Case Summary (BLD) | | | 7/2/2013 | | DONE |
|
|
|
|
Expired/Cancelled | | | 8/18/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/23/2002 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/3/2001 | | DONE |
|
|
|
|
BLD-Final | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 11:09:31. Contact: ###-####. ok for final upon plm sign off. 10/27/2000 2:14:28 PM
|
FIRE-Final Inspection | 10/26/2000 | 10/26/2000 | 10/26/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 11:07:42. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 10:21:00. Contact: ###-####. ceilling ok fire stpo at office side of elavador wall. 10/23/2000 2:35:04 PM
|
FIRE-Sprinkler Rough-in | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 10:23:27. Contact: ###-####. okay to cover 10/24/2000 8:01:00 AM
|
BLD-Framing/Rough-in | 10/6/2000 | 10/6/2000 | 10/6/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/06/2000 at 08:46:09. Contact: ###-####. Interior nonbearing walls in northeast corner ok for cover. Central core walls require opening/penetration protection before covering.
|
BLD-Framing/Rough-in | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | PART |
|
|
|
phil ###-#### r/i 2nd flool okto install inside of te new 1-hour wa;l room side 8/14/2000 2:49:09 PM
|
Plan resubmittals received | | | 8/3/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM ZGA ARCHITECTS, TWO SETS SHEET A-6 FORWARDED SAME TO PERRY PAINE. 8/3/00 DAR
|
BLD-Framing/Rough-in | 7/21/2000 | 7/24/2000 | 7/24/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 07/21/2000 at 13:22:54. Contact: ###-####. need to install door to space or build wall 7/24/2000 2:23:06 PMcalled the contr. Phill and let him know 7/24/2000 2:24:37 PM
|
Plan assigned to (MYS) | 6/8/2000 | 6/8/2000 | 6/28/2000 | | PASS |
Marlene Southard
|
|
|
6/28/2000 08:54:39 MYS - activity updated through activity BLDA022 from case BLD00-01553.
|
Received Certificate of Value | | | 6/28/2000 | | DONE |
|
|
|
Received revised certificate of value
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2000 | | PASS |
|
|
|
|
Print Occupancy Form | | | 6/28/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2000 | | DONE |
|
|
|
called Phil at ###-#### permit ready for pickup
|
Issue PAID IN FULL permit | | | 6/28/2000 | | DONE |
|
|
|
|
Routing - FIRE | 6/22/2000 | 6/27/2000 | 6/27/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 6/27/2000 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 6/12/2000 | | 6/22/2000 | | FAIL |
|
|
|
Sent copy of corrections via FAX transmittal to Dan Little at ZGA Architects.
|
Routing - PUBLIC WORKS | 6/8/2000 | | 6/12/2000 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 6/8/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 6/7/2000 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/5/2000 | | HOLD |
|
|
|
REQUIRES APPLICATION INFORMATION 1. FIRE SPRINKLER INFO TO BE COMPLETE
2. INVOLVED PARTIES SHEET NEEDS TO BE SIGNED
3. REQUIRES ARCH./ENG. FORM
4. REQUIRES COVER SHEET FOR PLANS WITH CODE DATA.
5. REQUIRES TWO COPIES OF PLANS FOR FLOOR 5.
FAXED INFORMATION TO DAN LITTLE OF ZGA AT ###-#### AND PHILIP ALLEN AT ###-#### KMM
PLANS IN MY HOLD BOX
|
Received Certificate of Value | | | 5/31/2000 | | DONE |
|
|
|
|
Application received | | | 5/31/2000 | | |
|
|
|
|