Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01261
StatusFinaled
Name 5B INVESTMENTS INC ETAL
Site Address 1025 E EXCHANGE ST
Project NameCLEARWATER TECH.
Customer Number 
ePlanReviewNo
Description
CLEARWATER TECHNOLOGIES * TO CONSTRUCT A NEW 7828 SQ. FT., ONE STORY, WOOD AND STEEL FRAMED OFFICE AND WARHOUSE BUILDING AND RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH99-00255/PC#333-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/27/20014/30/20014/30/2001PPASS
DetailsJim Storey
###-####
Permanent Occupancy 4/30/20014/30/2001 DONE
Details
Permanent occupancy  4/30/2001 DONE
Perm. Occ. Cert. #865 issued 4-30-01 to J G T Architecture.
Code Occupancy Approval  4/27/2001 PASS
ALL CONDITIONS HAVE BEEN MET, FINAL SIGNED OFF.
Fee Review-notes5/4/20005/4/20004/25/2001 DONE
PubWorks Occupancy Approval2/23/20012/23/20012/23/2001 DONE
Signed Permanent Occupancy 02/23/01. R.Cummings
BLD-Final2/22/20012/23/20012/23/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/22/2001 at 14:55:02. Contact: ###-####. temp ok pending p&z sign off need reinsp for ada parking space. 2/23/2001 3:34:42 PM
Temporary occupancy  2/23/2001 PART
Temp. Occ. Cert. #4519 issued 2-23-01 to Clearwater Technologies.
BLD-Conference2/21/20012/22/20012/22/2001ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/21/2001 at 15:49:02. Contact: ###-####.
FIRE-Final Inspection2/21/20012/22/20012/22/2001PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/21/2001 at 16:01:57. Contact: ###-####.
Code Occupancy Approval  2/22/2001 FAIL
NO LAND SCAPE IN PLACE, PARKING LOT IN BUT NOT STRIPPED, BOND POSTED FOR $16,000+ FOR UNCOMPLETED ITEMS. TEMPORARY OCCUPANCY SIGNED OFF.
FIRE-Final Inspection2/19/20012/20/20012/20/2001PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/19/2001 at 07:44:48. Contact: ###-####. exits blocked by scaffolding; remote LED's for AHU detectors; address 2/20/2001 4:24:15 PM
BLD-Framing/Rough-in2/5/20012/5/20012/5/2001PPASS
DetailsJim Storey
###-#### ceilling ok for cover. 2/6/2001 8:57:24 AM
BLD-Framing/Rough-in1/18/20011/18/20011/18/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/18/2001 at 07:16:10. Contact: ###-####. 1# df 4 x 12 beam material on site to instal at store front and steel brace to verify assembly at ceilling grid insp. 1/18/2001 9:54:27 AM
BLD-Framing/Rough-in1/5/20011/8/20011/8/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/05/2001 at 16:03:02. Contact: ###-####. GROUT OK UNDER COLUMS/ 1/8/2001 10:30:10 AM
BLD-Framing/Rough-in1/8/20011/8/20011/8/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/08/2001 at 07:08:52. Contact: ###-####. ENTRY SOFFIT OK FOR COVER 1/8/2001 10:29:51 AM
BLD-Framing/Rough-in12/29/20001/2/20011/2/2001ANH
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2000 at 17:21:38. Contact: ###-####. no access to canopy framing. 1/2/2001 11:12:25 AM
BLD-Framing/Rough-in12/28/200012/29/200012/29/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/28/2000 at 12:33:07. Contact: ###-####. sheer weld plates ok for cover./ c/n for entry sofit pending insp. 12/29/2000 4:59:49 PM
BLD-Framing/Rough-in12/27/200012/28/200012/28/2000ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/27/2000 at 16:39:41. Contact: ###-####.
