BLD-Final | 11/13/2000 | 11/14/2000 | 11/14/2000 | A | FAIL |
Dave Hannah
|
|
|
FN OCC WILLIAM ###-####
|
BLD-Final | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 10:49:30. Contact: .
|
BLD-Final | 11/14/2000 | 11/14/2000 | 11/14/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Grading Inspection | 11/13/2000 | 11/13/2000 | 11/13/2000 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
BLD-Framing/Rough-in | 9/22/2000 | 9/25/2000 | 9/25/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/22/2000 at 13:30:13. Contact: ###-####. reinspection
|
BLD-Energy code compliance | 9/22/2000 | 9/25/2000 | 9/25/2000 | P | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 9/20/2000 | 9/21/2000 | 9/21/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N Issued 9/21/2000 11:13:25 AM
|
BLD-Framing/Rough-in | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | NR |
Tony Young
|
|
|
shear wall William ###-####
|
BLD-Framing/Rough-in | 9/12/2000 | 9/12/2000 | 9/12/2000 | P | PART |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 9/12/2000 shear nail
ext. inspection only,, verify interior retrofit hold downs in s/e corner bedroom x 3 and 2 in n/w corner of garage at framing inspection. part of front was part sided, verified hold downs,, ok 9/12/2000 3:07:41 PM
|
BLD-Foundation | 6/28/2000 | 6/30/2000 | 6/30/2000 | A | PART |
Tony Young
|
|
|
William ###-#### work in progress appears ok 7/3/00 8:32:54 AM
|
BLD-Footing | 6/20/2000 | 6/21/2000 | 6/21/2000 | A | PART |
Tony Young
|
|
|
###-####\\ Work in progress appears ok with verbal corrections. 6/21/00 4:51:16 PM
|
Issue PAID IN FULL permit | | | 6/2/2000 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 6/1/2000 | 6/1/2000 | 6/1/2000 | | PASS |
Dan Overy
|
|
|
6/1/2000 13:45:49 DJO - activity updated through activity BLDA022 from case BLD00-01234.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2000 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/1/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2000 | | DONE |
|
|
|
|
Plan Review Report | | | 6/1/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 6/1/2000 | | |
|
|
|
|
Routing - PLANNING | 5/19/2000 | 5/19/2000 | 5/19/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 5/3/2000 | 5/3/2000 | 5/19/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 5/3/2000 | 5/3/2000 | 5/4/2000 | | PASS |
Rita DeYoung
|
|
|
grading rejected because the driveway is unacceptably steep. The plan indicates a 20% grade within 4 feet of the garage doors.
Revised grading approved with conditions in letter attached to plans.
|
Application received | | | 5/3/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 5/19/2000 | 5/19/2000 | | | PEND |
|
|
|
|
Office Staff conference/action | | | | | PEND |
|
|
|
early start voided was issued 5/23/00 this is hillside no early start.pe i left message for william bell to call he as a mis permit ready for the grading.pe mis00-00138
|
Pending Assignment by DJO | 5/3/2000 | | | | PEND |
Dan Overy
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|