Permit Information
Permit NumberBLD00-01531
StatusFinaled
Name SHACKELFORD RICHARD L &
Site Address 13965 W CHINDEN BLVD
Project NameASHLEY MANOR
Customer Number 
ePlanReviewNo
Description
ASHLEY MANOR CARE CENTERS INC. COOPERATE OFFICES. TO CONSTRUCT A 12,788 SQ. FT. THREE STORY, TYPE VN, FULLY FIRE SPRINKLERED BUILDING IN ACCORDANCE WITH THE APPROVED PLANS AND ATTACHMENTS. SQ. FIRST FLOOR 5088, SECOND FLOOR 4688, THIRD FLOOR 3012. NOTES: PROJECT APPROVED WITH ONE TENANT OCCUPYING ENTIRE BUILDING, FIRE SPRINKLERS USED FOR STORY INCREASE.
DRH99-00257, CAR99-0006, PC #400-00 MLO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/25/20036/25/20036/25/2003 DONE
Case Summary (BLD)  3/21/2003  
Permanent occupancy  1/16/2002 DONE
Perm. Occ. Cert. #8994 issued 1-16-02 to Ashley Manor Care Center, Inc. corp. offices.
Permanent Occupancy 1/4/20021/4/2002 DONE
Details
BLD-Final1/3/20021/4/20021/4/2002APASS
DetailsJim Sly
###-#### OK for Perm Occ. 1/4/2002 3:47:39 PM
Code Occupancy Approval  12/26/2001 PASS
Modification to DR to delete Eagle/Chinden streetscape from this Phase of the project was approved. Final. Can do bond release.
Fee Review-notes5/30/20005/30/200011/30/2001 DONE
Temporary occupancy  11/20/2001 PART
Temp. Occ. Cert. #11-20-01 to Ashley Manor (corp. ofc.)
BLD-Final11/16/200111/19/200111/19/2001APART
DetailsJim Sly
###-#### VAL OK for Temp Occ. 11/20/2001 4:15:41 PM
FIRE-Final Inspection11/16/200111/16/200111/16/2001APASS
DetailsTroy Cobbley
Added by Inspector: 430 On 11/16/2001 10:30:21 AM OK for perm occ
FIRE-Supply Line Hydro11/5/200111/6/200111/6/2001PFAIL
DetailsTroy Cobbley
3rd floor a/v's wrong candella, batteries in facp wrong, plans need resubmitted with additional detectors shown, provide map at facp, post sign on riser door, provide phone jacks, provide proper recall, provide address for remote station 11/7/2001 9:50:29 AM
BLD-Conference9/19/20019/20/20019/20/2001APART
DetailsJim Sly
TAYLOR ###-#### Handrails/landings 9/20/2001 9:06:54 AM
Case Summary (BLD)  8/28/2001 DONE
BLD-Framing/Rough-in7/31/20017/31/20017/31/2001PFAIL
DetailsJim Sly
###-#### C/N...3rd floor...Nail hangers, need all trade R/I appr incl. sprinkler, Nail Gyp at 1hr 7" OC, Maintain 1hr at ceiling or Architect to provide letter omitting Rated ceiling. 7/31/2001 1:57:20 PM
BLD-Framing/Rough-in6/29/20017/2/20017/2/2001APART
DetailsJim Sly
###-#### Val Taylor OK to cover 2nd floor. 7/2/2001 9:36:54 AM
BLD-Framing/Rough-in6/22/20016/25/20016/25/2001APART
DetailsJim Sly
val ###-#### Frame OK 1st floor only. 6/25/2001 10:42:48 AM
BLD-Framing/Rough-in6/4/20016/5/20016/5/2001AFAIL
DetailsJim Sly
Val Taylor ###-#### Need all trade finals. 6/5/2001 12:37:36 PM
BLD-Framing/Rough-in5/29/20015/30/20015/30/2001APART
DetailsJim Sly
nail pattern for siding ###-#### Shear nailing OK. 5/30/2001 8:50:50 AM
BLD-Conference5/8/20015/9/20015/9/2001APART
DetailsJim Sly
for conf-- val--###-#### -call 1st before insp Review of plans and work completed. 5/9/2001 11:56:31 AM
BLD-Foundation3/19/20013/19/20013/19/2001PPART
DetailsCarl Dependahl
stem wall insp - mike ###-#### , ok pending report 3/19/2001 3:28:35 PM
BLD-Footing3/16/20013/16/20013/16/2001PPART
DetailsJim Sly
pouring at 1:30 ###-#### Elevator and front column pads OK pending special insp and approval. 3/16/2001 3:38:30 PM
BLD-Footing3/13/20013/14/20013/14/2001PPART
DetailsRuss Owen
###-#### WILL POUR AT 1:30subject to s-i. 3/14/2001 4:10:12 PM
BLD-Footing3/12/20013/12/20013/12/2001PPART
DetailsJim Sly
###-#### Advised contr. his need of special insp for concrete (3500PSI) 3/12/2001 1:58:41 PM
Plan resubmittals received  3/9/2001 DONE
Received one copy of field change order from John Cook. Routed to Jim Sly. KMM
(F) Reprint permit  3/7/2001 DONE
Issue PAID IN FULL permit  3/6/2001 DONE
Telephone call  3/5/2001 DONE
called tom gave dollar amount
CHANGE STATUS TO (R)  3/2/2001 DONE
Telephone call  1/25/2001 DONE
called John Cook and told him to come and get his permit pronto... ###-####
Plan assigned to (MLO)6/2/2000 11/6/2000 PASS
DetailsMike Otto
11/6/2000 15:17:53 MLO - activity updated through activity BLDA022 from case BLD00-01531.
