BLD-Framing/Rough-in | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 12/13/2001 9:37:49 AM walk thru, ###-#### mel...in error 12/13/2001 12:17:04 PM
|
Fee Review-notes | 6/7/2000 | 6/7/2000 | 5/9/2001 | | DONE |
|
|
|
|
Letter of compliance | | | 1/12/2001 | | DONE |
|
|
|
Letter of Compliance #21323 issued 1-12-01.
|
BLD-Final | 1/9/2001 | 1/10/2001 | 1/10/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok form perm occ when code enforcement signs perm occ 1/10/2001 3:12:45 PM
|
BLD-Final | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### need copy of s-i final letter which is at the site, also project engineer needs to address the noted deviations. 1/9/2001 11:04:07 AM 1/9/2001 11:06:08 AM
|
FIRE-Final Inspection | 1/5/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Joe Tawney
|
|
|
FIRE FN JEFF ###-#### Reinsp OK for permanant occupancy 1/8/2001 5:21:16 PM
|
FIRE-Final Inspection | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail AHU shutdown 1/5/2001 1:38:10 PM
|
BLD-Framing/Rough-in | 11/20/2000 | 11/21/2000 | 11/21/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### link framing ok 11/21/2000 11:17:01 AM
|
FIRE-Final Inspection | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | PASS |
Joe Tawney
|
|
|
FIRE FN JASON ###-#### Reinsp Ok for certificate of completion 11/14/2000 7:55:54 AM
|
BLD-Concrete | 11/1/2000 | 11/2/2000 | 11/2/2000 | P | PART |
Carl Dependahl
|
|
|
stem wall -- ted ###-####; link area, ok pend spec insp reports 11/2/2000 2:43:39 PM
|
BLD-Footing | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | PART |
Carl Dependahl
|
|
|
ft insp-- ted ###-####
|
BLD-Final | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | FAIL |
Dave Hannah
|
|
|
TEMP OCC- ###-####- TED
|
BLD-Final | 10/30/2000 | 10/30/2000 | 10/30/2000 | P | CANC |
Carl Dependahl
|
|
|
temp occ Ted Parret ###-####
|
BLD-Final | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | FAIL |
Carl Dependahl
|
|
|
TEMP ###-####; c/n, spec insp reports, truss eng'g, complete gaurdrails, etc 10/25/2000 12:27:14 PM
|
FIRE-Final Inspection | 10/24/2000 | 10/24/2000 | 10/24/2000 | P | PART |
Joe Tawney
|
|
|
Ted ###-#### OK on alarm test for new loading dock Also see FIR00-00595 10/25/2000 8:01:03 AM
|
Code Occupancy Approval | | | 10/23/2000 | | FAIL |
|
|
|
Temporary signed for Phase I of proj. Landscaping at rear complete. PHASE I ONLY
|
BLD-Framing/Rough-in | 9/18/2000 | 9/19/2000 | 9/19/2000 | P | PART |
|
|
|
Ted Parrott ###-#### o cover ext walls after insulationTed Parrott ###-#### 9/19/2000 3:03:48 PM
|
BLD-Framing/Rough-in | 9/18/2000 | 9/19/2000 | 9/19/2000 | P | PART |
|
|
|
Ted Parrott ###-#### o cover ext walls after insulationTed Parrott ###-#### 9/19/2000 3:03:48 PM
|
BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### 9/11/2000 4:08:53 PM hear nail ok for ext at loading dock 9/11/2000 4:09:17 PM
|
BLD-Foundation | 8/7/2000 | 8/8/2000 | 8/8/2000 | A | PART |
Tom Arcoraci
|
|
|
Ted ###-####
|
BLD-Footing | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | PART |
Carl Dependahl
|
|
|
late morning ###-#### jeff; pend insp report 8/4/2000 11:32:22 AM
|
Inspection Record Card- Bld | | | 8/2/2000 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/2/2000 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/2/2000 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/1/2000 | 8/1/2000 | 8/1/2000 | | PASS |
|
|
|
RECEIVED APPROVAL OF STRUCTURAL RESUBMITTALS FROM KEITH JONES, AHJ, INC. PLANS APPROVED AS NOTED AND ATTACHED.
|
Routing Off Site - STRUCTURAL | 7/21/2000 | 7/17/2000 | 8/1/2000 | | PASS |
|
|
|
Sent copy of engineers response to AHJ for review in response to their comments of 7/17/00.
RECEIVED FAX COPY OF APPROVAL OF STRUCTURAL PLAN RESUBMITTALS FROM KEITH JONES, AHJ.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2000 | | PASS |
|
|
|
ROUTING TO PERMIT DESK FOR ISSUANCE.
|
Plan assigned to (DRS) | 6/15/2000 | | 8/1/2000 | | PASS |
Dan Stuart
|
|
|
8/1/2000 15:38:54 DRS - activity updated through activity BLDA022 from case BLD00-01643.
|
Routing - FIRE | 7/26/2000 | 7/28/2000 | 7/28/2000 | | DONE |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 7/28/2000 | | 7/28/2000 | | PEND |
|
|
|
Received nw certificate of value including plumbing bvalue breakout and completed special inspection form. Waiting for response from peer review structural engineering of project engineers resubmittals. Called AHJ to check on progress of review or if additional items are needed. Keith Jones to call me back this p.m. to review.
|
Routing - PLAN CHECK | 7/17/2000 | | 7/25/2000 | | FAIL |
|
|
|
Inserted new plan sheets into the original plan set submitted for review. Received new structural sheets S1.1, S1.2, S2.1 & S2.2 and new site plan with modified hydrant location and clearance access for fire department per their plan review. Third party outside structural peer review was failed and required resubmittal.
