Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01374
StatusFinaled
Name DYKMAN ALLEN D & DIXIE
Site Address 2323 S FEDERAL WAY
Project NameDYKES ELECTRIC INC.
Customer Number 
ePlanReviewNo
Description
DYKES ELECTRIC, INC. TO CONSTRUCT A NEW 12,250 S.F., ONE STORY WAREHOUSE ADDITION TO THE SOUTH SIDE OF THE EXISTING DYKE'S ELECTRIC, INC. WAREHOUSE AND OFFICE BUILDING. THE WAREHOUSE WILL BE FOR STORAGE OF ELECTRIC MOTORS AND RELATED COMPONENTS. THIS ADDITION IS BEING SEPARATED FROM THE EXISTING BUILDING BY A FOUR-HOUR FIRE-RESISTIVE AREA SEPARATION WALL. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. THIS BUILDING ADDITION IS BEING CONSTRUCTED OF MASONRY EXTERIOR WALLS AND PACIFIC BUILDING SYSTEMS STEEL FRAME AND ROOF SYSTEM. THE ADDITION WILL BE FULLY FIRE SPRINKLED (THE EXISTING BUILDING IS NOT FIRE SPRINKLED). FIRE DEPARTMENT PLAN REVIEW AND PERMITTING IS REQUIRED FOR FIRE SPRINKLER WORK. FIRE DEPARTMENT PLAN REVIEW AND PERMTTING IS REQUIRED FOR FIRE ALARM INSTALLATION. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH00-00046/PC#367-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/25/20036/25/20036/25/2003 DONE
Additional values from subcontractors.
BLD-Conference1/7/20031/7/20031/7/2003PCANC
DetailsWm. Michael Meloy
Code Occupancy Approval1/7/20031/7/20031/7/2003PPASS
DetailsWm. Michael Meloy
Compliance met. 1/7/2003 2:53:00 PM
Permanent occupancy  6/28/2002 DONE
Perm. Occ. Cert. #9233 issued 6-28-02 to Dyke's Electric, Inc.
Permanent Occupancy 6/17/20026/17/2002 DONE
Details
Office Staff conference/action  12/5/2001 DONE
Temp. Occ. extended for 90 days thru March 6, 2002.
Telephone call  11/8/2001 DONE
Talked to Ron re: status of temp. occ. he will get it taken care of
Fee Review-notes5/16/20005/16/200010/18/2001 DONE
Temporary occupancy  9/6/2001 PART
Temp. Occ. Cert. #4589 issued 9-6-01 to Dyke's Electric, Inc.
BLD-Framing/Rough-in9/4/20019/5/20019/5/2001APASS
DetailsJim Storey
###-#### GALE fianl ok for perm occ upon final and bond release from p&z/ 9/5/2001 3:36:59 PM
BLD-Final8/15/20018/16/20018/15/2001ADONE
DetailsJim Storey
###-#### ron
BLD-Final4/2/20014/3/20014/3/2001AFAIL
DetailsJim Storey
Ron ###-#### need rack permit./ada protection on sink/ mech sign off/ p/z bond/exit signage and hardware.sp sign off. 4/3/2001 9:17:29 AM
FIRE-Final Inspection1/11/20011/11/20011/11/2001PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 1/11/2001 3:44:23 PM verified smoke vents on roof have safety locks removed - okay; final pass 1/11/2001 3:45:10 PM
BLD-Framing/Rough-in12/20/200012/21/200012/21/2000ANR
DetailsJim Storey
Ron ###-####
Plan Modification Accepted  12/5/2000 PASS
DetailsJim Storey
resubmital ok with engineering notes. one copy archived and other routed through dave radford to job site. change of canopys to wood const.
Plan resubmittals received  12/4/2000 DONE
Received two copies of revised sheet 1 of 1 and calculations changing the canopy framing from steel to wood. The sheets are not stamped or signed. Routed to Jim Storey. KMM
BLD-Framing/Rough-in11/27/200011/28/200011/28/2000APASS
DetailsJim Storey
###-#### wood and steel framing ok pending others and smoke vent instalation/ exit door south east corner of old blg. needs cut in. 11/28/2000 10:08:25 AM
BLD-Other11/27/200011/27/200011/27/2000 PASS
office resubmital aproved and acrived to master set.
Plan resubmittals received  11/24/2000 DONE
Received Plan Resubmittals from Ron Van Auker Inc.. two sets of sheets A-1 and A-3, forwarded same to John Menard. 11/24/00 DAR
Routing - PLANNING10/25/200010/25/200010/26/2000 PASS
Per attached conditions of approval.
