Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD00-01631
StatusFinaled
Name ADELMAN BUILDING
Site Address 622 -24 W IDAHO ST
Project NameADELMAN BLDG-SHELL
Customer Number 
ePlanReviewNo
Description
ADELMANN BUILDING SHELL AND CORE UPGRADE : WORK TO INCLUDE, FIRE SPRINKLER SYSTEM EXTENSION INTO THE REMAINING TWO NEW EXTERIOR STAIRS TO ACCESS TO BASEMENT OFF CAPITOL BLVD. SIDE, NEW STREET SCAPE, EXCAVATE & LOWER BASEMENT FLOOR THREE FEET, CONSTRUCTION OF TWO NEW RESTROOMS IN BASEMENT AREA, REMOVE AND REPLACE STRUCTURAL SUPPORTING COLUMNS AND BEAMS IN BASEMENT, REMOVAL OF THE STAIRWAY ON THE CAPITOL BLVD SIDE TO THE SECOND FLOOR, UPGRADE THE EXISTING STAIRS AND ENCLOSURE ON NORTHEAST SIDE OF BUILDING, CONSTRUCT NEW ONE-HOUR FIRE-RESISTIVE SHAFT FOR POSSIBLE FUTURE GREASE DUCT ENCLOSURE, NEW FIRE SPRINKLERS BEING INSTALLED THROUGH OUT BUILDING FOR ONE-HOUR SUBSTITUTION, FLOOR OPENING BEING INFILLED TO SEPARATE FIRST FLOOR FROM BASEMENT, NEW ELEVATOR, ELEVATOR SHAFT ENCLOSURE & SMOKE DOORS, ALL WORK IS FOR FUTURE TENANTS. NO NEW OCCUPANCY UNDER THIS PERMIT SEPARATE APPLICATIONS AND PERMITS REQUIRED FOR NEW TENANT OCCUPANCYS. NOTE: THE BASEMENT AREA IS CURRENTLY FIRE SPRINKLERED AND IS TO REMAIN FULLY OPERATIONAL DURING CONSTRUCTION. FIRE SPRINKLER ADDITIONS AND MODIFICATIONS SHALL REQUIRE PLANS AND PERMIT APPROVAL PRIOR TO ANY RELATED WORK. (PC#445-00) (DRH 99-00114) (PLAN MODIFICATION 6-05-01) THE RESTROOMS HAVE BEEN ROUGHED IN BUT NO PARTITIONS HAVE BEEN CONSTRUCTED IN THE BASEMENT. SEPARATE APPLICATIONS, PLANS AND PERMITS ARE REQUIRED FOR ANY NEW WORK OR OCCUPANCY APPROVAL OF THE BASEMENT. 6-05-01 *RMH*
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/19/2008  
Case Summary (BLD)  11/10/2005  
Fee Review-notes6/6/20006/6/20008/30/2002 DONE
Letter of compliance  8/2/2002 DONE
Letter of Compliance #22555 issued 8-2-02.
BLD-Final8/1/20028/1/20028/1/2002 PASS
DetailsCarl Dependahl
All work appears complete, rooftop screen in place, rails installed, ok for perm. occ. (L/C?)
CHANGE STATUS TO (ISS)  8/22/2001 DONE
CHANGED TO ISSUED STATUS-ALREADY PD
BLD-Conference6/8/20016/8/20016/8/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/8/2001 2:35:12 PM ok for t/o, keep c/n
Inspection Record Card- Bld  6/7/2001 DONE
Print Occupancy Form  6/7/2001 DONE
Telephone call  6/7/2001 DONE
left mess that permit is ready
Receive PAYMENT IN FULL PRINT  6/7/2001 DONE
BLD-Conference6/5/20016/5/20016/5/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/5/2001 9:47:00 AM w/ kim re other oks
Case Summary (BLD)  6/5/2001 DONE
Routing - PUBLIC WORKS6/1/2001 6/5/2001 DONE
Plan modification of 6/1/01
Plan assigned to (R_H)6/1/2001 6/5/2001 PASS
Details
Plan Modification.
Plans ACCEPTED BY PLAN TECH  6/1/2001 DONE
Plan modification
Waiting for Cert. of Value  6/1/2001 DONE
Plan modification
Plan routing begun/TENANTS  6/1/2001 DONE
plan modification:
BLD-Final5/30/20015/31/20015/31/2001PPART
DetailsCarl Dependahl
###-####; keep c/n, ok for t/o only 5/31/2001 11:25:57 AM
Temporary occupancy  5/31/2001 PART
Temp. Occ. Cert. #4553 issued 5-31-01 to the Adelmann Bldg. shell & core.
