BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PASS |
Jim Storey
|
|
|
CARL ###-####
|
DOC - Permit Finaled | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 1/29/2002 2:46:21 PM
|
BLD-Framing/Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 | P | NR |
Steven Webb
|
|
|
Carl ###-#### carl call 3/26 2001 and made a appointment w/301 to be there for insp. at 4:30 pm / I added this note if insp. is trans. to someone else. 3/27/2001 10:53:23 AM
|
BLD-Final | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PART |
Jim Storey
|
|
|
PLEASE FINAL FOR THE FOUNDATION AND THE BEAM DOWN THE CENTER ONLY FOR CONTRACTOR STEVE BAKER ###-####foundation only ok 10/20/2000 4:58:32 PM
|
BLD-Final | 10/2/2000 | 10/2/2000 | 10/2/2000 | P | PART |
Russ Owen
|
|
|
###-####. Need bottom post base ,or provide detail from project engineer. 10/3/2000 8:44:08 AM
|
BLD-Final | 9/22/2000 | 9/25/2000 | 9/25/2000 | A | FAIL |
Jim Storey
|
|
|
Steve ###-#### need weld conections at beam and base plate. 9/25/2000 10:30:37 AM
|
BLD-Foundation | 6/22/2000 | 6/23/2000 | 6/23/2000 | A | PART |
Jim Storey
|
|
|
re-bar Steve Baker ###-#### work in progess appears to be ok. 6/23/00 9:33:41 AM
|
Override - Parcel Holds | | | 6/22/2000 | | |
|
|
|
|
BLD-Footing | 6/1/2000 | 6/1/2000 | 6/1/2000 | P | PASS |
Jim Storey
|
|
|
STEVE BAKER-- ###-#### FT
|
Override - Parcel Holds | | | 6/1/2000 | | |
|
|
|
|
BLD-Footing | 5/26/2000 | 5/30/2000 | 5/30/2000 | P | FAIL |
Jim Storey
|
|
|
###-####
|
BLD-Footing | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | CANC |
Tom Arcoraci
|
|
|
steve baker---###-####
|
Override - Parcel Holds | | | 5/26/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 5/25/2000 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/25/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/1/2000 | | |
|
|
|
|
(F) Reprint permit | | | 5/1/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/1/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 5/1/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/1/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 4/28/2000 | 4/28/2000 | 4/28/2000 | | PASS |
Dan Overy
|
|
|
4/28/2000 11:37:23 DJO - activity updated through activity BLDA022 from case BLD00-01186.
|
Plan Reviewer's activity | | | 4/28/2000 | | DONE |
|
|
|
WORK PREVIOUSLY PERMITTED UNDER BLD00-00464. DUE TO LEGAL CONFLICTS BETWEEN EXISTING CONTRACTOR AND OWNER, A DIFFERENT CONTRACTOR HAS BID WORK. SCOPE OF CONSTRUCTION FOR UNFINISHED BASEMENT/STAIRS ONLY. SEPERATE PEMITS REQ. TO FINISH.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/28/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/28/2000 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/28/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/28/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/28/2000 | | DONE |
|
|
|
|
Telephone call | | | 4/28/2000 | | DONE |
|
|
|
called gave dollar amount
|
Application received | | | 4/28/2000 | | |
|
|
|
|
Plan Review Report | | | 4/28/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/28/2000 | | |
|
|
|
|