h.c.
|
Plan assigned to (JCM) | 4/27/2000 | 4/27/2000 | 6/14/2000 | | PASS |
John Menard
|
|
|
6/14/00 14:30:57 JCM - activity updated through activity BLDA022 from case BLD00-01120.
|
Routing - PUBLIC WORKS | 6/13/2000 | | 6/14/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/14/2000 | | 6/14/2000 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/2000 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/14/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/14/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/9/2000 | | 6/13/2000 | | |
|
|
|
|
Routing - FIRE | 6/7/2000 | 6/9/2000 | 6/9/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Reviewer's activity | | | 6/7/2000 | | PASS |
|
|
|
REVIEWED AND APPROVED RESUBMITTALS. JCM
|
Plan resubmittals received | | | 6/5/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A0, A1, A2, A5, A6, A7, A8, A9, A10, A12. ONE COPY OF PLAN REVIEW COMMENTS RESPONSE. ONE COPY OF LA HABRA WALL ARCH. GUIDE. ONE COPY OF ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM NO. 1. ROUTED TO JOHN M. KMM
|
Routing - PUBLIC WORKS | 5/23/2000 | | 5/24/2000 | | FAIL |
|
|
|
REQUIRES STREET LIGHT PLAN PER BILL COLSON
REQUIRES DRAINAGE PLAN AND WORK CROSSES PROPERTY LINE PER BRIAN MURPHY. 5/24/00 DAR
|
Routing - FIRE | 5/18/2000 | 5/23/2000 | 5/23/2000 | | FAIL |
Bill Alexander
|
|
|
Lack hydrant and flows
|
Plan Review Completed(1st rev) | | | 5/23/2000 | | FAIL |
Bill Alexander
|
|
|
|
Plan resubmittals requested | | | 5/18/2000 | | PEND |
|
|
|
MAILED MARK KNOWLES A COPY OF THE COMMENT LIST REQUESTING REVISIONS. JCM
|
Routing - PLAN CHECK | 5/15/2000 | | 5/18/2000 | | PEND |
|
|
|
|
Routing - PLUMBING | 5/10/2000 | | 5/15/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 5/2/2000 | | 5/10/2000 | | PASS |
|
|
|
Approved per revised site/landscape plan submitted 5/10/00. DRH00-24
|
Routing - PUBLIC WORKS | 4/27/2000 | | 5/2/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN PER BRIAN MURPHY. WORK CROSSES PROPERTY LINES. 5/2/00 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 4/27/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 4/27/2000 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/27/2000 | | DONE |
|
|
|
|
Application received | | | 4/24/2000 | | |
|
|
|
|
Pending Assignment by MYS | 4/24/2000 | | | | |
Marlene Southard
|
|
|
|