BLD-Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | PASS |
Russ Owen
|
|
|
Rick ###-#### reinspection
|
BLD-Final | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | FAIL |
Russ Owen
|
|
|
Rick ###-####c/n for 4 risers from garage steps. 10/27/2000 1:11:01 PM
|
BLD-Energy code compliance | 8/31/2000 | 9/1/2000 | 9/1/2000 | A | PASS |
Russ Owen
|
|
|
RICK --###-#### ENERGY CODE
|
Override - Parcel Holds | | | 8/31/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | FAIL |
Russ Owen
|
|
|
RICK ###-#### R/I C/N posted. 8/30/2000 6:56:50 PM
|
Override - Parcel Holds | | | 8/30/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/29/2000 | 8/29/2000 | 8/29/2000 | P | PART |
Russ Owen
|
|
|
SHEAR PANEL-- RICK ###-####--CALL 1ST BEFORE INSP ok to side need fasteners at front hold down per new engineering. 8/30/2000 9:05:33 AM
|
Override - Parcel Holds | | | 8/29/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | FAIL |
Tony Young
|
|
|
###-####
c/n posted , need engineer fix on hold downs, nailing, straps. exterior inspection only 8/22/2000 3:12:49 PM
|
Override - Parcel Holds | | | 8/22/2000 | | |
|
|
|
|
BLD-Foundation | 7/10/2000 | 7/10/2000 | 7/10/2000 | P | PART |
Russ Owen
|
|
|
jack ###-#### Work completed looks good, not yet complete. 7/11/00 11:31:00 AM
|
Override - Parcel Holds | | | 7/10/2000 | | |
|
|
|
|
BLD-Footing | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PASS |
Russ Owen
|
|
|
###-####
|
Override - Parcel Holds | | | 7/6/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/6/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/6/2000 | | |
|
|
|
|
Plan assigned to (DJO) | 5/31/2000 | 5/31/2000 | 6/28/2000 | | PASS |
Dan Overy
|
|
|
6/28/2000 08:50:18 DJO - activity updated through activity BLDA022 from case BLD00-01402.
|
Case Summary (BLD) | | | 6/28/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/28/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2000 | | DONE |
|
|
|
phillis took message
|
Plan Review Report | | | 5/31/2000 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 5/31/2000 | | |
|
|
|
|
Plan Reviewer's activity | | | 5/31/2000 | | DONE |
|
|
|
plans are in question. missing bearing and beams. engineering for both bays and tall wall required. accurate roof frame needed. will issue as soon as these items and flood plain certs are received.
|
Override - Parcel Holds | | | 5/31/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 5/18/2000 | 5/18/2000 | 5/18/2000 | | DONE |
|
|
|
|
Routing - PLANNING | 5/18/2000 | 5/18/2000 | 5/18/2000 | | DONE |
|
|
|
|
Application received | | | 5/18/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 5/18/2000 | 5/18/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 5/18/2000 | | | | PEND |
Dan Overy
|
|
|
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|