Fee Review-notes | 6/25/2003 | 6/25/2003 | 6/25/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 5/23/2001 | 5/23/2001 | | DONE |
|
|
|
|
BLD-Final | 5/22/2001 | 5/23/2001 | 5/23/2001 | A | PASS |
Alan Hauser
|
|
|
ok for permenant occ., as per #316 5/23/2001 9:31:11 AM
|
Permanent occupancy | | | 5/23/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8698 issued 5-23-01 to the Eagle Medical Building #3.
|
Telephone call | | | 5/22/2001 | | DONE |
|
|
|
Called Dave Waring @ ###-#### & left msg. re: status of temp. occ.
|
Code Occupancy Approval | | | 4/30/2001 | | FAIL |
|
|
|
Need street trees at Eagle Frontage - need arbs or other plantings at the locations for mec. units.
|
Fee Review-notes | 6/7/2000 | 6/7/2000 | 4/25/2001 | | DONE |
|
|
|
|
Temporary occupancy | | | 4/2/2001 | | PART |
|
|
|
Temp. Occ. cert. #4532 issued 4-2-01 to the Eagle Medical Properties, east side tenant.
|
(F) Reprint permit | | | 3/16/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK FOR PERMANANT OCCUPANCY 3/9/2001 12:40:40 PM
|
BLD-Final | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PART |
Jim Sly
|
|
|
###-#### OK for Temp Occ....C/N..Need ADA counter at reception counter and Need Perm Occ status within 90 days of this notice. Public works OK'd ....Phoned to tell me. 3/9/2001 1:38:27 PM
|
BLD-Final | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | CANC |
Jim Sly
|
|
|
###-####
|
FIRE-Final Inspection | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | CANC |
Joe Tawney
|
|
|
###-#### Cancel not ready 3/8/2001 5:20:09 PM
|
BLD-Final | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | CANC |
Jim Sly
|
|
|
###-####
|
BLD-Final | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### ###-####323 3/7/2001 2:33:27 PM Need Req. signatures.....Warned of glazing within 18" of floor. 3/7/2001 2:34:33 PM
|
FIRE-Final Inspection | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 3/8/2001 8:17:57 AM
|
BLD-Conference | 2/1/2001 | 2/2/2001 | 2/2/2001 | A | CANC |
Jim Sly
|
|
|
dave ###-#### Cancelled by Dave (superinten). 2/1/2001 5:17:11 PM
|
Temporary occupancy | | | 1/30/2001 | | PART |
|
|
|
Temp. Occ. Cert. #4512 issued 1-30-01 to the Eagle Medical Center Bldg. #3.
|
BLD-Framing/Rough-in | 1/12/2001 | 1/12/2001 | 1/12/2001 | P | PASS |
Jim Sly
|
|
|
###-#### DAve Frame OK except stairs....Will check a final. 1/12/2001 11:57:26 AM
|
BLD-Final | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Jim Sly
|
|
|
###-#### OK for Temp Occ....West 1/2 of bldg only C/N Complete entire bldg & obtain Perm Occ within 120 days. 1/10/2001 6:01:04 PM
|
BLD-Final | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | FAIL |
Jim Sly
|
|
|
dave ###-#### cell fn NR 1/9/2001 11:03:33 AM
|
FIRE-Final Inspection | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | CANC |
Joe Tawney
|
|
|
cell ###-#### dave fire fn Cancel Not ready 1/9/2001 12:48:32 PM
|
FIRE-Final Inspection | 1/9/2001 | 1/9/2001 | 1/9/2001 | P | PASS |
Joe Tawney
|
|
|
dave ###-#### fn fire Reinsp OK for permanant occupancy 1/10/2001 8:09:09 AM
|
BLD-Other | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 18:26:50. Contact: ###-####.
|
BLD-Final | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 18:27:28. Contact: ###-####.
|
BLD-Final | 1/4/2001 | 1/3/2001 | 1/3/2001 | P | FAIL |
Joe Tawney
|
|
|
Added by Inspector: 406 On 1/4/2001 8:09:07 AM Final Fail C/N issued
|
BLD-Framing/Rough-in | 12/29/2000 | 1/2/2001 | 1/2/2001 | P | FAIL |
Tom Arcoraci
|
|
|
early pm Dave ###-#### cn issued 1/2/2001 3:28:15 PM
|
BLD-Final | 12/29/2000 | 1/2/2001 | 1/2/2001 | P | FAIL |
Tom Arcoraci
|
|
|
not ready 1/2/2001 3:28:31 PM
|
FIRE-Final Inspection | 12/29/2000 | 1/2/2001 | 1/2/2001 | P | FAIL |
Joe Tawney
|
|
|
Fail Not ready 1/3/2001 8:28:13 AM
|
Inspection Record Card- Bld | | | 12/22/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/22/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/22/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/22/2000 | | DONE |
|
|
|
|
BLD-Conference | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Jim Sly
|
|
|
###-#### DAve
|
BLD-Conference | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Jim Sly
|
|
|
###-#### DAve
|
CHANGE STATUS TO (ISS) | | | 12/21/2000 | | DONE |
|
|
|
plan modification accepted paid additional fees...
