Description
MICRON BUILDING #36 SECTIONS "B,C &D" (PCS 3157) * TO CONSTRUCT A NEW 216,000 SQ. FT., TWO STORY WITH A 2100 SQ. FT. BASEMENT OFFICE SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS BEING CONSTRUCTED OF CONCRETE TILT-UP EXTERIOR WALLS, STEEL FRAME AND MASONRY AREA SEPARATION WALLS. THIS BUILDING IS BEING DIVIDED INTO THREE 72,000 SQ. FT., TWO STORY SECTIONS BY TWO-HOUR FIRE-RESISTIVE AREA SEPARATION WALLS FOR ALLOWABLE AREA REQUIREMENTS. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR ALLOWABLE AREA INCREASE. THE ONE STORY CAFETERIA SECTION IS BEING CONSTRUCTED UNDER A SEPARATE PERMIT (bld00-01980). THIS BUILDING IS A CONTINUATION OF THE BUILDING #24 EXPANSION BEING CONSTRUCTED UNDER SEPARATE PERMITS. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. DRH00-00072/PC#467-00/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes6/15/20006/15/20001/28/2004 DONE
Letter of compliance  5/14/2003 DONE
Letter of Compliance #22934 issued 5-14-03.
BLD-Aging Inspection4/21/20034/21/20034/21/2003 PART
DetailsJim Storey
paul working with cathy w. 4/21/2003 4:39:42 PM
Inspection Record Card- Bld  4/21/2003 DONE
Print Occupancy Form  4/21/2003 DONE
BLD-Aging Inspection2/17/20032/17/20032/17/2003 PASS
DetailsJim Storey
paul markalina and doug karcher are looking through the micron archive to locate the lost card . 2/19/2003 8:10:50 AM
Case Summary (BLD)  1/18/2002  
FIRE-Final Inspection11/20/200111/20/200111/20/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 11/20/2001 7:19:45 PM
Code Occupancy Approval  11/13/2001 PASS
FINAL SIGNED OFF, TO HOLD LAST BUILDING FOR BOND IF NEEDED.
(F) Reprint permit  8/3/2001 DONE
BLD-Framing/Rough-in2/8/20012/9/20012/9/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/08/2001 at 17:14:56. Contact: ###-####. called in on wrong permit # 2/12/2001 12:59:09 PM
BLD-Concrete11/9/200011/13/200011/13/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/09/2000 at 16:26:51. Contact: ###-####. placed with special insp. pending report. 11/13/2000 9:31:25 PM
BLD-Concrete11/1/200011/3/200011/3/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 10:58:23. Contact: ###-####. placed with special insp pending report. 11/3/2000 3:14:04 PM
BLD-Concrete11/1/200011/2/200011/2/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 10:57:40. Contact: ###-####. placed with special insp; pending report. 11/2/2000 9:44:00 AM
BLD-Concrete11/1/200011/1/200011/1/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 10:56:59. Contact: ###-####. placed with special insp.pending report. 11/1/2000 4:12:59 PM
BLD-Concrete10/26/200010/30/200010/30/2000PPART
DetailsJim Storey
Steve ###-####
BLD-Concrete10/25/200010/26/200010/26/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/25/2000 at 15:42:23. Contact: ###-####. placed w special insp pending report. 10/26/2000 1:26:21 PM
BLD-Concrete10/23/200010/25/200010/25/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2000 at 16:31:45. Contact: ###-####.
BLD-Concrete10/23/200010/25/200010/25/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2000 at 16:31:45. Contact: ###-####.
BLD-Concrete10/23/200010/24/200010/24/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2000 at 16:31:03. Contact: ###-####. placed with special insp. pending report. 10/24/2000 2:10:00 PM
BLD-Concrete10/19/200010/23/200010/23/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/19/2000 at 14:32:01. Contact: ###-####.
BLD-Concrete10/19/200010/19/200010/19/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/19/2000 at 07:37:37. Contact: ###-####. pending report. 10/19/2000 5:05:48 PM
BLD-Concrete10/17/200010/17/200010/17/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/17/2000 at 09:11:13. Contact: ###-####.
