Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-01630
StatusFinaled
Name TRUAX COMPANY
Site Address 2463 E EASTDALE DR
Project NameHILLSIDE
Customer Number327-0903
ePlanReviewNo
Description
To construct a 3619 sq. ft. two story single family dwelling with a 856 sq. ft. attached three car garage, a 144 sq. ft. covered entry porch and a 338 sq. ft. covered concrete patio per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 2966 sq. ft.)(2nd floor 653 sq. ft.) This lot is within a hillside area and is subject to the hillside ordinance. Class "A" roof system will be installed. PC #523 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/10/20021/10/20021/10/2002PPASS
DetailsSteven Webb
justin ###-#### 1/10/2002 c. of c. #20975 issued. 1/10/2002 3:39:05 PM
DOC - Permit Finaled1/10/20021/10/20021/10/2002PPASS
DetailsSteven Webb
Finaled by inspector at 1/10/2002 3:39:20 PM
BLD-Final1/7/20021/8/20021/8/2002AFAIL
DetailsJim Storey
###-#### JUSTIN address numbers/ floor joist unsupported w/ single top plate/ perimitor insulation not instaled to bottom of sub-flooring/canlights-recp-plm traps not sealed or gasketed to meet engery code/ fire place permit exp. needs work completed and permit reaplied for prior to insp./ east garage door east side veneer strucral failure remove to have investagation of cause. 1/8/2002 10:35:02 AM
BLD-Grading Inspection12/31/200112/31/200112/31/2001 PASS
DetailsRita DeYoung
Final grading and drainage approved.
BLD-Energy code compliance1/18/20011/18/20011/18/2001PPASS
DetailsTony Young
###-####
ok to rock 1/18/2001 2:26:39 PM
BLD-Framing/Rough-in1/18/20011/18/20011/18/2001PPART
DetailsTony Young
Added by Inspector: 415 On 1/18/2001 2:26:06 PM
BLD-Framing/Rough-in1/10/20011/10/20011/10/2001PFAIL
DetailsSteven Webb
Rob ###-#### prior c/n dated 12/06/00 not completed, additional c/n issued. 1/10/2001 2:52:45 PM
BLD-Framing/Rough-in12/6/200012/6/200012/6/2000PFAIL
DetailsTony Young
###-####
c/n posted 12/6/2000 3:21:27 PM
BLD-Framing/Rough-in11/30/200011/30/200011/30/2000PPART
DetailsTony Young
shear panel Rob ###-####
shear ok 11/30/2000 12:50:27 PM
BLD-Framing/Rough-in11/28/200011/28/200011/28/2000ACANC
DetailsTony Young
shear insp ###-####
wants pm not am 11/28/2000 11:11:42 AM
BLD-Framing/Rough-in11/28/200011/28/200011/28/2000PPASS
DetailsSteven Webb
Scheduled by Inspector: 415 On 11/28/2000 11:09:00 AM int. shear, Bob ###-####Inside shear only 11/28/2000 1:50:14 PM , not framing. 11/28/2000 1:50:30 PM
BLD-Framing/Rough-in9/6/20009/7/20009/7/2000APART
DetailsTony Young
shear insp Jeff ###-####
outside shear ok 9/7/2000 2:44:15 PM
BLD-Framing/Rough-in9/5/20009/6/20009/6/2000AFAIL
DetailsTony Young
###-####
c/n posted on shear panels,, outside shear insp. only. 9/6/2000 1:34:01 PM
Override - Parcel Holds  9/6/2000  
Override - Parcel Holds  9/5/2000  
BLD-Foundation7/13/20007/14/20007/14/2000APART
DetailsTony Young
###-#### Work in progress 7/14/00 2:48:19 PM
BLD-Footing7/12/20007/13/20007/13/2000APART
DetailsTony Young
tony ###-#### ft All appears ok. Work in progress. 7/14/00 8:58:57 AM
Override - Parcel Holds  7/13/2000  
BLD-Footing7/12/20007/12/20007/12/2000PFAIL
DetailsTony Young
late pm ###-#### Not ready- need soil report/engineering. 7/13/00 11:30:21 AM
Override - Parcel Holds  7/12/2000  
Override - Parcel Holds  7/12/2000  
Override - Parcel Holds  7/11/2000  
Issue PAID IN FULL permit  7/11/2000 DONE
Plan assigned to (DJO)6/28/20006/28/20006/28/2000 PASS
DetailsDan Overy
6/28/2000 15:06:18 DJO - activity updated through activity BLDA022 from case BLD00-01630.
PLANS/APPL TAKEN TO FRONT DESK  6/28/2000 DONE
Inspection Record Card- Bld  6/28/2000 DONE
Telephone call  6/28/2000 DONE
called permit ready and fees due and need an extra site plan
Plan Review Report  6/28/2000 DONE
Case Summary (BLD)  6/28/2000 DONE
Plans ACCEPTED BY PLAN CHECK  6/28/2000  
Routing - PLANNING6/8/20006/8/20006/9/2000 PASS
Routing - PUBLIC WORKS6/6/20006/6/20006/8/2000 PASS
Routing - PUBLIC WORKS GRADING6/6/20006/6/20006/8/2000 DONE
DetailsRita DeYoung
Approved as Category 3 with conditions of approval in letter attached to plan.
Application received  6/6/2000  
no early start hillside
Routing - PLAN CHECK6/9/20006/9/2000  PEND
Pending Assignment by DJO6/6/2000   PEND
DetailsDan Overy