|
Receive PAYMENT IN FULL | | | 12/1/2000 | | DONE |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 12/1/2000 | | DONE |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 12/1/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/27/2000 | | 11/30/2000 | | PASS |
|
|
|
PLAN MODIFICATION
|
Plan Reviewer's activity | | | 11/30/2000 | | PASS |
|
|
|
MODIFICATION * Plans approved as noted.
|
Override - Parcel Holds | | | 11/30/2000 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2000 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 10/20/2000 | | 11/30/2000 | | PASS |
Mike Phillips
|
|
|
11/30/2000 13:08:47 M_P - activity updated through activity BLDA022 from case BLD00-01634.
|
Routing - FIRE | 11/22/2000 | 11/27/2000 | 11/27/2000 | | PASS |
Bill Alexander
|
|
|
MODIFICATION *
|
Routing - PLAN CHECK | 11/7/2000 | | 11/22/2000 | | |
|
|
|
MODIFICATION * Routing to fire.
|
Plan resubmittals received | | | 11/21/2000 | | DONE |
|
|
|
PLAN MODIFICATION * Received four copies of revised sheets P2 and A2. Routed to Mike P. KMM
|
Routing - PLUMBING | 11/7/2000 | | 11/7/2000 | | PASS |
|
|
|
PLAN MODIFICATION medical gas piping must be type K or L copper cleaned for oxygen service, all joints must be brazed using a nitrogen purge, min. vacuum pipe size is 1", provide a floor sink for the vacuum pump discharge, additional cross connection protection may be required.
|
Routing - FIRE | 11/1/2000 | 11/6/2000 | 11/6/2000 | | FAIL |
|
|
|
PLAN MODIFICATION. Need clarification and notes on requirements of medical gas room ventilation and sprinkler coverage per UFC 74.
|
BLD-Energy code compliance | 11/1/2000 | 11/2/2000 | 11/2/2000 | P | PART |
Jim Sly
|
|
|
BLD 3\ ###-#### For main floor west tenant space ONLY...Frame OK too. 11/2/2000 2:25:34 PM 11/2/2000 2:26:59 PM
|
Routing - PLAN CHECK | 10/26/2000 | | 11/1/2000 | | |
|
|
|
PLAN MODIFICATION Routing to fire.
|
Plan Reviewer's activity | | | 11/1/2000 | | FAIL |
|
|
|
MODIFICATION * Additional information required for further review of medical gas room.
|
Override - Parcel Holds | | | 11/1/2000 | | |
|
|
|
|
BLD-Framing/Rough-in | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | FAIL |
Jim Sly
|
|
|
BLD # 3------MATT -###-#### Main flr West side....C/N Penitr Tenant Dem wall. 10/30/2000 10:39:55 AM
|
Override - Parcel Holds | | | 10/27/2000 | | |
|
|
|
|
Routing - PLUMBING | 10/23/2000 | | 10/26/2000 | | FAIL |
|
|
|
PLAN MODIFICATION
|
BLD-Framing/Rough-in | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | NR |
Jim Sly
|
|
|
BUILDING 3 WEST SIDE OF MED BUILDING NR 10/25/2000 11:04:25 AM
|
Telephone call | | | 10/24/2000 | | DONE |
|
|
|
CAN HAVE INSPECTION AS LONG AS IT HAS NOTHING TO DO WITH THE PLUMBING FOR THE DENTAL OFFICE AND THE 1 HOUR OCC FOR MEDICIAL GAS PER MIKE PHILLIPS AND JIM SLY UNTIL PLAN MOD HAS BEEN RELEASED.RAD
|
Override - Parcel Holds | | | 10/24/2000 | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/20/2000 | | 10/23/2000 | | PASS |
|
|
|
PLAN MODIFICATION
|
Plan routing begun/NEW & ADDTN | | | 10/20/2000 | | DONE |
|
|
|
PLAN MODIFICATION.
|
CHANGE STATUS TO (PND) | | | 10/20/2000 | | DONE |
|
|
|
plan modification accepted $500 paid 10-19-00
|
Plan Modification Accepted | | | 10/20/2000 | | DONE |
|
|
|
PLAN MODIFICATION. BLDG. #3 ADDING DENTAL GAS AND PLUMBING.