BLD-Footing9/25/20009/25/20009/25/2000PPART
DetailsJim Storey
ft insp-- steve ###-#### placed w/special insp. 9/25/2000 2:58:39 PM
BLD-Concrete9/21/20009/22/20009/22/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/21/2000 at 16:43:09. Contact: ###-####.
BLD-Concrete9/20/20009/20/20009/20/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 08:30:34. Contact: ###-####. placed with special insp. 9/20/2000 5:22:33 PM
BLD-Concrete9/20/20009/20/20009/20/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 08:30:34. Contact: ###-####. placed with special insp. 9/20/2000 5:22:33 PM
BLD-Concrete9/18/20009/19/20009/19/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/18/2000 at 13:58:20. Contact: ###-####. slab ok 9/19/2000 9:03:13 AM
BLD-Concrete9/14/20009/14/20009/14/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/14/2000 at 07:12:35. Contact: ###-####. walls on elavator pit top out apears ok pending special insp report. rebar inprogress. 9/14/2000 3:54:36 PM
BLD-Concrete9/13/20009/13/20009/13/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/13/2000 at 10:14:21. Contact: ###-####. covered with special insp. pending reports. 9/13/2000 5:52:35 PM
BLD-Concrete9/11/20009/12/20009/12/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/11/2000 at 11:05:52. Contact: ###-####. pending report. 9/12/2000 8:50:43 AM
BLD-Concrete9/11/20009/11/20009/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/11/2000 at 11:05:08. Contact: ###-####. pending report. 9/11/2000 4:54:50 PM
BLD-Concrete9/8/20009/8/20009/8/2000PPART
Details
Scheduled by a contractor via Hello! on 09/08/2000 at 07:26:48. Contact: ###-####. pending sp nsp aprovals 9/8/2000 2:16:04 PM
BLD-Concrete9/6/20009/7/20009/7/2000APART
Details
Scheduled by a contractor via Hello! on 09/06/2000 at 13:31:32. Contact: ###-####. pending sp insp approvals 9/8/2000 7:20:57 AM
BLD-Concrete9/5/20009/6/20009/6/2000APART
Details
steve-- ###-#### ext 241--for concrete for the 1st slab pur pending sp insp approvals 9/6/2000 11:47:13 AM
BLD-Footing8/28/20008/29/20008/29/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/28/2000 at 15:50:45. Contact: ###-####. rebar ok pending report from special insp. 8/29/2000 10:12:03 AM
BLD-Footing8/28/20008/28/20008/28/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/28/2000 at 10:59:30. Contact: ###-####.
BLD-Foundation8/24/20008/24/20008/24/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/24/2000 at 08:19:23. Contact: ###-####. area #6 rebar and pads ok. 8/24/2000 3:58:35 PM
BLD-Footing8/21/20008/22/20008/22/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/21/2000 at 15:58:04. Contact: ###-####. cold joint in footing no horrizontal splice bar/ lap on horr bar not stagered spice at laps/ rain leader piping three locations not compacted under footing/ #4 bar tranverse to slab spacing over 3 ft spec. aprox. 40 to 42 inches o.c./ trench footing needs cleaned loose dirt. 8/22/2000 9:36:42 AM
BLD-Footing8/14/20008/15/20008/15/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/14/2000 at 16:54:52. Contact: ###-####. n/r 8/15/2000 5:07:19 PM
BLD-Foundation8/11/20008/14/20008/14/2000APART
DetailsJim Storey
Steve Smith ###-#### ext 41 they are going to start pouring at 10 covered by special insp pending report 8/14/2000 10:22:39 AM. 8/14/2000 10:22:44 AM
(F) Reprint permit  8/14/2000 DONE
Issue & PRINT permit  8/11/2000 DONE
Routing Off Site - A.C.H.D8/10/20008/10/20008/10/2000 DONE
per Larry Sale and Jeff can issue without ACHD approval
Routing - PUBLIC WORKS8/8/2000 8/9/2000 PASS
Routing - PLAN CHECK8/9/20008/9/20008/9/2000 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/9/2000 PASS
Inspection Record Card- Bld  8/9/2000 DONE
Plan assigned to (JCM)6/16/2000 8/9/2000 PASS
DetailsJohn Menard
8/9/00 11:40:39 JCM - activity updated through activity BLDA022 from case BLD00-01726.