Routing - FIRE11/2/2000 11/6/2000 PASS
Resubmittal of Nov 2, provided required information.
PLANS/APPL TAKEN TO FRONT DESK  11/6/2000 DONE
Inspection Record Card- Bld  11/6/2000 DONE
Print Occupancy Form  11/6/2000 DONE
Telephone call  11/6/2000 DONE
called gave dollar amount they also need achd
Additional plans submitted  11/2/2000 DONE
Received two copies of small documents from John Cook, concerning fire flow addresed to Bill Alexander, forwarded same to Mike Otto at his request. 11/2/00 DAR
Routing - FIRE9/13/2000 9/19/2000 FAIL
Requested info not included. Called architect to discuss; he's out of office until 9/25. Left message to call back. plans returned to plan review
Meeting  9/13/2000 DONE
HAD MEETING WITH CONTRACTOR AT PERMIT COUNTER. WENT OVER DOOR REQUIREMENTS FOR STAIR ENCLOSURES AND THAT BUILDING WAS TO HAVE A SINGLE TENANT AS APPROVED. MLO
Routing - PLAN CHECK9/12/2000 9/13/2000 PASS
Routing - FIRE8/23/2000 9/11/2000 FAIL
plans returned to plan review
Plan resubmittals received  9/11/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM JOHN COOK OF DESIGN STUDIOSTWO SETS OF CIVIL, ARCHITECTURAL , STRUCTURAL AND MECHANICAL PLANS, FORWARDED SAME TO MIKE OTTO. 9/11/00, DAR
Meeting  8/23/2000 DONE
met with architect and went over corrections and occupancy of the building. separate tenants will require separate permits for each tenant space with the building under a shell and core. Letter sent to architect. MLO
Routing - PLANNING8/18/2000 8/21/2000 PASS
Approver per DRH99-257.
Routing - PLAN CHECK8/7/2000 8/18/2000 FAIL
CORRECTIONS MAILED TO ARCHITECT.
Plan resubmittals requested  8/18/2000 FAIL
UBC CORRECTIONS NOT SATISFIED
Plan resubmittals received  8/4/2000 DONE
RECEIVED TWO FULL SETS OF ADDENDUM #2 FROM JOHN COOK, SHEETS C1.0, A-1, A-2, A-3, A-5,S0.1, S0.2, S1.1, S1.2, S2.1, S2.2, S2.3, S2.4, S2.5, P-1, P-2, P-3, P-4, M-1, M-2, AND FIRE SHEETS. ALSO SMALL DOCUMENTS. 8/4/00 DAR
Plan Review Completed(1st rev)  7/10/2000 FAIL
failed building and fire. Plans returned to plan check
Routing - FIRE7/5/2000 7/10/2000 FAIL
Review notes faxed to architect.
Plan resubmittals received  7/5/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEETS C1.0, A-1, A-2, A-3, A4, A5.0, A7.0, A8.0, FP 1 OF 3, FP 2 OF 3, FP 3 OF 3. ROUTED TO MIKE O. KMM
Plan resubmittals requested  7/5/2000 FAIL
UBC CORRECTIONS
Routing - PLAN CHECK6/28/2000 7/5/2000 FAIL
CORRECTIONS MAILED TO ARCHITECT
Routing Off Site - STRUCTURAL6/27/2000 6/29/2000 PASS
Routing - PLANNING6/19/2000 6/28/2000 FAIL
See letter in DR file - Need revised landscape plan.
Plan resubmittals received  6/27/2000 PEND
RECEIVED FAXED WRITTEN RESPONSE TO STRUCTTURAL CORRECTIONS ONLY. SENT TO CONSULTING ENGINEER FOR REVIEW. MLO
Plan resubmittals requested  6/20/2000 FAIL
STRUCTURAL CORRECTIONS FROM CONSULTING ENGINEER.
Routing Off Site - STRUCTURAL6/2/2000 6/20/2000 FAIL
SENT ONE SET OF PLANS TO AND CALCULATIONS TO THE CONSULTING ENGINEER VIA PDQ. 6/2/00 DAR CORRECTIONS FAXED AND MAILED TO ARCHITECT 6/20/2000 MLO
Routing - PLUMBING6/5/2000 6/19/2000 PASS
Routing - PUBLIC WORKS6/1/2000 6/5/2000 PASS
Plans ACCEPTED BY PLAN TECH  5/31/2000 DONE
Application received  5/30/2000  
Recd Pcfee & Taken To Pln CK