Plan Modification Accepted  5/31/2001 DONE
CHANGE STATUS TO (PND)  5/31/2001 DONE
PLAN MOD
BLD-Final5/29/20015/30/20015/30/2001AFAIL
DetailsCarl Dependahl
Kim ###-####, need achd, complete previous items...handrails, firestops, etc. 5/30/2001 1:38:02 PM
BLD-Final5/25/20015/29/20015/29/2001ANR
DetailsCarl Dependahl
need verify bond or p&z ok for roof top equip. 5/30/2001 9:14:19 AM
BLD-Final5/24/20015/25/20015/25/2001PNR
DetailsCarl Dependahl
early afternoon Tim ###-#### this was the test you can cancl this insp. you talked to kim fri. 5/25/2001 2:26:28 PM...nr, recall 5/25/2001 2:46:10 PM
FIRE-Final Inspection5/18/20015/18/20015/18/2001PFAIL
DetailsRick Jackson
1:30 ###-#### duct detectors for damper control not tied to system; backflow peventer cycling; c/n issued 5/21/2001 7:11:28 AM
BLD-Conference5/18/20015/18/20015/18/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/18/2001 1:12:19 PM w/ Tempra, need resolve historical issues
BLD-Final5/17/20015/18/20015/18/2001AFAIL
DetailsCarl Dependahl
###-####, need fire, eng's ok letter, complete ha 5/18/2001 1:17:05 PM ndrails as need, etc, recall 5/18/2001 1:17:24 PM
BLD-Conference5/17/20015/17/20015/17/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/17/2001 12:34:20 PM w/ Kim, call for insp of shafts, rails
BLD-Conference5/17/20015/17/20015/17/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 5/17/2001 4:59:43 PM w/325 & Tim H. re p& z ok
FIRE-Conference5/17/20015/17/20015/17/2001PPASS
DetailsRick Jackson
###-#### discussed requirements for final inspection with contractor and Carl D. 5/17/2001 3:16:32 PM
BLD-Framing/Rough-in5/17/20015/17/20015/17/2001PPART
DetailsCarl Dependahl
###-#### ok to close hvac shaft at bsmt; posted do not occupy...need p&z ok re rooftop 5/17/2001 4:58:16 PM
BLD-Conference3/21/20013/21/20013/21/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/21/2001 10:54:27 AM w/ supt...repair of crack at north side..need eng's spec
BLD-Framing/Rough-in3/5/20013/6/20013/6/2001APART
DetailsCarl Dependahl
for drain insp-- kim ###-#### ; drain at stairs ok; keep c/n for struct items; need proper assembly for dropped ceiling at 2nd fl. & verification of "wall finish" per specs 3/6/2001 9:00:20 AM
BLD-Conference3/5/20013/5/20013/5/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/5/2001 3:31:24 PM w/ Ron re submittal for int finish.
BLD-Conference3/2/20013/2/20013/2/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/2/2001 9:13:52 AM w/ Ron Hill re eng's notes & reports...awaiting resolution to new issues: cracks found at old masonry apparently not anticipated or noted...
BLD-Framing/Rough-in2/27/20012/27/20012/27/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/27/2001 3:08:53 PM wip. need omplete 1hr lid & wrap at 1hr stair enclosure & part bsmt lid...chk riser/mech room reqs at bsmt
Plan resubmittals received  2/23/2001 DONE
Received Small documents from Bruce Poe, forwarded same to Ron Hill. 2/23/01 DAR
BLD-Conference2/20/20012/20/20012/20/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/20/2001 10:53:22 AM w/ Ron H... met w/ arch, rec'd eng's insp reports as req'd, need verify in field for modifications
BLD-Conference2/12/20012/12/20012/12/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/12/2001 4:50:07 PM w/ Ron...need eng's reports
BLD-Conference2/7/20012/7/20012/7/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/7/2001 4:22:50 PM w/ contractor & Ron Hill onsit, verbal c/n : submit eng's & spec. insp. reports; need report for framing substitutions timberstrand for M>Lams, fasten joists added at south portion of bsmt
