Case Summary (BLD) | | | 10/7/2013 | | DONE |
|
|
|
|
Fee Review-notes | 6/19/2000 | 6/19/2000 | 5/9/2001 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/18/2000 | | DONE |
|
|
|
Perm. Occ. Cert. #8383 issued 9-18-00 to Quizno's in the Capitol Village Bldg. #3.
|
Permanent Occupancy | | 9/8/2000 | 9/8/2000 | | DONE |
|
|
|
|
BLD-Final | 9/7/2000 | 9/8/2000 | 9/8/2000 | P | PASS |
|
|
|
###-#### c/n removed corrections completed ok for perm 9/8/2000 2:12:59 PM
|
Temporary occupancy | | | 8/29/2000 | | PART |
|
|
|
Temp. Occ. Cert. #4055 issued 8-29-00 to Quizno's.
|
FIRE-Final Inspection | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PASS |
Rick Jackson
|
|
|
rob-- ###-#### fire fn
|
BLD-Final | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PART |
Jim Storey
|
|
|
rob-------###-#### fn occ tenp ok pending reinsp for gyp on back of tenent wall and saftey glazing at univesity dr. door. 8/29/2000 11:01:49 AM
|
FIRE-Final Inspection | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 8/25/2000 12:54:09 PM 17th flr Suite 1700 McLeod 8/25/2000 12:55:51 PM
|
BLD-Final | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | FAIL |
Jim Storey
|
|
|
###-#### pending fire sign off. 8/25/2000 4:23:35 PM
|
BLD-Final | 8/17/2000 | 8/18/2000 | 8/18/2000 | A | PART |
Jim Storey
|
|
|
Rob ###-#### ceilling to be checked for sperader bars and mec supports. 8/18/2000 2:29:47 PM
|
BLD-Framing/Rough-in | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PART |
Jim Storey
|
|
|
Rob ###-####
|
Plan assigned to (JCB) | 6/23/2000 | | 7/13/2000 | | PASS |
Jason Blais
|
|
|
7/13/2000 10:43:20 JCB - activity updated through activity BLDA022 from case BLD00-01755.
|
Routing - PLAN CHECK | 7/12/2000 | | 7/13/2000 | | PASS |
|
|
|
Plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2000 | | PASS |
|
|
|
|
Print Occupancy Form | | | 7/13/2000 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/13/2000 | | DONE |
|
|
|
|
Telephone call | | | 7/13/2000 | | DONE |
|
|
|
called talked to Harry gave dollar amount
|
Issue PAID IN FULL permit | | | 7/13/2000 | | DONE |
|
|
|
|
Routing - FIRE | 7/10/2000 | 7/12/2000 | 7/12/2000 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 7/12/2000 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 6/30/2000 | | 7/10/2000 | | FAIL |
|
|
|
Plan review report sent and faxed to architect. Written response to a couple of items needed. Plans routed to fire dept. for review.
|
Plan resubmittals requested | | | 7/10/2000 | | PEND |
|
|
|
Written response required to plan review report.
|
Routing - PLUMBING | 6/27/2000 | | 6/30/2000 | | PASS |
|
|
|
pipe t&p drain to mop sink, no floor drain will be allowed with in a cabinet, cross connection protection may be required at equipment- soda mech coffee maker, etc., if an automatic soap disp. is used at the mop sink provide a water supply for it.
|
Plan resubmittals received | | | 6/28/2000 | | DONE |
|
|
|
Received resubmittals P0.0, P.01, P1.0 and added to the plans in circulation.
|
Routing - PUBLIC WORKS | 6/23/2000 | | 6/27/2000 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 6/23/2000 | | DONE |
|
|
|
Route to PUBLIC WORKS, PLUMBING, PLAN CHECK and FIRE. Previously approved by Carol Johnson, Central District Health.
|
Pending Assignment by MYS | 6/23/2000 | | 6/23/2000 | | DONE |
Marlene Southard
|
|
|
|
Telephone call | | | 6/22/2000 | | DONE |
|
|
|
SPOKE WITH APPLICANT ABOUT SUBMITTING MECH. PLANS. I TOLD HIM HE NEEDS TO SPEAK WITH HIS ARCH. IF ANY QUESITONS HE MAY CALL ME. KMM
|
Plans ACCEPTED BY PLAN TECH | | | 6/21/2000 | | FAIL |
|
|
|
REQUIRES TWO COPIES OF STAMPED AND SIGNED MECH. PLANS. CONTACTED AND FAXED HARRY COZAKES. KMM
|
Received Certificate of Value | | | 6/19/2000 | | DONE |
|
|
|
|
Application received | | | 6/19/2000 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | | | |
|
|
|
|