Fee Review-notes | 6/2/2000 | 6/2/2000 | 4/19/2001 | | DONE |
|
|
|
|
BLD-Final | 10/3/2000 | 10/3/2000 | 10/3/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/3/2000 ok for c/o pend fire
|
Permanent Occupancy | | 10/3/2000 | 10/3/2000 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 10/3/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8422 issued 10-3-00 to Contract Supplement Packaging.
|
FIRE-Final Inspection | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK for permanant occupancy 10/2/2000 12:23:29 PM
|
BLD-Final | 9/27/2000 | 9/29/2000 | 9/29/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-####, c/n: fire corrections, address, sign, partition bracing, install all glazing. ok for t/o pend fire ok 9/29/2000 11:40:05 AM
|
FIRE-Final Inspection | 9/27/2000 | 9/28/2000 | 9/28/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Fail C/N issued 9/29/2000 12:07:37 PM
|
BLD-Framing/Rough-in | 9/21/2000 | 9/22/2000 | 9/22/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### 9/22/2000 12:03:44 PM q and a room int room for shop framing ok 9/22/2000 2:12:07 PM
|
BLD-Framing/Rough-in | 9/6/2000 | 9/6/2000 | 9/6/2000 | P | PART |
Carl Dependahl
|
|
|
dave-- ###-#### fr , c/n re grid, spec insp o to cover walls9/6/2000 12:01:50 9/6/2000 12:04:39 PM
|
BLD-Framing/Rough-in | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PART |
Carl Dependahl
|
|
|
Dave; ###-#### ok to insul only, has htgc/n 9/5/2000 1:14:49 PM
|
BLD-Framing/Rough-in | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/28/2000 int shear ok except at mech rm walls cut for comb air
|
BLD-Framing/Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PART |
Carl Dependahl
|
|
|
Dave ###-####; ok to fasten gyp at mezz. shearwall only 8/14/2000 9:36:52 AM
|
BLD-Footing | 7/3/2000 | 7/5/2000 | 7/5/2000 | A | PART |
Jim Sly
|
|
|
###-#### Center column pads OK pending spec. insp appr (STRATA)...Job locate just W. of T/A Co. 7/5/00 10:09:23 AM
|
Issue PAID IN FULL permit | | | 6/30/2000 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/27/2000 | | 6/29/2000 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 6/8/2000 | | 6/29/2000 | | PASS |
Jason Blais
|
|
|
|
Routing - PLAN CHECK | 6/29/2000 | | 6/29/2000 | | PASS |
|
|
|
Plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/29/2000 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/29/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/29/2000 | | DONE |
|
|
|
|
Telephone call | | | 6/29/2000 | | DONE |
|
|
|
called Gayle Jensen at ###-#### permit ready for pickup
|
Routing - FIRE | 6/21/2000 | 6/26/2000 | 6/26/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 6/26/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 6/23/2000 | | DONE |
|
|
|
PLAN RESUBMITTALS SHEETS A-1, A-2, A-3 AND S-3 FORWARDED TO JASON. MYS
|
Plan resubmittals requested | | | 6/21/2000 | | PEND |
|
|
|
Plan resubmittals and response required for further review.
|
Routing - PLAN CHECK | 6/12/2000 | | 6/21/2000 | | FAIL |
|
|
|
Plan review report faxed to architect, contractor, and engineer. Resubmittal drawings and response required for further review. Plans need to route to fire and public works.
|
Routing - PUBLIC WORKS | 6/8/2000 | | 6/12/2000 | | FAIL |
|
|
|
REQUIRES DRAINAGE PLAN. PER BRIAN M. KMM
|
Plan routing begun/TENANTS | | | 6/8/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLAN CHECK and FIRE. Central District Health approval signed off by Steve Elmer.
|
Pending Assignment by MYS | 6/8/2000 | | 6/8/2000 | | DONE |
Marlene Southard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/7/2000 | | PASS |
|
|
|
STEVE ELMER WILL BE IN TODAY TO SIGN OFF ON PLANS. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 6/6/2000 | | HOLD |
|
|
|
6/6/2000 SPOKE WITH CAROL J. FOR CDH REVIEW. SHE FELT CDH SHOULD LOOK AT PLANS. I CONTACTED GAYLE JENSEN ABOUT GETTING CDH APPROVAL. I GAVE GAYLE, STEVE ELMERS NUMBER. I AM REQUESTING A LETTER FROM STEVE SAYING HE DOES NOT NEED TO REVIEW, OR HAVE HIM, OR CAROL J. SIGN OFF ON THE PLANS.
2. I CANNOT READ THE ARCH. SIGNATURE ON SHEETS A-1 AND A-2. LEFT A MESSAGE WITH JEFF HULL TO EITHER RESUBMIT OR COME IN AND RESIGN THE SHEETS.
3. HAVE ASKED GAYLE TO FAX OVER SOME CODE DATA. FIRE ALARM SYSTEM AND SMOKE CONTROL SYSTEM INFORMATION.
FAXED GAYLE JENSEN AT ###-#### FOR ABOVE INFORMATION. KMM
6/7/2000 GAYLE JENSEN CALLED. HE IS FAXING OVER A LETTER FROM CDH, STATING THEIR APPROVAL. HE WILL ALSO FAX OVER A STATEMENT ABOUT FIRE CODE DATA ISSUES. HE WILL RUN DARKER COPIES OF ARCH. SHEETS.
I AM READY TO ROUTE TO MARLENE AS SOON AS CDH SIGNS OFF. STEVE ELMER WILL BE IN TO SIGN OFF ON PLANS. KMM
|
Received Certificate of Value | | | 6/2/2000 | | PASS |
|
|
|
|
Application received | | | 6/2/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|