BLD-Conference1/22/20011/22/20011/22/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/22/2001 2:47:22 PM shell of Adelmann bldg, questions re: eng's reports (not sent?) configuration of select framing at basement/2nd fl...verify; need special insp reports for conc, etc
BLD-Foundation12/7/200012/8/200012/8/2000APART
DetailsCarl Dependahl
reenforcing steel ###-####...south portion of reinforced slab; keyway & bar ok. abuts new ext fdn wall. 12/8/2000 10:52:23 AM
BLD-Foundation10/24/200010/24/200010/24/2000PPART
DetailsJim Storey
Jim ###-#### rebaR OK FOUR CORNERS OF BASEMENT PENDING SPECIAL INSP. AND REPORT. 10/24/2000 4:52:08 PM
BLD-Footing9/14/20009/14/20009/14/2000PPART
Details
FT INSP--TIM -###-#### fot the elevator shaft footing 9/14/2000 11:31:38 AM
BLD-Footing9/7/20009/8/20009/8/2000APART
Details
###-#### footings placed at this time ok to pour pending sp insp blessing 9/8/2000 10:47:51 AM
(F) Reprint permit  9/6/2000 DONE
Routing - PLAN CHECK7/28/2000 8/21/2000 PASS
DetailsRon Hill
PLANS/APPL TAKEN TO FRONT DESK  8/21/2000 PASS
DetailsRon Hill
Inspection Record Card- Bld  8/21/2000 DONE
Print Occupancy Form  8/21/2000 DONE
Telephone call  8/21/2000 DONE
called Jim Cambell at ###-####
Issue PAID IN FULL permit  8/21/2000 DONE
Plan assigned to (R_H)6/26/2000 8/21/2000 PASS
Details
8/21/2000 09:05:41 RMH - activity updated through activity BLDA022 from case BLD00-01631.
Plan resubmittals received  8/7/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM COLE AND ASSOCIATES, BRUCE POE, SMALL DOCUMENTS AND A,S, P, AND E SHEETS. FORWARDED SAME TO RON HILL. 8/7/00 DAR
Routing - FIRE7/24/20007/27/20007/27/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  7/27/2000 FAIL
Routing - PLAN CHECK7/17/2000 7/24/2000 FAIL
DetailsRon Hill
ROUTE TO FIRE DEPARTMENT
Routing - PLAN CHECK7/18/2000 7/24/2000 PEND
Plan Reviewer's activity  7/24/2000 FAIL
DetailsRon Hill
FAXED REQUIREMENTS TO ARCHITECT, ROUTE TO FIRE DEPARTMENT.
Routing Off Site - STRUCTURAL6/26/2000 7/18/2000 PEND
ROUTED REVISED DRAWING RECEIVED ON 6/26/00 TO OUTSIDE ENG. KMM
Routing - PLUMBING7/11/2000 7/14/2000 PASS
per plans and 97 upc
Plan resubmittals received  7/13/2000 DONE
RECEIVED THREE COPIES OF REVISED SHEETS S-0 AND S-3. THREE COPIES OF RESPONSE LETTER. ROUTED TO RON HILL. KMM
Routing - PLANNING6/28/2000 7/11/2000 PASS
Approved per building permit plans and as noted on sheet A.2 (P & Z note states that proposed guard rail is not approved and a new design must be reviewed and approved prior to occupancy).
Routing - PUBLIC WORKS6/26/2000 6/28/2000 PASS
Plan routing begun/TENANTS  6/26/2000 DONE
Route to PUBLIC WORKS, PLANNING, PLUMBING, PLAN CHECK and FIRE. Route to outside engineering.
Pending Assignment by MYS6/26/2000 6/26/2000 DONE
DetailsMarlene Southard
Plan resubmittals received  6/26/2000 DONE
RECEIVED THREE REVISED SETS OF PLANS WITH PLUMBING SHEETS P1.0 AND P2.0. ROUTED ONE COPY TO OUTSIDE ENG. AND TWO COPIES TO MARLENE. KMM
Plans ACCEPTED BY PLAN TECH  6/26/2000 PEND
STILL MISSING SOILS REPORT
Plans ACCEPTED BY PLAN TECH  6/9/2000 HOLD
REQUIRES 1. SOILS REPORT LISTED IN STRUCT. CALCS.
2. STAMPED AND SIGNED PLUMB. PLANS TWO COPIES
3. FULLY DIMENSIONED PLANS.
4. BUILDING CODE DATA
PLANS IN HOLD BOX. FAXED INFORMATION TO BRUCE POE. KMM
6/12/2000 SPOKE WITH BRUCE ABOUT ABOVE INFORMATION. KMM
Application received  6/6/2000  
Recd Pcfee & Taken To Pln CK     
Routing Off Site - STRUCTURAL6/9/2000    
CONTACTED PDQ TO TAKE TO OUTSIDE ENG. KMM
Routing - PLAN CHECK     
Plan Modification of 6/1/01