BLD-Final | 10/19/2000 | 10/19/2000 | 10/19/2000 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Energy code compliance | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | PASS |
Jim Sly
|
|
|
Emmett ###-#### frame pass 8/18/2000 10:18:31 AM
|
BLD-Framing/Rough-in | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | PASS |
Jim Sly
|
|
|
###-####- EMMETT FR
|
BLD-Framing/Rough-in | 7/19/2000 | 7/19/2000 | 7/19/2000 | P | PART |
Jim Sly
|
|
|
Lorin ###-#### shear insp Shear ok 7/20/00 9:33:00 AM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 | P | FAIL |
Jim Sly
|
|
|
for lorin--###-####--re-insp --shear wall C/N..Need letter form Eng to OK 16" shear panels at Gar fronts. 7/18/00 1:31:35 PM
|
BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | FAIL |
Carl Dependahl
|
|
|
lorin-- ###-#### shear wall shear: C/N nailing, blocking @ rear tall wall. 7/18/00 2:10:41 PM
|
BLD-Framing/Rough-in | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | NR |
Jim Storey
|
|
|
emmett ###-#### shear wall insp
|
BLD-Framing/Rough-in | 6/2/2000 | 6/5/2000 | 6/5/2000 | A | FAIL |
Jim Sly
|
|
|
shear wall--###-####-bill NR 6/6/00 11:37:32 AM
|
BLD-Footing | 6/1/2000 | 6/2/2000 | 6/2/2000 | A | PART |
Jim Sly
|
|
|
Bill ###-#### Footing for garage not complete- 10 am. 6/5/00 10:55:43 AM
|
BLD-Foundation | 5/25/2000 | 5/25/2000 | 5/25/2000 | P | PART |
Jim Sly
|
|
|
###-#### ready at 2 Bsmt. walls appear ok rebar 2' O.C. horiz/vert. 5/26/00 12:17:10 PM
|
BLD-Footing | 5/19/2000 | 5/22/2000 | 5/22/2000 | A | PART |
Jim Sly
|
|
|
###-#### Footing for bsmt. only 5/23/00 2:24:19 PM
|
Issue & PRINT FEE-DUE permit | | | 5/19/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2000 | | DONE |
|
|
|
|
Telephone call | | | 5/18/2000 | | DONE |
|
|
|
left mess that permit is ready
|
Pending Assignment by DJO | 5/4/2000 | | 5/18/2000 | | DONE |
Dan Overy
|
|
|
|
Plan assigned to (SAM) | 5/18/2000 | | 5/18/2000 | | PASS |
Steve Munroe
|
|
|
5/18/2000 12:05:54 SAM - activity updated through activity BLDA022 from case BLD00-01265.
|
Routing - PUBLIC WORKS | 5/4/2000 | 5/4/2000 | 5/8/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 5/4/2000 | 5/4/2000 | 5/5/2000 | | DONE |
|
|
|
|
Application received | | | 5/4/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 5/8/2000 | 5/8/2000 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
5/18/00 11:26 Called and talked to John Mortin, Briggs Engineering, and discussed C2 and rear wall lateral. He said that the 18'-6" for the rear wall is okay with the nailing pattern called out and no hold-downs are needed.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Plan Reviewer's activity | | | | | PASS |
|
|
|
Because of excessive red-lining only ONE set is being approved.
|
Inspection Record Card- Bld | | | | | |
|
|
|
|