Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01505
StatusExpired
Name D. OLSON/ FIRST CONGREGATIONAL CHURCH
Site Address 2201 W WOODLAWN AVE
Project Name1ST CONGREGATIONAL CHU
Customer Number 
ePlanReviewNo
Description
To remodel the basement & upper level portion of an existing church as phase II for code upgrades. Phase I done under May 1994 permit. Work to include separation of basement from upper level by 1-hour fire resistive construction on the usable space side; installation of 3'-0" x 6'-8" exit doors from rooms in basement and upper floor into the hallway; exit doors into basement hall to be a minimum of self-closing, tight-fitting, door assemblies, sec. 712 UBC; to provide 1-hour fire-resistive construction between the E-3 - Daycare and surrounding rooms (beside & below) W/ 60 minute door assemblies at openings into the building interior; complying handrails on stairs at upper & lower levels; all per approved plans, notes & plan review comments attached to plans. P.C.#00-393/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/22/2008  
Fee Review-notes5/25/20005/25/20002/8/2002 DONE
BLD-Conference11/16/200011/16/200011/16/2000PPASS
DetailsTom Arcoraci
DAVE MILLER ###-#### FOR CONF
Issue PAID IN FULL permit  10/11/2000 DONE
Telephone call  10/6/2000 DONE
taked to debbie at ###-#### to verify plans are ready
Inspection Record Card- Bld  6/19/2000 DONE
Print Occupancy Form  6/19/2000 DONE
Telephone call  6/19/2000 DONE
LEFT MESS FOR JOHN PAUL THAT PERMIT IS READY
Routing - FIRE6/13/20006/16/20006/16/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  6/16/2000 PASS
DetailsBill Alexander
Routing - PLAN CHECK6/16/2000 6/16/2000 PASS
Approved as noted and attached
PLANS/APPL TAKEN TO FRONT DESK  6/16/2000 PASS
To permit desk for issuance.
Plan assigned to (DRS)5/31/2000 6/16/2000 PASS
DetailsDan Stuart
6/16/2000 16:39:36 DRS - activity updated through activity BLDA022 from case BLD00-01505.
Routing - PLAN CHECK5/31/2000 6/12/2000 PEND
Approved as noted on plans and attachments thereto. Routing to fire for review.
Telephone call  6/12/2000 DONE
Talked with Dave Turner to verify occupancy use groups shown on plans versus those shown in 1994 submittals & to review differences under the 1997 UBC versus the 1991 UBC under which the upgrades would have been established. Will review based on the 1997 UBC which has reduced rated exit corridor requirments.
Pending Assignment by MYS5/31/2000 5/31/2000 DONE
DetailsMarlene Southard
Plan routing begun/TENANTS  5/31/2000 DONE
Route to PLAN CHECK and FIRE.
Plans ACCEPTED BY PLAN TECH  5/30/2000 PASS
Received Certificate of Value  5/25/2000 DONE
Application received  5/25/2000  
Recd Pcfee & Taken To Pln CK