BLD-Conference | 6/10/2002 | 6/11/2002 | 6/11/2002 | A | PASS |
Tony Young
|
|
|
just needs to be doc finaled
|
DOC - Permit Finaled | 6/11/2002 | 6/11/2002 | 6/11/2002 | A | PASS |
Tony Young
|
|
|
Finaled by inspector at 6/11/2002 9:21:06 AM
|
BLD-Final | 11/2/2001 | 11/2/2001 | 11/2/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### gary c.c # 21998 ISSUED AT TIME OF INSPECTION STAIRS WERE IN CODE 11/2/2001 2:08:24 PM
|
BLD-Grading Inspection | 11/1/2001 | 11/1/2001 | 11/1/2001 | | BOND |
Rita DeYoung
|
|
|
Rough grading is complete. Fine grading and revegetation are not. The engineer has recommended an $800.00 bond for the incomplete work. Upon receipt of this bond the grading is conditionally approved.
|
BLD-Final | 11/1/2001 | 11/1/2001 | 11/1/2001 | P | FAIL |
Dave Hannah
|
|
|
GARY CELL ###-#### stair risers out of code 11/1/2001 1:34:20 PM
|
BLD-Final | 10/29/2001 | 10/30/2001 | 10/30/2001 | P | FAIL |
Tony Young
|
|
|
###-#### ALISHA
need sign offs for hillside, did walk through for contractor to give punch list, no formal inspection made 10/30/2001 1:10:06 PM
|
BLD-Framing/Rough-in | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PASS |
Tony Young
|
|
|
Reinspection - Gary, ###-####
|
BLD-Energy code compliance | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PASS |
Tony Young
|
|
|
Gary, ###-####
|
BLD-Framing/Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 | A | PASS |
Tony Young
|
|
|
Gary ###-####
done w/ 420 5/24/2001 12:57:10 PM
|
BLD-Framing/Rough-in | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PART |
Steven Webb
|
|
|
c/n posted, ok to insulate pending mech. pass. also pending arch. approval on shear 5/24/2001 12:41:54 PM
|
BLD-Framing/Rough-in | 5/16/2001 | 5/17/2001 | 5/17/2001 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted, trades, int. shear, address, plans etc. 5/17/2001 11:57:32 AM
|
BLD-Conference | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PART |
Tony Young
|
|
|
Added by Inspector: 415 On 5/14/2001 1:51:23 PM ext. shear ok per eng. letter of approval as built
|
BLD-Foundation | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 10:16:28. Contact: ###-####.
wip, ok per plan 1/8/2001 12:13:17 PM
|
BLD-Footing | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/28/2000 at 14:34:00. Contact: ###-####. garage ft ok 12/29/2000 12:02:18 PM
|
BLD-Foundation | 12/6/2000 | 12/6/2000 | 12/6/2000 | P | PART |
Tony Young
|
|
|
###-####
ok on found. walls except garage 12/6/2000 12:45:06 PM
|
BLD-Footing | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | PART |
Steven Webb
|
|
|
Scheduled by Inspector: 415 On 11/21/2000 1:57:16 PM re-inspection: main wall inspection according to plans. 11/22/2000 9:09:49 AM: phone ok from Terry Records. 11/22/2000 9:31:11 AM
|
BLD-Footing | 11/21/2000 | 11/21/2000 | 11/21/2000 | P | PART |
Tony Young
|
|
|
###-#### gary
not all the way ready yet, will recall 11/21/2000 2:54:14 PM
|
BLD-Footing | 11/17/2000 | 11/20/2000 | 11/20/2000 | A | CANC |
Dave Hannah
|
|
|
###-####
|
Override - Parcel Holds | | | 7/25/2000 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/25/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/24/2000 | | DONE |
|
|
|
received information needed on 7-19-2000. was instructed to lay plan aside and start on different project.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/24/2000 | | DONE |
|
|
|
|
Telephone call | | | 7/24/2000 | | DONE |
|
|
|
Called Kevin McKee Assoc at ###-####
|
Plan Review Report | | | 7/24/2000 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/24/2000 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/19/2000 | | PEND |
|
|
|
called Kevin McKee's firm and talked with John T. about additional information needed. window schedules, sq. footages, and other items. will provide as soon as possible. also called Pinnacle Engineers and spoke to Bob Bolen about identification and location of specified shear walls and holdowns. calculations do not appear to match what is on plans. will be contacted after most recent set of plans is gone over by engineer.
|
Plans ACCEPTED BY PLAN CHECK | | | 7/17/2000 | | PEND |
|
|
|
|
Pending Assignment by DJO | 7/17/2000 | | 7/17/2000 | | PEND |
Dan Overy
|
|
|
|
Routing - PLANNING | 6/21/2000 | 6/21/2000 | 6/26/2000 | | PASS |
|
|
|
roger passed 6/26/00
|
Routing - PUBLIC WORKS | 6/12/2000 | 6/12/2000 | 6/21/2000 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 6/12/2000 | 6/12/2000 | 6/20/2000 | | DONE |
Rita DeYoung
|
|
|
APPROVED AS CATEGORY 1. CAT 1 BECAUSE OF 7 FEET OF FILL FOR DRIVEWAY. CONDITIONS OF APPROVAL IN LETTER ATTACHED TO PLANS
|
Application received | | | 6/12/2000 | | |
|
|
|
|
Routing - PLAN CHECK | 6/26/2000 | 6/26/2000 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 6/12/2000 | | | | PEND |
Dan Overy
|
|
|
|
Case Summary (BLD) | | | | | |
|
|
|
|