Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01539
StatusFinaled
Name DEFINITIVE PROPERTIES
Site Address 4478 E VIEW RIDGE DR
Project Name 
Customer Number939-8773
ePlanReviewNo
Description
To construct a 2394 sq. ft. two story single family dwelling (1727 sq. ft. first floor/667 sq. ft. second floor) with a 692 sq. ft. basement and a attached 799 sq. ft. three car garage. Per approved plans, engineering and requirement list. This is a solar protected lot. PC#496 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/200011/13/200011/13/2000PPASS
DetailsTom Arcoraci
CALL 1ST BEFORE INSP- ###-####- RUSS -FN OCC-OR HOMEOWNER CONNIE ###-####
BLD-Final11/3/200011/8/200011/8/2000AFAIL
DetailsDave Hannah
###-#### or ###-####
BLD-Wall cover9/19/20009/20/20009/20/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/19/2000 at 11:08:53. Contact: ###-####. framing ok 9/20/2000 10:37:43 AM
BLD-Energy code compliance9/20/20009/20/20009/20/2000PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/20/2000 at 10:42:00. Contact: ###-####.
BLD-Conference9/15/20009/18/20009/18/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/15/2000 at 15:02:35. Contact: ###-####.
Plan resubmittals received  9/13/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM DEFINITIVE PROPERTIES LLC, FORWARDED SAME TO CARL DEPENDAHL WITH SMALL DOCUMENTS. 9/13/00 DAR
BLD-Framing/Rough-in9/6/20009/7/20009/7/2000AFAIL
DetailsCarl Dependahl
RON ###-#### FR; c/n... do not insul. beams etc not per plan 9/7/2000 11:06:00 AM
BLD-Framing/Rough-in8/31/20009/1/20009/1/2000APART
DetailsJim Sly
reinspection ron ###-#### Shear OK 9/1/2000 9:01:35 AM
BLD-Framing/Rough-in8/30/20008/30/20008/30/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/30/2000 keep c/n, reviewed add'l eng'g submitted. ok to continue. recall when ready
BLD-Framing/Rough-in8/21/20008/21/20008/21/2000PFAIL
DetailsCarl Dependahl
Definitive Properties ###-####; c/n, need eng'g. not per plan.per408 8/21/2000 4:17:58 PM
BLD-Framing/Rough-in8/21/20008/21/20008/21/2000PFAIL
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 8/21/2000 cn posted do not cover
8/21/2000 4:22:08 PM
BLD-Framing/Rough-in8/18/20008/18/20008/18/2000PFAIL
DetailsCarl Dependahl
shear insp ###-####;c/n, need plans onsite 8/18/2000 4:59:59 PM
BLD-Foundation7/10/20007/10/20007/10/2000PPART
DetailsCarl Dependahl
dan--###-#### found To Tom 7/11/00 11:35:01 AM
BLD-Footing7/5/20007/5/20007/5/2000PPART
DetailsTom Arcoraci
kim ###-#### around 2:00 rebar not tied 7/6/00 8:14:24 AM
BLD-Concrete6/30/20006/30/20006/30/2000PPART
DetailsCarl Dependahl
###-#### w.i.p. steel in place @ bsmt (bsmt only) 7/6/00 8:21:53 AM
BLD-Footing6/23/20006/26/20006/26/2000PPART
DetailsCarl Dependahl
kim ###-#### ft---late pm is possible no approved plan 6/28/00 1:35:56 PM
CHANGE STATUS TO (ISS)  6/21/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/16/2000 DONE
Inspection Record Card- Bld  6/16/2000 DONE
Telephone call  6/16/2000 DONE
WILL BE DOWN IN 1 HOUR
Issue & PRINT permit  6/16/2000 DONE
Plan assigned to (SAM)6/8/2000 6/16/2000 PASS
DetailsSteve Munroe
6/16/2000 09:26:26 SAM - activity updated through activity BLDA022 from case BLD00-01539.
Pending Assignment by DJO5/30/2000 6/8/2000 DONE
DetailsDan Overy
Routing - PUBLIC WORKS5/30/20005/30/20005/31/2000 PASS
Application received  5/30/2000  
Routing - PLAN CHECK5/31/20005/31/2000  PEND
Routing - PLANNING5/30/20005/30/2000  PASS
Plan Reviewer's activity    PEND
6/9/00 10:20 Talk to builder and let him know what information I need to finish the plan review. I need overheight wall engineering, roof layout, shear wall question answered and maybe beam engineering. They will get back with me.
Print Pending Permit.LaserJet4     
Plan Review Report