Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01574
StatusFinaled
Name PAUL WARING
Site Address 6051 N EAGLE
Project NameEAGLE MEDICAL BLDG. #2
Customer Number 
ePlanReviewNo
Description
EAGLE MEDICAL CENTER BUILDING #2 * TO CONSTRUCT A SINGLE STORY, 3,116 SQ.FT. MEDICAL OFFICE BUILDING WITH A 1,340 SQ.FT. BASEMENT, NOTE: THIS BUILDING IS FULLY FIRE SPRINKLERED FOR BASEMENT SEPARATION. FIRE SPRINKLER PLANS AND PERMITTING SHALL BE REQUIRED BEFORE ANY UNDERGROUND OR OVERHEAD WORK. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST AND CABO/ANSI A117.1. THE FOOTING/FOUNDATION PERMIT (BLD00-00120) AND GRADING PERMIT (BLD00-00159) HAVE ALREADY BEEN ISSUED. DRH99-00197 PC#413-00 MJP
Permit modified 10/11/00 to reflect, removal of fire sprinklers and add one-hour construction in the basement area per UBC Section 712. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/25/20036/25/20036/25/2003 DONE
Permanent Occupancy 5/23/20015/23/2001 DONE
Details
BLD-Final5/22/20015/23/20015/23/2001APASS
DetailsJim Sly
Dave ###-#### OK for perm Occ. 5/23/2001 10:21:42 AM
DOC - Permit Finaled5/23/20015/23/20015/23/2001APASS
DetailsJim Sly
Added by Inspector: 316 On 5/23/2001 10:22:38 AM
Permanent occupancy  5/23/2001 DONE
Perm. Occ. Cert. #8697 issued 5-23-01 to the Eagle Medical Bldg. #2.
Fee Review-notes6/2/20006/2/20004/25/2001 DONE
(F) Reprint permit  3/16/2001 DONE
Temporary occupancy  1/30/2001 PART
Temp. Occ. Cert. #4511 issued 1-30-01 to the Eagle Medical Center Bldg. #2.
BLD-Final1/11/20011/12/20011/12/2001APART
DetailsJim Sly
Dave ###-#### OK for temp Occ. C/N...Obtain Perm occ status within 90 days of this notice. 1/12/2001 10:40:55 AM
BLD-Final1/8/20011/9/20011/9/2001AFAIL
DetailsJim Sly
dave cell- ###-#### fn NR 1/9/2001 11:04:07 AM
FIRE-Final Inspection1/8/20011/9/20011/9/2001ACANC
DetailsJoe Tawney
fire fn -dave-- ###-#### cell Cancel Not ready 1/9/2001 12:48:53 PM
FIRE-Final Inspection1/9/20011/9/20011/9/2001PPASS
DetailsJoe Tawney
dave-- ###-#### fire fn Reinsp OK for permanant occupancy 1/10/2001 8:09:50 AM
BLD-Final12/29/20001/2/20011/2/2001PFAIL
DetailsTom Arcoraci
###-#### not ready 1/2/2001 3:29:27 PM
BLD-Final1/3/20011/2/20011/2/2001PFAIL
DetailsJoe Tawney
Added by Inspector: 406 On 1/3/2001 8:31:54 AM Final Fail C/N iaaued
BLD-Final12/21/200012/22/200012/22/2000PFAIL
DetailsJim Sly
###-####
BLD-Final12/21/200012/22/200012/22/2000PFAIL
DetailsJim Sly
###-####
FIRE-Final Inspection12/21/200012/22/200012/22/2000AFAIL
DetailsJoe Tawney
###-#### Final Fail C/N issued 12/29/2000 2:11:39 PM
BLD-Final12/21/200012/22/200012/22/2000PFAIL
DetailsJim Sly
BLD-Final12/21/200012/22/200012/22/2000PFAIL
DetailsJim Sly
C/N issued. 5/8 rock bsmnt walls/ceilings for usable space 20 Min self cl doors rated access doors ( ceiling) All Req signatures......... 12/22/2000 4:46:41 PM
Inspection Record Card- Bld  12/22/2000 DONE
Print Occupancy Form  12/22/2000 DONE
BLD-Conference12/21/200012/21/200012/21/2000PPART
DetailsJim Sly
Dave ###-####3
BLD-Conference12/21/200012/21/200012/21/2000PPART
DetailsJim Sly
Dave ###-####3
Print Occupancy Form  10/12/2000 DONE
Inspection Record Card- Bld  10/12/2000 DONE
Telephone call  10/12/2000 DONE
called permit ready and fees due
Plan Reviewer's activity  10/11/2000 PASS
Plans modified to remove fire sprinklers per UBC Section 712.
Override - Parcel Holds  10/11/2000  
Plan resubmittals received  10/4/2000 DONE
RECEIVED TWO COPIES OF REVISED SHEET A1. ROUTED TO MIKE P. KMM
BLD-Energy code compliance9/26/20009/26/20009/26/2000PPASS
DetailsJim Sly
Paul ###-#### Framing pass 9/26/2000 1:35:11 PM
BLD-Framing/Rough-in9/15/20009/15/20009/15/2000PPASS
DetailsJim Sly
FR -RAMO-- ###-####
BLD-Conference9/5/20009/6/20009/6/2000APART
DetailsJim Sly
paul warring-- ###-#### for conf Discussed 1hr wall detail. 9/6/2000 11:34:56 AM
BLD-Framing/Rough-in8/30/20008/30/20008/30/2000PFAIL
DetailsJim Sly
PAUL ###-#### FR C/N..Partial insp only...Architect to provide full detail for 1hr...Resubmit drawings to plan check dept. showing change to omit sprinklers and changes for "Usable space" in Bsmnt. 8/30/2000 1:01:11 PM
BLD-Conference8/22/20008/22/20008/22/2000PPART
DetailsJim Sly
###-#### will be on site
BLD-Conference8/17/20008/17/20008/17/2000PPART
DetailsJim Sly
Structure is firesprinkled the floor/ceiling doesn't require through or membrane protection only firestopping.
