Case Summary (BLD) | | | 11/17/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/17/2006 | | |
|
|
|
|
Fee Review-notes | 5/25/2000 | 5/25/2000 | 2/8/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 17:26:19. Contact: ###-####. should have been final structural
|
BLD-Final | 9/28/2000 | 9/28/2000 | 9/28/2000 | P | PART |
Jim Storey
|
|
|
###-#### temp ok pending others for perm 9/28/2000 1:47:08 PM
|
FIRE-Final Inspection | 9/26/2000 | 9/27/2000 | 9/27/2000 | P | PART |
Rick Jackson
|
|
|
dAVID ###-#### need assembly permit 9/27/2000 4:11:31 PM
|
BLD-Final | 9/27/2000 | 9/27/2000 | 9/27/2000 | P | PART |
Jim Storey
|
|
|
FN DAVID ###-####
|
FIRE-Final Inspection | 9/25/2000 | 9/26/2000 | 9/26/2000 | A | FAIL |
Rick Jackson
|
|
|
David ###-#### needs sprinkler bell; occupant load sign; panic on side door; hang extinguishers; 9/26/2000 2:21:31 PM
|
BLD-Framing/Rough-in | 9/21/2000 | 9/21/2000 | 9/21/2000 | P | PART |
Jim Storey
|
|
|
sizmit grid insp-- david-- ###-#### ceilling ok for cover. 9/21/2000 4:11:39 PM
|
BLD-Framing/Rough-in | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PASS |
|
|
|
shaft David ###-#### made ok duct resized and the shaft was reworked 9/7/2000 3:13:53 PM
|
BLD-Framing/Rough-in | 9/5/2000 | 9/6/2000 | 9/6/2000 | A | FAIL |
|
|
|
David ###-#### 1-hour shaft too close to the duct at the roof deck line 9/6/2000 11:38:35 AM
|
BLD-Framing/Rough-in | 8/23/2000 | 8/24/2000 | 8/24/2000 | A | PART |
Jim Storey
|
|
|
David ###-#### framing ok. 8/24/2000 2:26:04 PM
|
BLD-Framing/Rough-in | 8/23/2000 | 8/23/2000 | 8/23/2000 | P | CANC |
|
|
|
last today David ###-#### done by 301 8/24/2000 10:31:17 AM
|
BLD-Framing/Rough-in | 8/21/2000 | 8/22/2000 | 8/22/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 16:29:05. Contact: ###-####.late as possible called and canclled. 8/22/2000 3:01:32 PM
|
Issue PAID IN FULL permit | | | 8/1/2000 | | DONE |
|
|
|
|
Additional plans submitted | | | 7/10/2000 | | PASS |
|
|
|
Satisfactory water info rec'd from UW; review updated; both submitted for scanning into Optika.
|
Additional plans submitted | | | 7/7/2000 | | |
|
|
|
UW info provided hydrant flow instead of AS flow. Have requested AS flow from UW and advised Applicant (Pinewave Design).
|
Plan assigned to (CJW) | 5/26/2000 | | 6/12/2000 | | PASS |
Carl Westfall
|
|
|
6/12/00 13:34:30 CJW - activity updated through activity BLDA022 from case BLD00-01489.
|
Routing - PLAN CHECK | 6/12/2000 | | 6/12/2000 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2000 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/12/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2000 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Routing - FIRE | 6/8/2000 | 6/9/2000 | 6/9/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 6/9/2000 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 6/2/2000 | | 6/8/2000 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 6/7/2000 | | PASS |
|
|
|
UBC plan review started June 7, 2000 and finished the next day. The drawings were approved with conditions. See the conditions list.
|
Routing - PLUMBING | 6/1/2000 | | 6/2/2000 | | PASS |
|
|
|
install rp for carbonator over floor sink or mop sink, trap and vent indirect wastes over 15', additional cross connection may be required, if an automatic soap dispensor is installed at the mop sink provide a water supply for it.
|
Routing - PUBLIC WORKS | 5/26/2000 | | 6/1/2000 | | DONE |
|
|
|
|
Plan routing begun/TENANTS | | | 5/26/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE. Previously approved by Robert Mayer from Central District Health.
|
Plans ACCEPTED BY PLAN TECH | | | 5/26/2000 | | DONE |
|
|
|
ARCHITECH/ENGINEER OF RECORD FORM WILL BE FAX AT A LATER DATE , OTHER DISCREPANCIES FAX TO ARCHITECT.
6/5/2000 RECEIVED ARCH. ENG. RECORD FORM. PUT COPY IN FILE AND ROUTED ONE TO CARL W. KMM
|
Pending Assignment by MYS | 5/26/2000 | | 5/26/2000 | | DONE |
Marlene Southard
|
|
|
|
Application received | | | 5/25/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 9/1/2000 | 9/1/2000 | 3/31/2000 | P | FAIL |
Jim Storey
|
|
|
david-- ###-#### --shaft around grease vent shaft fail c/n posted mech to be reinspected. 9/1/2000 3:25:03 PM
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|