BLD-Framing/Rough-in12/26/200012/27/200012/27/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2000 at 10:51:02. Contact: ###-####. hold downs insp and in place special insp. feild report aproved for embedment length of rod and king stud atchment per listing of holddowns.other idems on c/n out standing. 12/27/2000 3:04:47 PM
BLD-Framing/Rough-in12/19/200012/20/200012/20/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2000 at 08:23:55. Contact: ###-####. interior sheer ok for cover soffit framing and raffter hangers pending re insp. 12/20/2000 1:50:14 PM
BLD-Framing/Rough-in12/14/200012/15/200012/15/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/2000 at 15:47:48. Contact: ###-####. need hold downs and sheer walls complet interior/hangers at beam not nailled/ front soffit framing missing screws at joints. 12/15/2000 1:19:49 PM
BLD-Framing/Rough-in12/5/200012/6/200012/6/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/05/2000 at 15:59:54. Contact: ###-####. drag st straps in place ok screws at top track ok 12/6/2000 3:51:32 PM
BLD-Framing/Rough-in11/30/200012/1/200012/1/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/30/2000 at 12:01:23. Contact: ###-####. south wall sheathing missing top roof line screw atchment/ stud atchment at 4x4 steel colum. only south wall insp./missing top channal to wood plate 2@ 12 oc # 10 screws. 12/1/2000 9:27:00 AM
BLD-Concrete11/10/200011/13/200011/13/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/10/2000 at 13:09:01. Contact: ###-####. CANCEL PER RICH JUDY
BLD-Footing10/31/200011/1/200011/1/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/31/2000 at 08:05:05. Contact: ###-####. tar papper in place for isolation of footting center of bldg. ok. 11/1/2000 9:19:11 AM
BLD-Footing10/26/200010/27/200010/27/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/26/2000 at 09:25:13. Contact: ###-####. pad ft ok. 10/27/2000 5:29:19 PM
BLD-Footing10/25/200010/26/200010/26/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/25/2000 at 13:52:37. Contact: ###-####.
BLD-Foundation10/19/200010/20/200010/20/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/19/2000 at 16:24:52. Contact: ###-####. trans to tom a. via phone. 10/20/2000 4:49:04 PM
BLD-Foundation10/20/200010/20/200010/20/2000PPASS
DetailsTom Arcoraci
Added by Inspector: 408 On 10/20/2000 ok 10/20/2000 4:06:57 PM
BLD-Foundation10/18/200010/19/200010/19/2000PPART
DetailsJim Storey
stem wall Rich ###-#### east half of bldg. ok for steim wall. 10/19/2000 2:35:42 PM
BLD-Footing10/17/200010/17/200010/17/2000PPASS
DetailsJim Storey
REBAR INSP -###-#### OFFICE RICH footting ok 10/17/2000 3:21:02 PM
(F) Reprint permit  10/3/2000 DONE
Issue PAID IN FULL permit  9/29/2000 DONE
Office Staff conference/action  9/13/2000 DONE
doug will be in next week
Telephone call  8/31/2000 DONE
called talked to greg will call him in Oct. to find out about funding
Print Occupancy Form  6/9/2000 DONE
Telephone call  6/9/2000 DONE
left mess that permit is ready
Plan assigned to (JCM)5/5/20005/5/20006/8/2000 PASS
DetailsJohn Menard
6/8/00 14:56:21 JCM - activity updated through activity BLDA022 from case BLD00-01261.
Routing - PUBLIC WORKS6/5/2000 6/8/2000 PASS
Routing - PLAN CHECK6/8/2000 6/8/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/8/2000 PASS
Routing - PLAN CHECK5/30/2000 6/5/2000 PEND
Plan Reviewer's activity  6/5/2000 PASS
REVIEWED AND APPROVED RESUBMITTAL. JCM
Routing - FIRE5/23/2000 5/30/2000 PASS
Plan Review Completed(1st rev)  5/30/2000 PASS
Plan resubmittals received  5/26/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM JGT ARCHITECTS,GREG TOLSON, TWO SETS OF SHEETS A-2.0,A-3.0, A-4.1.AND A-6.0. FORWARDED TO JOHN MENARD. 5/26/00 DAR
Routing - PLAN CHECK5/19/2000 5/23/2000 PEND
Plan resubmittals requested  5/23/2000 PEND
MAILED THE ARCHITECT A COMMENT LIST REQUESTING REVISIONS. JCM
Routing - PLUMBING5/17/2000 5/19/2000 DONE
Routing - PLANNING5/11/2000 5/17/2000 DONE
approved per DRH00-26.
Routing - PUBLIC WORKS5/5/2000 5/11/2000 FAIL
REQUIRES DRAINAGE PLAN REVISION PER BRIAN MURPHY. 5/11/00 DAR
Plan routing begun/NEW & ADDTN  5/5/2000 DONE
Plans ACCEPTED BY PLAN TECH  5/5/2000 DONE
Received Certificate of Value  5/4/2000 DONE
Application received  5/4/2000  
Pending Assignment by MYS5/4/2000    
DetailsMarlene Southard
Recd Pcfee & Taken To Pln CK     
Inspection Record Card- Bld