Routing - FIRE8/1/20008/4/20008/8/2000 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  8/8/2000 FAIL
P.W's
Routing - PLAN CHECK7/5/2000 8/1/2000  
ON HOLD WAITING FOR SITE DRAINAGE PACKAGE SO PLANS CAN BE ROUTED BACK TO BRIAN MURPHY.
Routing Off Site - STRUCTURAL7/27/2000 7/31/2000 PASS
CONTACTED PDQ TO TAKE REVISED PLANS DATED 7-27-2000 TO OUT SIDE ENG. KMM RECEIVED AN E-MAIL FROM THE CONSULTING STRUCTURAL ENGINEER INDICATING THAT HE HAD APPROVED THE RESUBMITTED REVISED PLAN SHEETS. JCM
Plan resubmittals received  7/31/2000 DONE
RECEIVED PLAN RESUBMITTALS FROM ER + HDR TWO SETS OF SHEETS C5.1, A2.5.3, A6.3, A6.4 AND SMALL DOCUMENTS, FORWARDED SAME TO JOHN MENARD. 7/31/00 DAR
Plan resubmittals received  7/27/2000 DONE
RECEIVED THREE COPIES OF REVISED STRUCT. SHEETS S2.1, S2.1.3, S3.2, S3.3, S4.5, AND PLAN REVIEW COMMENTS DATED 7-14-2000 ROUTED TWO COPIES TO JOHN AND ONE COPY TO OUTSIDE ENG. KMM
Plan resubmittals requested  7/17/2000 PEND
FAXED FRANK KVAPIL A COPY OF THE COMMENT LIST FROM THE CONSULTING STRUCTURAL ENGINEER REQUESTING REVISIONS.
Routing Off Site - STRUCTURAL6/23/2000 7/17/2000  
CONTACTED PDQ TO TAKE REVISED PLANS OUT TO OUTSIDE ENG. KMM
Routing Off Site - STRUCTURAL6/16/2000 7/14/2000 FAIL
CONTACTE PDQ TO TAKE PLANS TO OUTSIDE ENG. KMM RECEIVED COMMENT LIST FROM CONSULTING ENGINEER REQUESTING REVISIONS.
Routing - PLUMBING6/30/2000 7/5/2000 PASS
DetailsBill VanDegrift
waste and vent and storm drainage below grade only, per plans and 97 upc
Plan resubmittals requested  6/30/2000 PEND
MAILED A COPY OF THE PLAN REVIEW COMMENT LIST TO RICK HUNTER AT ER+HDR FOR REQUIRED REVISIONS. JCM
Routing - PLANNING6/20/2000 6/21/2000 PASS
Approve per DRH00-72
Plans ACCEPTED BY PLAN TECH  6/21/2000 DONE
Plan resubmittals received  6/21/2000 DONE
RECEIVED THREE COPIES OF SHEETS A1.0, A2.1.3B, A2.1.0.1, A2.1.0, A2.2.01, A2.2.1, A2.2.2, A2.2.0, A2.3.0, S2.0.3, S2.1.3, S3.4. ROUTED TO JOHN M. KMM
Routing - PUBLIC WORKS6/16/2000 6/20/2000 FAIL
CANNOT APPROVE PRIOR TO APPROVAL OF DRAINAGE PLANS. PER BRIAN M. KMM
Plan routing begun/NEW & ADDTN  6/16/2000 DONE
Plans ACCEPTED BY PLAN TECH  6/16/2000 FAIL
PLANS REQUIRE 1. SITE PLAN
2. ARCH. SHEETS REQUIRE DIMENSIONS
3. A2.13B AND S2.03 NOT STAMPED OR SIGNED
4. LANDSCAPE PLANS WILL BE SUBMITTED WITH CP5 PACKAGE
5.DRAINAGE WILL BE SUBMITTED WITH CP5 PACKAGE
CONTACTED RICK HUNTER OF THESE NEEDS. HE MAY COME DOWN AND TAKE OUT SHEET A2.13B AND S2.03. KMM
Received Certificate of Value  6/15/2000 DONE
Recd Pcfee & Taken To Pln CK  6/15/2000 DONE
Application received  6/15/2000  
Print Occupancy Form