BLD-Final | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | PASS |
Tony Young
|
|
|
Matt ###-####l.c.#19868 issued 3/28/2001 1:50:46 PM
|
BLD-Grading Inspection | 3/28/2001 | 3/28/2001 | 3/28/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
DOC - Permit Finaled | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PASS |
Tony Young
|
|
|
Added by Inspector: 415 On 3/28/2001 1:51:06 PM
|
BLD-Final | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | FAIL |
Tony Young
|
|
|
###-####
need trades signed off, grade finished, landscape etc. 3/27/2001 1:58:24 PM
|
BLD-Conference | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PASS |
Tony Young
|
|
|
###-####
handrails w/in the house 3/12/2001 12:16:04 PM
|
BLD-Conference | 2/26/2001 | 2/27/2001 | 2/27/2001 | P | PASS |
Tony Young
|
|
|
Matt ###-####
gaurd rails 2/28/2001 8:11:55 AM
|
BLD-Other | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PASS |
Tom Arcoraci
|
|
|
shear drywall inspection ###-#### drywall nailing ok 12/7/2000 2:09:51 PM
|
BLD-Energy code compliance | 12/1/2000 | 12/4/2000 | 12/4/2000 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/30/2000 | 12/1/2000 | 12/1/2000 | A | PASS |
Steven Webb
|
|
|
FR INSP MATT- ###-#### ok to insulate 12/1/2000 10:13:43 AM
|
BLD-Framing/Rough-in | 11/29/2000 | 11/30/2000 | 11/30/2000 | A | FAIL |
Tony Young
|
|
|
Matt ###-####
c/n posted 11/30/2000 12:01:34 PM
|
BLD-Conference | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Steven Webb
|
|
|
###-#### Matt
|
BLD-Framing/Rough-in | 11/3/2000 | 11/6/2000 | 11/6/2000 | A | PART |
Tony Young
|
|
|
Matt ###-####
exterior shear ok, verify interior later 11/6/2000 11:57:45 AM
|
BLD-Framing/Rough-in | 11/1/2000 | 11/2/2000 | 11/2/2000 | A | FAIL |
Tony Young
|
|
|
shear wall Matt ###-####
met w/ steve and bob, c/n posted, cut out
o. s. b. and nail holddowns and add studs per plans, renail panels per plan. check line d-1 wall and interior shear walls later. 11/2/2000 11:40:32 AM
|
BLD-Framing/Rough-in | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | FAIL |
Tony Young
|
|
|
shear Matt ###-####
c/n posted , need eng. letter on straps and shear 11/1/2000 2:51:09 PM
|
BLD-Framing/Rough-in | 11/1/2000 | 11/1/2000 | 11/1/2000 | A | CANC |
Tony Young
|
|
|
SHEAR WALL ###-#### MATT
|
BLD-Footing | 9/26/2000 | 9/27/2000 | 9/27/2000 | A | PART |
Tony Young
|
|
|
Todd ###-####
9/27/2000 12:51:57 PM
|
BLD-Footing | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | NR |
Tony Young
|
|
|
FT TODD ###-####
need compaction rpt. 9/26/2000 11:33:40 AM
|
BLD-Footing | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PART |
Tony Young
|
|
|
Todd ###-####
stair step retaining wall,,,work in progress appears ok 9/15/2000 11:35:27 AM
|
BLD-Footing | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PART |
Tony Young
|
|
|
Todd ###-####
need letter on soils on front retaining walls on fill and drain material 8/30/2000 2:29:54 PM
|
BLD-Footing | 8/29/2000 | 8/29/2000 | 8/29/2000 | P | CANC |
Tony Young
|
|
|
###-####
|
BLD-Foundation | 8/8/2000 | 8/9/2000 | 8/9/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 8/8/2000 todd 371 7800
WIP appears ok 8/9/2000 4:20:02 PM
|
BLD-Foundation | 8/7/2000 | 8/8/2000 | 8/8/2000 | P | PART |
Tony Young
|
|
|
Todd ###-####
|
BLD-Footing | 7/24/2000 | 7/25/2000 | 7/25/2000 | P | PART |
Tony Young
|
|
|
###-####-todd ft
|
BLD-Footing | 7/21/2000 | 7/24/2000 | 7/24/2000 | P | FAIL |
Tony Young
|
|
|
todd--###-#### ft Not ready chech depth on point load 14" 7/25/00 9:35:39 AM
|
Issue PAID IN FULL permit | | | 6/12/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 6/8/2000 | 6/8/2000 | 6/9/2000 | | PASS |
Dan Overy
|
|
|
6/9/2000 08:57:56 DJO - activity updated through activity BLDA022 from case BLD00-01180.
|
Plan Reviewer's activity | | | 6/9/2000 | | DONE |
|
|
|
received info on dumb-waiter shaft. will issue permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/9/2000 | | DONE |
|
|
|
left mess that permit is ready
|
Plan Review Report | | | 6/8/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/8/2000 | | DONE |
|
|
|
have received addendum from engineer addressing holdown schedule. am waiting for section on seperation at dumb-waiter.
|
Plans ACCEPTED BY PLAN CHECK | | | 6/7/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/7/2000 | | DONE |
|
|
|
CALLED BRIGGS ENGINEERING FOR ADDITIONAL INFORMATION. WILL DISCUSS 6-8-00 AT 10:00 A.M.
|
Routing - PUBLIC WORKS | 4/27/2000 | 4/27/2000 | 6/1/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 4/27/2000 | 4/27/2000 | 5/31/2000 | | PASS |
Rita DeYoung
|
|
|
TOOK TO TERRY RECORDS 4/27/00 HE IS WAITING FOR GRADING PLAN JOHN IS BRINGING IT IN
Failed because there is nearly a 10 foot high retaining wall within the front setback. Let applicant know by a phone call that the wall can't be higher than 3 feet within the front setback.
approved as Category 3 on 5/31/00. Grading was revised so that retaining wall is less than 3 feet high.
|
Application received | | | 4/27/2000 | | |
|
|
|
|
Routing - PLANNING | 6/1/2000 | 6/1/2000 | | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/1/2000 | 6/1/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 4/27/2000 | | | | PEND |
Dan Overy
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|