BLD-Final | 11/13/2000 | 11/13/2000 | 11/13/2000 | P | PASS |
Tom Arcoraci
|
|
|
CALL 1ST BEFORE INSP- ###-####- RUSS -FN OCC-OR HOMEOWNER CONNIE ###-####
|
BLD-Final | 11/3/2000 | 11/8/2000 | 11/8/2000 | A | FAIL |
Dave Hannah
|
|
|
###-#### or ###-####
|
BLD-Wall cover | 9/19/2000 | 9/20/2000 | 9/20/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/19/2000 at 11:08:53. Contact: ###-####. framing ok 9/20/2000 10:37:43 AM
|
BLD-Energy code compliance | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 10:42:00. Contact: ###-####.
|
BLD-Conference | 9/15/2000 | 9/18/2000 | 9/18/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/15/2000 at 15:02:35. Contact: ###-####.
|
Plan resubmittals received | | | 9/13/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM DEFINITIVE PROPERTIES LLC, FORWARDED SAME TO CARL DEPENDAHL WITH SMALL DOCUMENTS. 9/13/00 DAR
|
BLD-Framing/Rough-in | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | FAIL |
Carl Dependahl
|
|
|
RON ###-#### FR; c/n... do not insul. beams etc not per plan 9/7/2000 11:06:00 AM
|
BLD-Framing/Rough-in | 8/31/2000 | 9/1/2000 | 9/1/2000 | A | PART |
Jim Sly
|
|
|
reinspection ron ###-#### Shear OK 9/1/2000 9:01:35 AM
|
BLD-Framing/Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/30/2000 keep c/n, reviewed add'l eng'g submitted. ok to continue. recall when ready
|
BLD-Framing/Rough-in | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | FAIL |
Carl Dependahl
|
|
|
Definitive Properties ###-####; c/n, need eng'g. not per plan.per408 8/21/2000 4:17:58 PM
|
BLD-Framing/Rough-in | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 8/21/2000 cn posted do not cover
8/21/2000 4:22:08 PM
|
BLD-Framing/Rough-in | 8/18/2000 | 8/18/2000 | 8/18/2000 | P | FAIL |
Carl Dependahl
|
|
|
shear insp ###-####;c/n, need plans onsite 8/18/2000 4:59:59 PM
|
BLD-Foundation | 7/10/2000 | 7/10/2000 | 7/10/2000 | P | PART |
Carl Dependahl
|
|
|
dan--###-#### found To Tom 7/11/00 11:35:01 AM
|
BLD-Footing | 7/5/2000 | 7/5/2000 | 7/5/2000 | P | PART |
Tom Arcoraci
|
|
|
kim ###-#### around 2:00 rebar not tied 7/6/00 8:14:24 AM
|
BLD-Concrete | 6/30/2000 | 6/30/2000 | 6/30/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### w.i.p. steel in place @ bsmt (bsmt only) 7/6/00 8:21:53 AM
|
BLD-Footing | 6/23/2000 | 6/26/2000 | 6/26/2000 | P | PART |
Carl Dependahl
|
|
|
kim ###-#### ft---late pm is possible no approved plan 6/28/00 1:35:56 PM
|
CHANGE STATUS TO (ISS) | | | 6/21/2000 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/16/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/16/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/16/2000 | | DONE |
|
|
|
WILL BE DOWN IN 1 HOUR
|
Issue & PRINT permit | | | 6/16/2000 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 6/8/2000 | | 6/16/2000 | | PASS |
Steve Munroe
|
|
|
6/16/2000 09:26:26 SAM - activity updated through activity BLDA022 from case BLD00-01539.
|
Pending Assignment by DJO | 5/30/2000 | | 6/8/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 5/30/2000 | 5/30/2000 | 5/31/2000 | | PASS |
|
|
|
|
Application received | | | 5/30/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 5/31/2000 | 5/31/2000 | | | PEND |
|
|
|
|
Routing - PLANNING | 5/30/2000 | 5/30/2000 | | | PASS |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
6/9/00 10:20 Talk to builder and let him know what information I need to finish the plan review. I need overheight wall engineering, roof layout, shear wall question answered and maybe beam engineering. They will get back with me.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|