BLD-Final | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PASS |
Jim Sly
|
|
|
Bryan; ###-####. Garage code #8888
|
BLD-Energy code compliance | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | PASS |
Alan Hauser
|
|
|
bryan ###-#### reinspection R-19 required @ crawl flr. cavities 7/19/00 3:24:07 PM
|
BLD-Framing/Rough-in | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | PASS |
Tom Arcoraci
|
|
|
BRIAN-- ###-#### RE-INS FR
|
BLD-Energy code compliance | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-####--BRIAN --ENERGY CODE C/n posted 1st mec. check failed. 7/19/00 10:16:55 AM
|
BLD-Framing/Rough-in | 7/14/2000 | 7/17/2000 | 7/17/2000 | A | FAIL |
Carl Dependahl
|
|
|
bryan ###-#### floor will be checked at final--cancel per bryan Ok to insul. 7/18/00 2:00:45 PM
|
BLD-Energy code compliance | 7/14/2000 | 7/17/2000 | 7/17/2000 | A | FAIL |
Alan Hauser
|
|
|
cancel per bryan
|
BLD-Framing/Rough-in | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | FAIL |
Carl Dependahl
|
|
|
bryan-- ###-#### fr insp Keep C/N 7/18/00 2:09:39 PM
|
BLD-Energy code compliance | 7/17/2000 | 7/17/2000 | 7/17/2000 | P | FAIL |
Carl Dependahl
|
|
|
bryan --###-#### energy code Recall w/frame 7/18/00 2:09:47 PM
|
BLD-Framing/Rough-in | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | PART |
Carl Dependahl
|
|
|
reinspection bryan ###-#### Ok to insul...keep C/N, recall w/new Mez. check. 7/18/00 1:28:27 PM
|
BLD-Framing/Rough-in | 7/11/2000 | 7/12/2000 | 7/12/2000 | P | FAIL |
Tony Young
|
|
|
brian--###-#### fr C/N left/trusses- energy code 7/13/00 1:33:52 PM
|
BLD-Framing/Rough-in | 6/29/2000 | 6/29/2000 | 6/29/2000 | P | PART |
Jim Sly
|
|
|
shear bryan ###-#### Shear OK 6/29/00 1:44:36 PM
|
BLD-Foundation | 6/1/2000 | 6/2/2000 | 6/2/2000 | A | PART |
Jim Sly
|
|
|
Jerry ###-#### Found appears ok 6/5/00 10:55:58 AM
|
BLD-Footing | 6/1/2000 | 6/1/2000 | 6/1/2000 | P | PART |
Jim Sly
|
|
|
late pm ###-#### F/A ok 6/5/00 10:27:14 AM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/24/2000 | | DONE |
|
|
|
|
Telephone call | | | 5/24/2000 | | DONE |
|
|
|
called left message
|
Plan assigned to (SAM) | 5/23/2000 | | 5/24/2000 | | PASS |
Steve Munroe
|
|
|
5/24/2000 08:45:55 SAM - activity updated through activity BLDA022 from case BLD00-01287.
|
Pending Assignment by DJO | 5/8/2000 | | 5/23/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 5/8/2000 | 5/8/2000 | 5/9/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 5/8/2000 | 5/8/2000 | 5/8/2000 | | DONE |
|
|
|
|
Application received | | | 5/8/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 5/9/2000 | 5/9/2000 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
5/23/00 10:18 Called and taked to Mike Carrol about bracing, engineering and getting all red-lining into the plans. I then called and left a message for the engineer to call me. I have question on the nook, if he is requiring any special straps.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|
Issue PAID IN FULL permit | | | | | |
|
|
|
|