BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 16:51:25. Contact: ###-####.
LC# 20317 issued 3/16/2001 10:12:01 AM
|
DOC - Permit Finaled | 3/16/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Tony Young
|
|
|
Added by Inspector: 415 On 3/16/2001 10:13:55 AM
|
BLD-Final | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/09/2001 at 11:00:52. Contact: ###-####.
need bond for landscape or finish per plan, no formal inspection made 3/12/2001 11:16:40 AM
|
BLD-Grading Inspection | 3/6/2001 | 3/6/2001 | 3/6/2001 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete. The driveway, fine grading and revegetation have not been completed. For these the engineer has recommended a $5,700 bond. Upon receipt of this the grading and drainage is conditionally approved.
|
BLD-Framing/Rough-in | 11/10/2000 | 11/13/2000 | 11/13/2000 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 08:54:40. Contact: ###-####.
recieved engineer letter, ok to rock 11/13/2000 12:43:36 PM
|
BLD-Other | 11/13/2000 | 11/13/2000 | 11/13/2000 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 07:28:21. Contact: ###-####.
shear ok,, all 11/13/2000 10:32:07 AM
|
BLD-Other | 11/8/2000 | 11/8/2000 | 11/8/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/08/2000 at 08:02:00. Contact: ###-####.
waiting for engineer letter on framing, insulation ok 11/8/2000 2:09:58 PM
|
BLD-Energy code compliance | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 10:02:22. Contact: ###-####.
c/n posted, ok to insulate 10/27/2000 12:06:58 PM
|
BLD-Foundation | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | PASS |
Steven Webb
|
|
|
DARREN ###-####
|
BLD-Footing | 10/19/2000 | 10/20/2000 | 10/20/2000 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 12:52:56. Contact: ###-####.
retaining wall ftg side of house 10/20/2000 12:01:19 PM
|
BLD-Framing/Rough-in | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PART |
Tony Young
|
|
|
###-#### Bob
exterior shear nailing ok, need to look at interior later. 10/17/2000 1:55:32 PM
|
BLD-Other | 10/16/2000 | 10/16/2000 | 10/16/2000 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 10:00:15. Contact: ###-####. LAST CN NOT COMPLETED 10/16/2000 4:45:39 PM
|
BLD-Framing/Rough-in | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted ,, need eng. approval for hold downs 9/15/2000 11:18:50 AM
|
Override - Parcel Holds | | | 9/14/2000 | | |
|
|
|
|
BLD-Foundation | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | PART |
Tony Young
|
|
|
shawn ###-#### Appears ok work in progress 7/13/00 11:30:03 AM
|
Override - Parcel Holds | | | 7/12/2000 | | |
|
|
|
|
BLD-Footing | 7/10/2000 | 7/11/2000 | 7/11/2000 | P | PART |
Tony Young
|
|
|
###-#### Ok w/verbal- work in progress 7/12/00 10:39:07 AM
|
Override - Parcel Holds | | | 7/10/2000 | | |
|
|
|
|
Override - Parcel Holds | | | 6/29/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/29/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/27/2000 | | DONE |
|
|
|
two story restriction note removed from face of plat per Scott Spjute 06-26-2000
|
Inspection Record Card- Bld | | | 6/27/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/27/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2000 | | DONE |
|
|
|
###-####
|
Plan assigned to (DJO) | 6/14/2000 | 6/14/2000 | 6/26/2000 | | PASS |
Dan Overy
|
|
|
6/26/2000 14:12:41 DJO - activity updated through activity BLDA022 from case BLD00-01550.
|
Plan Reviewer's activity | | | 6/26/2000 | | DONE |
|
|
|
RECEIVED NEW REVISED STRUCTURAL SHEETS. OK TO ISSUE.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2000 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/26/2000 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/26/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/26/2000 | | DONE |
|
|
|
|
Plan Review Report | | | 6/26/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/14/2000 | | DONE |
|
|
|
eng. calcs did not indicated nailing or all of holdowns. information required for construction oc cmu fireplace and beam at main floor frame to carry concentrated load from stair catwalk. have received fax copy of new calcs but have not reviewed
|
Plans ACCEPTED BY PLAN CHECK | | | 6/14/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 5/31/2000 | 5/31/2000 | 6/1/2000 | | PASS |
|
|
|
|
Application received | | | 5/31/2000 | | |
|
|
|
|
Routing - PLANNING | 6/1/2000 | 6/1/2000 | | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/1/2000 | 6/1/2000 | | | PEND |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 5/31/2000 | 5/31/2000 | | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3.
|
Pending Assignment by DJO | 5/31/2000 | | | | PEND |
Dan Overy
|
|
|
|