This response information was forarded to AHJ by fax. Routing plans to fire code analyst for review of re-submittals.
|
Plan resubmittals received | | | 7/21/2000 | | DONE |
|
|
|
RECEIVED PLAN RESUBMITTALS FROM BRSTW0 SETS OF SITE,MECHANICAL AND STRUCTURAL PLANS, FORWARDED SAME TO DAN STUART PER MARLENES INSTRUCTION. 7/21/00 DAR
|
Plan resubmittals received | | | 7/21/2000 | | |
|
|
|
Received response from Pinnacle Engineering, Darren Truchot, in response to third party structural review comments of 7/17/00. Forwarded to Keith Jones @ AHJ for review.
|
Routing - FIRE | 7/12/2000 | 7/17/2000 | 7/17/2000 | | FAIL |
Bill Alexander
|
|
|
Site Access problems. Hydrant blockage.
|
Routing Off Site - STRUCTURAL | 7/10/2000 | | 7/17/2000 | | FAIL |
|
|
|
CONTACTED PDQ TO TAKE PLANS TO OUTSIDE ENG. LEFT MESSAGE WITH MIKE CAPSHAW FOR AN ADDITIONAL SET OF PLANS. 7/17/2000-RECEIVED A RESPONSE FROM ENGINEER AND FAXED COPY TO MIKE CAPSHAW. ENGINEERING IS NOT APPROVED AT THIS TIME. (mys)
|
Plan Reviewer's activity | | | 7/17/2000 | | DONE |
|
|
|
FAXED A COPY OF THE ENGINEERS PLAN REVIEW TO MIKE CAPSHAW AT BRS ON BEHALF OF DAN STUART. MYS
|
Plan Review Completed(1st rev) | | | 7/17/2000 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/12/2000 | | |
|
|
|
Faxed & mailed copy of preliminary review comments to Mike Capshaw for response.
|
Routing - PLAN CHECK | 7/7/2000 | | 7/12/2000 | | FAIL |
|
|
|
RESUBMITTALS REQUIRED. FAXED AND MAILED COPY OF PLAN REVIEW COMMENTS TO ARCHITECT, MIKE CAPSHAW, FOR RESPONSE. ROUTING TO FIRE CODE ANALYST FOR REVIEW.
|
Routing - PUBLIC WORKS | 7/6/2000 | | 7/7/2000 | | PASS |
|
|
|
Brian Murphy approved drainage.
|
Additional plans submitted | | | 7/6/2000 | | |
|
|
|
THIRD SET OF PLANS SUBMITTED FOR USE BY PEER REVIEW STRUCTURAL ENGINEER CONTRACTED WITH BOISE CITY, AS REQUESTED.
|
Telephone call | | | 7/6/2000 | | DONE |
|
|
|
LEFT A MESSAGE WITH MIKE CAPSHAW REQUESTING AN ADDITIONAL SET OF PLANS FOR OUTSIDE ENG. KMM
|
Routing - PLANNING | 6/20/2000 | | 6/27/2000 | | PASS |
|
|
|
Approve per DRH00-76 & DRH00-136 and as noted to comply with conditions regarding landscaping and handicapped parking.
|
Routing - PLAN CHECK | 6/27/2000 | | 6/27/2000 | | PEND |
|
|
|
PLAN REVIEW STILL INCOMPLETE. PW CALLED TO SAY THEY ARE READY TO RE-CHECK PLANS. I WILL BE OUT OF TOWN UNTIL NEXT MONDAY, 7/10/00, SO I AM ROUTING PLANS BACK TO PW.
|
Routing - PUBLIC WORKS | 6/15/2000 | | 6/20/2000 | | FAIL |
|
|
|
REQUIRES 5 MORE COPIES. PER BRIAN M. KMM
|
Pending Assignment by MYS | 6/7/2000 | | 6/15/2000 | | DONE |
Marlene Southard
|
|
|
|
Plan routing begun/TENANTS | | | 6/15/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLANNING, PLAN CHECK and FIRE.
|
Plans ACCEPTED BY PLAN TECH | | | 6/12/2000 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/9/2000 | | HOLD |
|
|
|
REQUIRES 1.SPEC. BOOKS IF HAVE THEM
2. THREE ADD. CIVIL DRAWINGS
3. MECH. PLANS WERE NOT STAMPED OR SIGNED.
FAXED AND LEFT MESSAGE WITH MIKE CAPSHAW. PUT PLANS IN HOLD BOX. KMM
6/12/00 RECEIVED ABOVE INFORMATION. KMM
|
Received Certificate of Value | | | 6/7/2000 | | DONE |
|
|
|
|
Application received | | | 6/7/2000 | | |
|
|
|
|