Case Summary (BLD) | | | 1/27/2009 | | |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 12/15/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #4065 issued 12-15-00 to the Saffron Restaurant.
|
Permanent Occupancy | | 11/28/2000 | 11/28/2000 | | DONE |
|
|
|
|
Fee Review-notes | 5/3/2000 | 5/3/2000 | 10/24/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/18/2000 | 10/20/2000 | 10/23/2000 | P | PART |
Rick Jackson
|
|
|
FIRE FN TIM-- ###-#### need sign at FDC for all addresses covered by the sprinkler system 10/23/2000 10:51:52 AM
|
Temporary occupancy | | | 10/23/2000 | | PART |
|
|
|
Temp. Occ. cert. #4065 issued 10-23-00 to the Saffron Restaurant.
|
BLD-Final | 10/19/2000 | 10/20/2000 | 10/20/2000 | P | PART |
Jim Storey
|
|
|
tim ###-#### need fire retardent lable on curtian above grill area when installed/ tenp ok upon fire sign off. 10/20/2000 5:23:52 PM
|
FIRE-Final Inspection | 10/5/2000 | 10/6/2000 | 10/6/2000 | A | FAIL |
Rick Jackson
|
|
|
###-#### tested kicthen extinguishing system - okay; need occupant load sign; need alarm plans and test; need map for FACP and sprinkler location 10/6/2000 3:46:10 PM
|
BLD-Conference | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | PASS |
Jim Storey
|
|
|
FOR CONF-- LARRY ###-####
|
BLD-Framing/Rough-in | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PART |
|
|
|
Larry; ###-#### 4-part connection of the 6" studs to the tracks okt o install hoon at the front location 9/5/2000 10:38:12 AM
|
FIRE-Conference | 8/31/2000 | 9/1/2000 | 9/1/2000 | A | PART |
Rick Jackson
|
|
|
LARRY SMITH-- CELL ###-#### FOR CONF discussed duct detector placement; fire extinguisher placement; alarm system 9/1/2000 10:40:18 AM
|
BLD-Footing | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | PASS |
|
|
|
###-#### made ok to pour. r-bar placed 7/12/00 8:40:59 AM
|
BLD-Footing | 7/3/2000 | 7/5/2000 | 7/5/2000 | P | PASS |
|
|
|
###-#### r-b 7/5/00 1:18:48 PM ###-#### r-bar islacd ok to pour 2nd lift also 7/5/00 1:18:48 PM 7/5/00 1:19:22 PM
|
BLD-Conference | 6/29/2000 | 6/29/2000 | 6/29/2000 | P | PART |
|
|
|
larry smith ###-#### pre consp meeting with super and 409, expecting shaftwall assy 6/30/00 10:07:13 AM
|
Plan resubmittals received | | | 6/26/2000 | | DONE |
|
|
|
RECEIVED ONE COPY OF REVISED DRAWINGS a0.01, a2.11, a2.31, a3.21, a4.11, a5.11, a6.11, f2.11, s2.11, m1.00, m2.00, p1.00, p2.00, fp1.00, e2.0f, 32.01, e2.0p, e2.1r, e3.0. ONE COPY OF CCD - 1 CCD - 2 CCD - 3. ROUTED TO CARL W. ONE COPY OF MECH. ELECT. PROJECT MANUAL. KMM
|
Issue PAID IN FULL permit | | | 6/23/2000 | | DONE |
|
|
|
|
Routing - PLUMBING | 6/13/2000 | | 6/21/2000 | | PASS |
|
|
|
big dipper to be installed on WOK drainage, if an automatic soap dispensor is installed at the mop sink provide a water supply for it, all floor sinks to be out from under cabinets.
|
Routing - PUBLIC WORKS | 6/21/2000 | | 6/21/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/21/2000 | | 6/21/2000 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2000 | | PASS |
|
|
|
|
Print Occupancy Form | | | 6/21/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/21/2000 | | DONE |
|
|
|
talked to Andy and than left message w/ tim gave dollar amount
|
Plan assigned to (CJW) | 5/5/2000 | | 6/21/2000 | | PASS |
Carl Westfall
|
|
|
6/21/00 14:55:52 CJW - activity updated through activity BLDA022 from case BLD00-01255.
|
Routing - PUBLIC WORKS | 6/9/2000 | | 6/13/2000 | | |
|
|
|
|
Plan resubmittals received | | | 6/9/2000 | | DONE |
|
|
|
RECEIVED ADDITIONAL COPIES OF REVISED SHEETS A2.11, A6.11 P1.00, P2.00 ROUTED TO CARL W.
|
Routing - PLAN CHECK | 5/24/2000 | | 6/9/2000 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
Plan Reviewer's activity | | | 6/9/2000 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
Plan resubmittals received | | | 6/8/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED SHEETS A2.11, A6.11, P1.00, P2.00. ONE COPY OF CIVIL DRAWINGS, 1.2, 1.3, 1.4. ONE COPY OF RESPONSE LETTER. ROUTED TO CARL W. KMM
|
Routing - FIRE | 5/19/2000 | 5/23/2000 | 5/23/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 5/23/2000 | | |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 5/15/2000 | | 5/19/2000 | | |
|
|
|
Drawings failed first review.
|
Plan Reviewer's activity | | | 5/17/2000 | | |
|
|
|
UBC plan review started May 17, 2000 and finished May 19, 2000. A response from the architect is required. See the conditions list.
|
Routing - PLUMBING | 5/12/2000 | | 5/15/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 5/8/2000 | | 5/12/2000 | | |
|
|
|
WOK TO HAVE DRAINAGE TO INTERCEPTOR. SEPARATE DEDICATED 1500 GREASE INTERCEPTOR REQUIRED PER WALT BAUMGARTNER. 5/12/00 DAR
|
Pending Assignment by MYS | 5/3/2000 | | 5/5/2000 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 5/5/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 5/4/2000 | | DONE |
|
|
|
|
Received Certificate of Value | | | 5/3/2000 | | DONE |
|
|
|
|
Application received | | | 5/3/2000 | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|