(F) Reprint permit  7/21/2000 DONE
Routing - PLAN CHECK7/20/2000 7/20/2000  
Plan Reviewer's activity  7/20/2000 PASS
Print Pending Permit.LaserJet4  7/20/2000 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/20/2000 DONE
Print Occupancy Form  7/20/2000 DONE
Inspection Record Card- Bld  7/20/2000 DONE
Issue PAID IN FULL permit  7/20/2000 DONE
Plan assigned to (M_P)6/6/2000 7/20/2000 PASS
DetailsMike Phillips
7/20/2000 10:00:15 M_P - activity updated through activity BLDA022 from case BLD00-01574.
Routing - FIRE7/19/20007/19/20007/19/2000 PASS
DetailsBill Alexander
Routing Off Site - STRUCTURAL7/7/2000 7/19/2000 PASS
REVISED SHEET A2 AND S3.1 SENT TO OUTSIDE ENG. PER PDQ. KMM
7/14/2000 received outside eng. plans routed to mike p. kmm
Routing - PLAN CHECK6/30/2000 7/19/2000  
Routing to fire for follow up review.
Plan Reviewer's activity  7/19/2000 PEND
Routing to fire for follow up review.
Plan resubmittals received  7/7/2000 DONE
RECEIVED FOUR COPIES OF REVISED SHEETS A2 S3.1 AND REVISED CERT. OF VALUE. ROUTED TO MIKE P. AND OUTSIDE ENG. KMM
Plan Reviewer's activity  7/6/2000 FAIL
Additional information required for third review. Waiting for out side engineering approval too.
Routing Off Site - STRUCTURAL6/29/2000 7/3/2000 FAIL
MIKE HAS SENT A COPY OF INHOUSE PLANS TO ENG. I HAVE ASKED FOR THEM BACK WHEN THEIR REVIEW IS COMPLETE. CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Additional informaiton required for further review. MJP
Routing - PLUMBING6/30/2000 6/30/2000 PASS
Routing - PLAN CHECK6/29/2000 6/30/2000  
Plan resubmittals received  6/30/2000 DONE
RECEIVED TWO COPIES OF REVISED P1 SHEET. ROUTED TO MIKE P. KMM
Routing - PLUMBING6/26/2000 6/29/2000 FAIL
Routing - PLAN CHECK6/21/2000 6/26/2000  
Routing to Plumbing.
Plan resubmittals received  6/23/2000 DONE
RECEIVED RESUBMITTAL SHEETS A0,A2,A3,A4,A5,E1,S0.1,S2.1,S4.1 AND FORWARDED TO MIKE PHILLIPS.
Routing - FIRE6/19/20006/21/20006/21/2000 PASS
DetailsBill Alexander
Routing - PLUMBING6/21/2000 6/21/2000 FAIL
Plan Review Completed(1st rev)  6/21/2000 FAIL
Routing - PLAN CHECK6/16/2000 6/19/2000  
Routing to Fire for review
Plan Reviewer's activity  6/19/2000 FAIL
Additional information required for follow up review. mjp
Routing Off Site - STRUCTURAL6/6/2000 6/19/2000 FAIL
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Additional information required for follow up review. mjp
Plan resubmittals received  6/16/2000 DONE
RECEIVED TWO COPIES OF P1 SHEET. ROUTED TO MIKE P. KMM
Routing - PLANNING6/13/2000 6/16/2000 PASS
x-ref. DRH99-197
Routing - PUBLIC WORKS6/6/2000 6/13/2000 PASS
Plans ACCEPTED BY PLAN TECH  6/7/2000 PASS
MIKE THE COVER SHEET I RECEIVED IS NOT STAMPED OR SIGNED. I TOLD GUY I WOULD EXCEPT AND THAT IF YOU ASK FOR RESUBS FOR THE PROJECT WE CAN GET IT THEN. THANKS. KMM
Plan resubmittals received  6/7/2000 DONE
RECEIVED TWO COPIES OF COVER SHEET. PUT WITH PLANS. KMM
Plan routing begun/NEW & ADDTN  6/6/2000  
Plans ACCEPTED BY PLAN TECH  6/6/2000 FAIL
REQUIRES 1. ARCH./ENG. RECORD FORM TO BE SIGNED BY THE ARCH.
2. REQUIRES TWO COPIES OF COVER SHEET DRAWINGS WITH CODE DATA.
3. VICINITY MAP
4. SITE PLAN
FAXED INFORMATION TO GUY ROBERTSON 6/6/2000 KMM
6/7/2000 1. RECEIVED ARCH. ENG. RECORD FORM.
2. RECEIVED COVER SHEET WITH DATA.
3. RECEIVED VICINITY MAP.
4. RECEIVED SITE PLAN
Received Certificate of Value  6/2/2000 PASS
Application received  6/2/2000  
Recd Pcfee & Taken To Pln CK