Plan resubmittals received  10/24/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM RONALD VAN AUKER INC. SMALL DOCUMENTS AND TWO SETS OF SHEETS SP-1, A-1, A-2, S-4 AND S-5, FORWARDED SAME TO JIM STORY. 10/24/00 DAR
BLD-Framing/Rough-in10/4/200010/5/200010/5/2000PPART
DetailsJim Storey
RE-BAR INSP RON ###-#### placed with special insp pending report. 10/5/2000 4:03:12 PM
BLD-Concrete9/22/20009/25/20009/25/2000PPART
DetailsJim Storey
###-#### bar ok pending s/i report. 12 ft lift. 9/25/2000 3:09:52 PM
BLD-Foundation9/21/20009/21/20009/21/2000PPART
DetailsJim Storey
Ron; ###-#### pending s/i report. 9/21/2000 3:41:50 PM
BLD-Concrete9/20/20009/20/20009/20/2000PPART
DetailsJim Storey
###-#### rebar inspection placed with special insp. 9/20/2000 5:21:48 PM
BLD-Concrete9/20/20009/20/20009/20/2000PPART
DetailsJim Storey
###-#### rebar inspection placed with special insp. 9/20/2000 5:21:48 PM
BLD-Concrete9/18/20009/18/20009/18/2000PPART
DetailsJim Storey
rebar ###-#### pending report on grout. 9/18/2000 4:58:32 PM
BLD-Framing/Rough-in9/14/20009/14/20009/14/2000PPART
DetailsJim Storey
REBAR INSP-- ###-#### RON pending sp/insp. bar ok first 9/14/2000 3:08:56 PM lift north and east walls. 9/14/2000 3:09:16 PM
BLD-Foundation9/1/20009/5/20009/5/2000APART
DetailsTom Arcoraci
Ron ###-#### 9/5/2000 10:51:53 AM spec insp on site 9/5/2000 10:52:08 AM
FIRE-Sprinkler Rough-in8/30/20008/31/20008/31/2000AFAIL
DetailsRick Jackson
david ###-#### underground fire see FIR00-00504 need more clearance under foundation 8/31/2000 3:35:08 PM
FIRE-Sprinkler Rough-in8/29/20008/29/20008/30/2000PFAIL
DetailsRick Jackson
underground test David ###-#### left c/n - plans not submitted 8/30/2000 9:30:53 AM
BLD-Footing8/28/20008/29/20008/29/2000APART
DetailsJim Storey
ron ###-####
Issue PAID IN FULL permit  8/16/2000 DONE
Plan assigned to (JCM)5/22/20005/22/20007/11/2000 PASS
DetailsJohn Menard
7/11/00 13:19:21 JCM - activity updated through activity BLDA022 from case BLD00-01374.
Routing - PLAN CHECK6/26/2000 7/11/2000 PASS
Plan Reviewer's activity  7/11/2000 PASS
RECEIVED A COPY OF THE RECORDED DENSITY REDUCTION SURVEY. INSTRUMENT #100053540 - RECORDED 7/10/00 - SURVEY #5034
PLANS/APPL TAKEN TO FRONT DESK  7/11/2000 PASS
Inspection Record Card- Bld  7/11/2000 DONE
Print Occupancy Form  7/11/2000 DONE
Telephone call  7/11/2000 DONE
TALKED TO GAIL TO VERIFY PLANS ARE READY--ALSO STATED WE NEED SOMETHING FROM HIGHWAY DIST
Routing Off Site - STRUCTURAL5/22/2000 7/3/2000 PEND
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Routing Off Site - STRUCTURAL6/22/2000 6/30/2000 PASS
CONTACTED PDQ TO TAKE OUT REVISED STRUCT. DATED 6/21/00, TO OUTSIDE ENG. KMM RECEIVED FAXED APPROVAL OF RESUBMITTALS. JCM
Routing - FIRE6/22/20006/22/20006/26/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK6/19/2000 6/22/2000  
Plan resubmittals received  6/21/2000 DONE
RECEIVED TWO COPIES OF REVISED RESPONCE TO STRUCTURAL REVIEW AND RESPONSE TO FIRE DEPARTMENT REVIEW. ROUTED TO JOHN M. KMM
Routing - FIRE6/14/20006/19/20006/19/2000 FAIL
DetailsBill Alexander
Need water flow (sprinkler) requirement. Need storage/commoditiy information including height, etc. Nedd mechanical indicating the location of fire sprinkler supply line.
Plan Review Completed(1st rev)  6/19/2000 FAIL
DetailsBill Alexander
Plan resubmittals requested  6/19/2000 PEND
DetailsBill Alexander
Faxed preliminary requirement list to meet UFC issues.
Plan Reviewer's activity  6/14/2000 PEND
PLAN REVIEW COMPLETED, WAITING FOR A DENSITY REDUCTION SURVEY AND BUILDING ANALYSIS OF EXISTING BUILDING CONSTRUCTION TYPE AND USES. JCM
Routing - PLAN CHECK6/2/2000 6/14/2000  
Application received  6/9/2000 PEND
FAXED GAYLE JENSEN REQUESTING ADDITIONAL INFORMATION OF THE EXISTING BUILDING AND INDICATED TO HIM THAT THIS PROJECT WOULD REQUIRE A DENSITY REDUCTION SURVEY. JCM
Plan resubmittals requested  6/9/2000 PEND
FAXED GAYLE JENSEN AT VAN AUKER A COPY OF THE COMMENT LIST FROM THE CONSULTING ENGINEER REQUESTING REVISIONS. JCM
Routing - PLUMBING5/31/2000 6/2/2000 PASS
provide canopy drain per upc
Routing - PLANNING5/25/2000 5/31/2000 PASS
approved per DRH00-46.
Routing - PUBLIC WORKS5/22/2000 5/25/2000 PASS
Plan assigned to (MYS)5/16/20005/16/20005/22/2000 PASS
DetailsMarlene Southard
Plans ACCEPTED BY PLAN TECH  5/22/2000 PASS
Received Certificate of Value  5/22/2000 PASS
Plan routing begun/NEW & ADDTN  5/22/2000 PEND
Application received  5/16/2000  
Recd Pcfee & Taken To Pln CK  5/16/2000 DONE