Permit Information
Permit NumberBLD00-01306
StatusFinaled
Name SONNA BUILDING ASSOCIATES
Site Address 904 W MAIN ST
Project NameSONNA BLDG-1ST FLR
Customer Number 
ePlanReviewNo
Description
To remodel a 1,240 sq.ft. tenant space for new food establishment per approved plans on file. Work to demolition of interior non-bearing walls & finishes; installation of new interior non-bearing walls to create new work areas, kitchen - prep area, service & dining area; a new accessible restroom, suspended ceiling grid system, electrical, mechanical, plumbing & sprinkler system upgrades as required for new tenant and for code compliance. NOTE: This building is fully fire sprinklered for 1-hr. substitution. This space previously occupied by Amore restaurant. PC.#342-00)/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes5/10/20005/10/200010/24/2000 DONE
Permanent occupancy  9/13/2000 DONE
Perm. Occ. Cert. #8371 issued 9-13-00 to the Subway on the 1st floor of the Sonna Bldg.
Permanent Occupancy 9/8/20009/8/2000 DONE
Details
BLD-Final9/7/20009/8/20009/8/2000APASS
Details
David Freeman, ###-#### - Cathy has the card, all agencies have signed off ok for 310 to sign 9/8/2000 2:14:45 PM
FIRE-Final Inspection8/8/20008/8/20008/8/2000PPASS
DetailsRick Jackson
DAVID-- ###-#### FIRE FN
BLD-Final8/8/20008/8/20008/8/2000PPART
Details
DAVID-- ###-#### FN OCC ok for temp only need tactile signage and this door to remain unlocked during buisness hours signage 8/8/2000 4:14:03 PM
BLD-Final8/7/20008/7/20008/7/2000PFAIL
Details
DAVID ###-#### other agencies not approved need mech permit, need to install all access hardware 8/7/2000 4:27:09 PM
FIRE-Final Inspection8/7/20008/7/20008/7/2000PFAIL
DetailsRick Jackson
###-#### sprinkler head painted; not sprinklered above grid ceiling; extinguisher; sprinkler system annual test; clear rear hallway 8/8/2000 7:54:45 AM
BLD-Framing/Rough-in6/20/20006/20/20006/20/2000PPART
Details
DAVID--###-#### FR ok to coverthe walls with the elec approvals 6/21/00 10:17:50 AM
Issue PAID IN FULL permit  6/9/2000 DONE
Routing - PLAN CHECK6/7/2000 6/8/2000 PASS
Plans routed to Plumbing & PW - approved by both. Architect Tom Haney faxed 8-1/2" x 11" details for relocating door originally shown at the entrance to the foodprep/storage area to across the hall separating the customer area from the rear kichen prep/storage/restroom area. Called architect to review when 12" clearance is required on push side of door - when door has closer & latch - which this door will not have per architect. Modification okay. Will attach to plans. Reviewed with Tom Haney the red-line notes on the plans concerning the required clearances W/I the restroom & in the hall and the door swing. He understands and has reviewed with the contractor. Routing to the front desk for issuance of permit.
PLANS/APPL TAKEN TO FRONT DESK  6/8/2000 PASS
To permit desk for issuance of permit.
Inspection Record Card- Bld  6/8/2000 DONE
Print Occupancy Form  6/8/2000 DONE
Telephone call  6/8/2000 DONE
called left message permit ready and fees due Corry Perkins
Plan assigned to (DRS)5/23/2000 6/8/2000 PASS
DetailsDan Stuart
Routing - PLUMBING6/5/2000 6/7/2000 PASS
provide an indirect waste receptor for the drain in the front counter per section 804 97 upc, provide smith grease trap for 3 compartment sink, all floor sinks to be out from under cabinets
Routing - PUBLIC WORKS6/5/2000 6/5/2000 PASS
Routing - PLAN CHECK6/1/2000 6/2/2000 PEND
Inserted resubmittal Sheet 1 into plans. Resubmittals incorrect or incomplete. Red-lined code compliance requirements onto plans concerning clearances in front of toilet; door swing into restroom and cleasrance in hall of 42" min. for access; note on accessible route and section of clearances at sink; all with copies of pictoral details from past code seminars for reference by contractor & inspector. Faxed copy to architect. Plans routed back to PW & Plumbing for re-review of past fail.
Plan resubmittals received  6/2/2000  
Received two sets of resubmittal sheet one from Tomas Haney, Architect. Forwarded to Dan Stuart.
Plan Reviewer's activity  6/2/2000  
Inserted new sheet one into plans. Resubmittals were incomplete or changes caused other problems. Red-Lined code requirements on plans for clearances at toilet, door swing change and clearances in hall; provide copies of code complying details from past code seminar for reference by the contractor and sent copy to architect. Forwarding back to public works & plumbing for re-review of past fail.
Routing - FIRE5/26/20006/1/20006/1/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  6/1/2000 FAIL
DetailsBill Alexander
Routing - PLAN CHECK5/23/2000 5/26/2000 PEND
Resubmittals required. Faxed and mailed copy of plan review comments to Tom Havey, Architect. Forwarding plans to fire code analysts for review while waiting for response.
Plan resubmittals requested  5/26/2000 FAIL
Mailed & Faxed copy of plan review comments to Tom Havey, Architect, for his response & resubmittal.
Telephone call  5/26/2000 DONE
Called Tom Havey to ask for FAX number. Number listed on application is his regular phone number and the fax does not go through.
Pending Assignment by MYS5/11/2000 5/19/2000 DONE
DetailsMarlene Southard
Routing - PLUMBING5/12/2000 5/18/2000 FAIL
Routing - PUBLIC WORKS5/11/2000 5/12/2000 FAIL
NEEDS GREASE TRAP FOR FOUR COMPARTMENT SINK. WB
Plan routing begun/TENANTS  5/11/2000 DONE
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE. Previously reviewed and approved by Carol Johnson, Central District Health.
Plans ACCEPTED BY PLAN TECH  5/10/2000 DONE
Received Certificate of Value  5/10/2000 DONE
Application received  5/10/2000  
Recd Pcfee & Taken To Pln CK  5/10/2000 DONE