BLD-Final | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 10:42:50. Contact: ###-####.--gar door code 1092 C/C issued 1/15/2002 1:55:31 PM
|
DOC - Permit Finaled | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | PASS |
Jim Sly
|
|
|
Finaled by inspector at 1/15/2002 1:55:44 PM
|
BLD-Final | 7/9/2001 | 7/10/2001 | 7/10/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### garage code 8841092 C/N on site. 7/10/2001 2:24:47 PM
|
BLD-Final | 1/11/2001 | 1/12/2001 | 1/12/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/11/2001 at 11:33:30. Contact: ###-####. No access and no answer at contact #....Left note. 1/12/2001 9:24:18 AM
|
BLD-Energy code compliance | 11/3/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/03/2000 at 15:53:36. Contact: ###-####. Frame OK. 11/7/2000 8:44:10 AM
|
BLD-Framing/Rough-in | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/02/2000 at 16:33:19. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | PART |
Jim Sly
|
|
|
SHEAR WALL-- DEAN ###-#### shear OK 10/23/2000 1:54:03 PM
|
BLD-Foundation | 9/12/2000 | 9/13/2000 | 9/13/2000 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PART |
Jim Sly
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 8/31/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/7/2000 | | PEND |
|
|
|
7/7/00 9:30 Called and left many messages with builder about needing more infor to make complete plans. I finally used ONE set.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/7/2000 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2000 | | DONE |
|
|
|
told them permit was ready
|
Plan assigned to (SAM) | 6/23/2000 | | 7/7/2000 | | PASS |
Steve Munroe
|
|
|
7/7/2000 09:39:42 SAM - activity updated through activity BLDA022 from case BLD00-01656.
|
Pending Assignment by DJO | 6/8/2000 | | 6/23/2000 | | DONE |
Dan Overy
|
|
|
|
Routing - PUBLIC WORKS | 6/8/2000 | 6/8/2000 | 6/9/2000 | | PASS |
|
|
|
|
Routing - PLANNING | 6/8/2000 | 6/8/2000 | 6/8/2000 | | PASS |
|
|
|
|
Application received | | | 6/8/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 6/9/2000 | 6/9/2000 | | | PEND |
|
|
|
|
Plan Reviewer's activity | | | | | PEND |
|
|
|
6/26/00 8:02 Called and left a message on the answering machine of Borup Construction. I let them know that I need a beam size in basement, engineering on the rear wall and wall bracing shown on the second floor.
|
Print Pending Permit.LaserJet4 | | | | | |
|
|
|
|
Plan Review Report | | | | | |
|
|
|
|