SHEETS A1, A2, P1, P2. KMM
|
BLD-Framing/Rough-in | 10/16/2000 | 10/17/2000 | 10/17/2000 | A | FAIL |
Jim Sly
|
|
|
Matt ###-####2 Need all trade R/I approvals. 10/17/2000 10:29:49 AM
|
Override - Parcel Holds | | | 10/16/2000 | | |
|
|
|
|
Print Occupancy Form | | | 10/12/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2000 | | DONE |
|
|
|
|
Telephone call | | | 10/12/2000 | | DONE |
|
|
|
called permit ready
|
Plan Reviewer's activity | | | 10/11/2000 | | PASS |
|
|
|
Removal of fire sprinklers and add one-hour construction in basement area per UBC Section 712. MJP
|
Override - Parcel Holds | | | 10/11/2000 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/11/2000 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/3/2000 | 10/4/2000 | 10/4/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### 861- 0564 Need all trade finals and resolve plan change from bsmnt sprinklers to Usable space. 10/4/2000 10:06:49 AM
|
Plan resubmittals received | | | 10/4/2000 | | DONE |
|
|
|
RECEIVED THREE COPIES OF REVISED SHEET A1. ROUTED TO MIKE P. KMM
|
BLD-Conference | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PART |
Jim Sly
|
|
|
Ramo ###-#### Mech/frame questions. 9/15/2000 9:59:02 AM
|
BLD-Framing/Rough-in | 9/15/2000 | 9/15/2000 | 9/15/2000 | P | PART |
Jim Sly
|
|
|
Shear OK 9/15/2000 2:09:09 PM
|
(F) Reprint permit | | | 7/21/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/20/2000 | | 7/20/2000 | | |
|
|
|
|
Plan resubmittals received | | | 7/20/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM BRIGGS ENGINEERING 3 SET OF SITE PLAN, FORWARDED SAME TO MIKE PHILLIPS. 3/20/00, DAR
|
Plan Reviewer's activity | | | 7/20/2000 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/20/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/20/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/20/2000 | | DONE |
|
|
|
|
Telephone call | | | 7/20/2000 | | DONE |
|
|
|
called permit ready
|
Issue PAID IN FULL permit | | | 7/20/2000 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 6/8/2000 | | 7/20/2000 | | PASS |
Mike Phillips
|
|
|
7/20/2000 10:14:54 M_P - activity updated through activity BLDA022 from case BLD00-01634.
|
Routing - PLAN CHECK | 6/30/2000 | | 7/19/2000 | | |
|
|
|
routing to fire
|
Routing Off Site - STRUCTURAL | 7/7/2000 | | 7/19/2000 | | PASS |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. REVISED SHEETS A2 AND S3.1
RECEIVED OUTSIDE ENG. PLANS, ROUTED TO MIKE P. KMM
|
Plan Reviewer's activity | | | 7/19/2000 | | FAIL |
|
|
|
Need site plan to reflect building foot print.
|
Routing - FIRE | 7/19/2000 | | 7/19/2000 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/7/2000 | | DONE |
|
|
|
RECEIVED FOUR COPIES OF REVISED SHEETS A2 AND S3.1. REVISED CERT. OF VALUE. ROUTED TO OUTSIED ENG. AND MIKE P. KMM
|
Plan Reviewer's activity | | | 7/5/2000 | | FAIL |
|
|
|
Additional information required for third review.
|
Routing Off Site - STRUCTURAL | 6/29/2000 | | 7/3/2000 | | FAIL |
|
|
|
MIKE HAS SENT ONE COPY OF INHOUSE PLANS TO OUTSIDE ENG. I HAVE ASKED THAT THESE PLANS BE SENT BACK WHEN THEY ARE DONE WITH THEIR REVIEW. CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Additional information required for follow up review MJP
|
Routing - PLUMBING | 6/30/2000 | | 6/30/2000 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/29/2000 | | 6/30/2000 | | |
|
|
|
|
Plan resubmittals received | | | 6/30/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF REVISED P1 SHEET. ROUTED TO MIKE P. KMM
|
Routing - PLUMBING | 6/26/2000 | | 6/29/2000 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 6/23/2000 | | DONE |
|
|
|
RECEIVED RESUBMITTAL SHEETS A0,A2,A3,A4,A5,E1,E2,S0.1,S2.1,S4.1 AND FORWARDED TO MIKE PHILLIPS.
|
Plan Review Completed(1st rev) | | | 6/21/2000 | | FAIL |
|
|
|
Failed Bldg and Plumbing
|
Routing - FIRE | 6/19/2000 | | 6/21/2000 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/8/2000 | | 6/19/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM
Additional information required for follow up review. mjp
|
Routing - PLAN CHECK | 6/15/2000 | | 6/19/2000 | | |
|
|
|
Routing to fire for review.
|
Plan Reviewer's activity | | | 6/19/2000 | | FAIL |
|
|
|
additional informaiton required for follow up review.
|
Plan resubmittals received | | | 6/16/2000 | | DONE |
|
|
|
RECEIVED TWO COPIES OF P1 SHEETS. ROUTED TO MIKE P. KMM
|
Routing - PLUMBING | 6/13/2000 | | 6/15/2000 | | FAIL |
|
|
|
|
Routing - PLANNING | 6/12/2000 | | 6/13/2000 | | PASS |
|
|
|
x-ref. DRH99-197
|
Routing - PUBLIC WORKS | 6/8/2000 | | 6/12/2000 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/8/2000 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/8/2000 | | PEND |
|
|
|
REQUIRES ALRAM SYSTEM INFORMATION. CONTACTED GUY ROBERTSON OF THIS NEED (FAX) KMM
|
Received Certificate of Value | | | 6/8/2000 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/7/2000 | | DONE |
|
|
|
|
Application received | | | 6/7/2000 | | |
|
|
|
|